Swayam Superstructures Pvt.Ltd.

Page 2: Hse new microsoft power point presentation

Index

• • 1.       Company Profile• 2.       Organisation Chart• 3.       Safety policy• 4.       Quality policy• 5.       Technical Staff Strength• 6.       Plant & Equipment details• 7.       Past experience in related projects (Project Executed in and around Mumbai is

must)• 8.       Current Projects in Hand and their status (On-going projects)• 11.   Manpower Histogram – Month on Month basis• 12.   Detailed Project Schedule for execution – covering complete scope of work• 13.   Safety plan and provision.• 14.   Reference from current on-going projects.•

Page 3: Hse new microsoft power point presentation

EHS Plan for project Execution • Safety Policy of the Contractor • • Safety organization of the Contractor specifying the person accountable for

safety at site. • • Safety organization shall specify the no. of safety manager/ officer and safety

supervisor.• • C.V of the Project Head and the safety team of Contractor to be submitted to the

client for review and approval. • • Plant & Machinery details specifying the make of the machinery/ equipment, age

of machinery with fitness certificate will be provided. • • Details about various processes like safety induction, tool box talk, safety

training, emergency readiness, Safety Committee and incident control shall be covered in the EHS Plan.

Page 4: Hse new microsoft power point presentation

EHS Plan • Operational controls like edge protection, hard barricading, safety nets, Personal

Protective Equipment, Fall Arrestor, work platforms, safety signage, Work permit, training and supervision will be provided by SSPL.

• • Safety inspection and audits process and plan to be mentioned in the EHS Plan. • • In case of Incident, reporting structure and first aid arrangement and

modification process shall be included in the plan.

Page 5: Hse new microsoft power point presentation

Site Set Up

• Project office • Labour camp setup and maintenance• Traffic and Security management • Safety Induction Room • First Aid Facility • Material storage and Lifting area • Equipment & vehicle parking area

Page 6: Hse new microsoft power point presentation

Men and Material access control

• All personnel will have the Project/Site Entry Card.• Safety Induction seal is must on the identity card.• Visitor control will be done through security All vehicles movement will

be recorded. • All entry will be through one gate • Separate pathway for pedestrian

Page 7: Hse new microsoft power point presentation
Page 8: Hse new microsoft power point presentation

Ensure 100% Safety Induction

• Advance intimation shall be provided to Client’s CM Team including EHS department about new joiners in the standard induction request format.

• New workers /staff / visitors shall undergo safety induction training at site before entering Construction zone.

• Safety Induction stickers shall be issued by the contractor after induction

& recorded.

Page 9: Hse new microsoft power point presentation

Ensuring 100% Personal Protective Equipment (PPE)

Page 10: Hse new microsoft power point presentation

Men & Materials Logistics • Verification of Project Entry Card & attendance at site • All trailers/ goods carrying material/ equipment will be escorted. • All trailers/ goods vehicle will be under the escort supervision from entry

to exit. • Road safety rules shall be adhered by the Contractor vehicles while at

site

Page 11: Hse new microsoft power point presentation

Communication on site

• Radio Frequency sets will be made available to Section In charges • Emergency siren • Public address System/ Megaphone for any announcement / TBT

• Worker restricted for usage of mobile phone during working hrs.

Page 12: Hse new microsoft power point presentation

Safety requirements while Excavation or working in Excavated pits

• Inspection of site location • Risk analysis of Excavated area • Checking of underground utilities like

HT/ LT cable, gas pipeline, sewage lines, etc.

• Cave-in protection • Approach to excavated area • Hard barricading of Excavated area • Emergency equipment like motorised

pump for removal of collected water • Adequate safety signage • Follow Work permit process

Page 13: Hse new microsoft power point presentation

Fall Protection Provision

• All the opening /cut out, lift duct shall be barricaded with 40 NB pipe

• Peripheral barricading for each floor shall be provided with hand rails.

• Vertical protection shall be provided to floor cut out / any service duct

• Lift duct shall be barricaded horizontally & vertically

• Peripheral barricading with toe guard shall be provided considering safe distance of 1 meter.

