7
Name Ghulam Mujtaba Profession QA/QC ENGINEER Total Experience 9 Years Nationality Pakistani Languages English, Arabic, Urdu Contact details Mob. K.S.A +966 59 0554177 E-mail: [email protected] PROFESIONAL CAREER HIGHLIGHTS A lead civil engineer with 9 years of working experience in Kingdom Of Saudi Arabia & Pakistan As a QA/QC Engineer, manage and handled the team of 4 QC Inspectors. Extensive experience in site management of multi-disciplined projects; hands on and control supervision, cost estimating, contract negotiation and meeting difficult deadlines under pressure with limited resources. Documenting, Surveillance and witness sub contractor QC representative performing job as per QMS. Contractor performing job as per method statement, ITP, IFC Drawings and Project Specification. Prepare Project Quality Plan, Quality Procedures, Inspection and Test Plan, Construction methodologies and test procedures for the project. Very good understanding of ISO 9001-2008 Quality Management System. Attended QA/QC awareness trainings and seminars conducted by Quality manager at construction site. Implementation of QA/QC system from Project starts to final project dossier. Familiar with various local/International codes and standards such as; SAUDI ARAMCO, ACI, ASTM, BSI, AASHTO, UBC, ANSI, etc. Maintain high-quality standards, understand key process issues, and ensures process improvements are implemented. Review documents submittals and evaluate its integrity and compliance as per project drawings and specifications, review and approval of material and material inspections. Establish and maintain positive, effective working relationships and communication with Project Teams, Third Party Field Technicians, Owners, Architects and Subcontractors. MAJOR PROJECTS Curriculum Vitae of Ghulam MujtabaPage 1

Ghulam mujtaba updated cv

Embed Size (px)

Citation preview

Page 1: Ghulam mujtaba updated cv

Name Ghulam MujtabaProfession QA/QC ENGINEERTotal Experience 9 YearsNationality PakistaniLanguages English, Arabic, UrduContact details Mob. K.S.A +966 59 0554177

E-mail: [email protected]

PROFESIONAL CAREER HIGHLIGHTS A lead civil engineer with 9 years of working experience in Kingdom Of Saudi Arabia & Pakistan As a QA/QC Engineer, manage and handled the team of 4 QC Inspectors. Extensive experience in site management of multi-disciplined projects; hands on and control supervision, cost

estimating, contract negotiation and meeting difficult deadlines under pressure with limited resources. Documenting, Surveillance and witness sub contractor QC representative performing job as per QMS. Contractor

performing job as per method statement, ITP, IFC Drawings and Project Specification. Prepare Project Quality Plan, Quality Procedures, Inspection and Test Plan, Construction methodologies and test

procedures for the project. Very good understanding of ISO 9001-2008 Quality Management System. Attended QA/QC awareness trainings and seminars conducted by Quality manager at construction site. Implementation of QA/QC system from Project starts to final project dossier. Familiar with various local/International codes and standards such as; SAUDI ARAMCO, ACI, ASTM, BSI, AASHTO,

UBC, ANSI, etc. Maintain high-quality standards, understand key process issues, and ensures process improvements are

implemented. Review documents submittals and evaluate its integrity and compliance as per project drawings and

specifications, review and approval of material and material inspections. Establish and maintain positive, effective working relationships and communication with Project Teams, Third

Party Field Technicians, Owners, Architects and Subcontractors.

MAJOR PROJECTS

7 Stories High Rise Ministry Of Interior Head Quarter Dhaban in Jeddah K.S.A. Construction of New Haramain High Speed Railway Station King Abdullah Economic City (KAEC) K.S.A. Construction of New Haramain High Speed Railway Track 380KV S/S (HHR-5) Wadi Al-Farah Maddinah K.S.A. Development of King Abdul Aziz Endowment Project (DOKAAEP) Makkah K.S.A. Dynamic Reactive Power Compensation Project SEC-COA Part-II 110KV S/S SVC AFIF K.S.A. Construction of NAMERAH North 380/132KV BSP K.S.A. Power Supply to Pumping Stations at SHAQAIQ Phase-II, WTS (132/13.8KV PSA-2 S/S K.S.A. Power Supply to Pumping Stations at SHAQAIQ Phase-II, WTS (132/13.8KV PSA-3 S/S K.S.A.

Curriculum Vitae of Ghulam Mujtaba Page 1

Page 2: Ghulam mujtaba updated cv

Construction of Logistics Command Mess Building, Naval Admin Block Karachi Pakistan.

QUALIFICATION & TRAININGSB.E Civil Engineering from Mehran University of Engineering & Technology, Jamshoro PakistanAWARENESS OF ISO-9001 QMS (LEAD AUDITOR) IN ESEC @ HHR KAEC STATION THUAL K.S.A COMPUTER COURSE from Mehran University of Engineering & Technology, Jamshoro PakistanPrimavera P6 (Project Planner)QUALITY MANAGEMENT SYSTEM from EL-SEIF Engineering & Contracting (KAEC)Awareness of QA/QC System & Role of QC from EL-SEIF Engineering & Contracting (KAEC)

DETAILED JOB EXPERIENCE

a) December 2012 to DatePOSITION QA/QC ENGINEEREMPLOYER EL-SEIF ENGINEERING AND CONTRACTING COMPANYPROJECT #1 Construction of Ministry of Interior Headquarter Dhaban Jeddah K.S.A.CONSULTANT ARCHEN ENGINEERING CONSULTANT

Duties & Responsibilities:

Monitor all quality related activities to ensure that the quality of the phases of the project is according to the approved standards.

Preparing all documents required in the ISO and other quality management systems deployed and following up on any implementation requirements that may arise.

Prepares the quality plans for the project and ensuring its implementation. Reviews and develops the quality inspection and testing procedures to meet or exceed the client expectations. Executes the inspection process of the received supplies/ materials to the projects to ensure their quality meets

the desired standards. Co-ordinates with concerned entities within the project on all technical issues to ensure that the phases meet

the desired quality standards. Reviews the adopted standards in the project to ensure that these standards are updated and meets client

expectations. Co-ordinates with line QA/QC Manager to ensure the proper implementation of plans, systems and procedures. Provides advice and recommendation on continuous improvement related to new and existing processes within

the project. Prepares periodic reports with respect to the section’s activities and achievements.

PROJECT #2 Construction of Haramain High Speed Railway Station Project KAEC, SABER. K.S.A.CLIENT SAUDI RAILWAY ORGANIZATION (SRO)CONSULTANT DAR AL HANDSHAHPROJECT PROFILE This is Haramain High Speed Railway station project with world class finishes covering an area

of 840,000sq ft. Comprising of Mega Steel Structures, Main Building, 2 Major platforms, Helipad, Mosque, 2 Car parks, Fire Station & Staff facility building etc. worth costing 1.75Billion SAR.

Duties and Responsibilities:

Construction of project in conformance with project specification, IFC drawings and approved Shop drawings. Preparing and controlling all construction records and documents.

Curriculum Vitae of Ghulam Mujtaba Page 2

Page 3: Ghulam mujtaba updated cv

Develops and establishes standards and methods for inspection, testing and evaluation. Coordinates with the Engineers representative for every inspection, sampling and testing schedule in accordance

to ITP and technical specification requirements. Prepares necessary documents of proposed materials such as company profile or manufacturer, Brochure, Mill

certificate, delivery receipt and official test results of joint testing and sampling to be submitted to the Engineers for review and approval.

Direct report to QA/QC Manager for every day schedule of work and progress. Carrying out inspection and verifying as per approved ITP’s and checking for correct dimensions, material and

general quality as per checklist, drawings and as per requirements. Checking inspection request (IR) for correctness for gridlines and locations, attachments, of approved drawings,

material approval, survey report etc and clearance from every concerned department before submitting to consultant.

Conducting final inspection with Client Engineers in accordance with specification requirements. Approved IR updating database and rejected IR send back to construction personnel for review and action for

possible repair/rework. Attend weekly and monthly meeting with Engineer regarding quality frequency stipulate on project specification

and process accomplishment. Maintain Quality manual and Quality management system.

b) February 2012 to November 2012

POSITION QA/QC ENGINEEREMPLOYER ALFANAR CONSTRUCTIONPROJECT CONSTRUCTION OF NEW HARAMAIN HIGH SPEED RAILWAY TRACK 380KV S/SCLIENT SAUDI ELECTRICITY COMPANY (SEC)

Duties & Responsibilities:

Working collaboratively with Project engineering & Site management team in preparation and coordinating for Project Quality Plan, Job safety analysis, Inspection and Test Plan (ITP), method statement and other project relevant documents and ensure compliance as per client requirements.

Implementation and monitoring the Quality System as per International Quality standards and project specifications to guarantee to the management as well as to the client.

Identify and develop an alternate source for achieving cost-effective execution of site activities and timely delivery of entire project work, so as to minimize project cost.

Manage subcontractors, and coordinate with client representative. Manage construction and post-construction coordination issues between related parties of the project.

Participation in regular meetings with client management and sub-contractors.

c) May 2011 to January 2012

POSITION PROJECT ENGINEEREMPLOYER SL-RASCH GMBH (SPECIAL AND LIGHT WEIGHT STRUCTURES)PROJECT DEVELOPMENT OF KING ABDUL AZIZ ENDOWMENT PROJECT MAKKAH (DOKAAEP) K.S.ACLIENT BIN LADEN GROUP OF COMPANIES (SBG GROUP SAUDI ARABIA)

Duties & Responsibilities:

Curriculum Vitae of Ghulam Mujtaba Page 3

Page 4: Ghulam mujtaba updated cv

In charge of Materials orders from GERMANY & UAE and shipment of materials to Site DOKAAEP. Ensure smooth progress and completion project within cost, time and quality standards. Supervision and monitoring sub-contractors work, construction progress, variations and punching systems, final

walk down and punch list management. Implementation of the Project HSE requirements at job site. Attending regular technical meetings with client and sub-contractor to monitor regardless for project Turnover. Verifying contractor bills and approving variations. Conducting departmental audits. Review of drawings and technical queries with design department, clarification to the civil contractor if any

things required and follow up the main activities. Quality control of all civil and structural activities, including stage wise inspections up to completion. Preparing job safety analysis, work permits, Inspection and Test Plan (ITP), method statements and QC related

documents according to the Project requirements and specifications. Monitor non-conformance’s reports and follow up with site team to ensure all non-conformance issues are

resolved and closed out and liaise with Project Manager for talking preventive and corrective actions. Documentation and handover of Project dossier to the client. Surveillance and witness of sub-contractor QC

representative performing job as per QMS, performing the job as per method statement, ITP, IFC Drawings and Project Specification.

d) November 2008 to April 2011

POSITION SITE ENGINEEREMPLOYER CONTRACO LTD. JEDDAH K.S.A

June 2010 to April 2011:

PROJECT DYNAMIC REACTIVE COMPENSATION PROJECT IN SEC-COA PART-II 110KV S/S SVC AFIF K.S.ACLIENT SAUDI ELECTRICTY COMPANY (SEC-COA)

August 2009 to May 2010:

PROJECT CONSTRUCTION OF NAMERAH NORTH 380/132KV BSPCLIENT SAUDI ELECTRICTY COMPANY (SEC)

November 2008 to July 2009:

PROJECT POWER SUPPLY TO PUMPING STATIONS AT SHUQAIQ PHASE-II, WTS (132/13.8KV PSA-2&3 S/S)CLIENT SALINE WATER CONVERSATION CORPORATION (SWCC)

Duties & Responsibilities:

Responsible for Supervision, monitoring and quality control of day-to-day site activities. Witness all field and LAB tests. Quality control of all civil engineering Items, including stage wise inspections up

to completion. Coordination with consultants, follow up of NC reports if any closing and modification work. Material submittals getting approvals from approving authorities. Conduct inspection of raw materials, bought out Items and review of Material Test Certificates (MTC) and

specification requirements. Ensure only latest approved documents and drawings are used on site.

Curriculum Vitae of Ghulam Mujtaba Page 4

Page 5: Ghulam mujtaba updated cv

Coordination with independent testing laboratory and site execution team for timely approvals of works from client and consultants. Ensure all inspections are done as per Inspection and Test Plan and that these are documented on pre-defined forms and check sheets.

Interface and coordinate with clients for production and QC matters and coordinate with third party inspection agencies for all related inspection activities.

Preparing final handover documents/project dossier, method statements, inspection and Test Plans (ITP) and other quality documents according to the project requirement and client specification.

e) May 2008 to October 2008

POSITION SITE ENGINEEREMPLOYER MYRA ENGINEERING COMPANY (MEC) KARACHI PAKISTANPROJECT CONSTRUCTION OF LOGISTIC COMMAND MESS BUILDING & NAVAL ADMIN BLOCK KARACHICLIENT PAKISTAN NAVY

Duties & Responsibilities:

Supervision and monitoring all construction activities such as surface preparation, steel rebar’s cutting, bending and fixation, formwork installation, casting concrete structures, curing of concrete structures, waterproofing works, backfilling works, field density test (FDT), painting works, floor finishes (floor marbles, porcelain tiles, epoxy screed, floor paintings etc), wall claddings and wall linings, ceiling works, skirting’s, fire cabinets & fire proofing’s, concrete & glass balustrades, precast stairs, stair case railings & nosing’s, dry partition walls, toilet sanitary wares, doors installation, steel access ladders, external works (manholes & gullies), external road works, plantings, perimeter fence works etc.

Complete all paper work required accurately and ensure that copies are retained and well kept, provide engineering and management support to the Project Manager.

Presenting the contribution to the quantity tracking functions, sending weekly reports to Project management of installed materials, checking of delivered materials and coordinating site activities setting up.

Preparing final project documents/project dossier according to the Project requirements & client specification.

Curriculum Vitae of Ghulam Mujtaba Page 5