• Workmen engaged in height work shall wear Personal Fall Arrest System (Full Body

Safety harness anchored to anchorage point)

Page 14: Hse new microsoft power point presentation

Safety screen and safety net Provision

• Horizontal safety net of double layer shall be provided at every 3 floors to prevent fall of material & fall of Person.

• Intermediate safety net shall also be provided

• Conventional Shuttering safety: Conventional Formwork with safety working platform and netting system shall be implemented after seeking approval from Client Engineers/CM Team.

• Horizontal net for lift core area to prevent fall of material / person

Page 15: Hse new microsoft power point presentation

Fall Protection-For conventional work

Page 16: Hse new microsoft power point presentation

Fall Protection - Catch Nets

Page 17: Hse new microsoft power point presentation

Fall Protection – Lift Shaft

Page 18: Hse new microsoft power point presentation

Garbage Chute provision for debris removal

Page 19: Hse new microsoft power point presentation

Plant and Machineries Erection & Dismantling

• Risk assessment & Method Statement for erection and dismantling of Tower crane to be submitted before erection.

• All the erection activity to be carried out by skilled workers & staff

• All materials to be lifted through lifting area

• Provision of Personal Fall Arrest System

• Scaffolding to be used for erection • Work permit Process to be

implemented • Area needs to be barricaded

Page 20: Hse new microsoft power point presentation

Tower Crane (SSPL scope)• Tower Crane inspection & approval from SSPL (Contractor’s) end to be

carried out by Client before mobilization at site.• Method Statement for erection & dismantling to be submitted by SSPL

(Contractor) for seeking approval before carrying out the work. • Operator & rigger proficiency check will be done by Client before

allowing them for work. • Walky Talky mandatory for operator and Rigger/ Signalman. Safety

features mandatory • Self adjusting hook block.• Fail safe break on hoist.• Over Hoist Warning system • Wind speed anemometer • Aviation light • Independent earth pit

Page 21: Hse new microsoft power point presentation

Plant and Machineries Inspection and operation

• All the lifting equipment will be subjected to third party certification

• Equipment shall undergo preventive maintenance & report shall be submitted

• Internal Inspection carried out for all equipment periodically Deployment of trained & competent operators only

• Approval of Equipment/ machinery operators shall be taken from Client/Engineer in charge (EHS) Dept. before deployment

Page 22: Hse new microsoft power point presentation

Third party Inspection by Expert

• Tower crane • Mobile crane• All the Lifting tools & tackles

(Chain Sling, Wire rope sling, Web belt, D shackles etc.)

• Fitness report of all Equipment/ Vehicles deployed by SSPL (contractor)

• Client approved agency for certification/caliberation.

• TPI reports shall be submitted to Client/Engineer’s (EHS) Dept. before driving the above equipment in use.

Page 23: Hse new microsoft power point presentation

Temporary Electrical supply

• SSPL (Contractor) will submit the license and competency certificate of electrical engineer, supervisor & electrician before deploying at work

• Electrical Work shall be carried by only skilled Electricians

• All the Distribution Board will be as per Indian Electricity Act standard.

• ELCB/ RCCB and earth shall be provided for all electrical installation

• Tripping test of ELCB to be carried out & register to be maintained

• Emergency light in staircase/ access/ near lift platform shall be provided

• Fire extinguishers shall be provided and maintained at all levels of building

Page 24: Hse new microsoft power point presentation

Material shifting with Temporary loading platform

• Loading platform made available if required for material shifting • Platform shall be installed, after design approval only • Edge Protection & safety harness shall be provided • Safe Working Load and last tested by TPI to be displayed.

Page 25: Hse new microsoft power point presentation

Scaffolding

• Scaffolding inspection before usage & tagging system

• Adequate type of scaffolding to be used for different activities (If required)

• Use of fall arrestor and Personal Fall arrest system

• Scaffoldings Erection/ Dismantling shall be carried out by trained Scaffolder

Page 26: Hse new microsoft power point presentation

Portable Ladder

• SSPL (Contractor) shall be responsible for ensuring • No portable single ladder shall be over 6 meters in length. • The width between the side rails shall not be less than 45 cm. • When a ladder is used, a person shall be engaged only for the purpose

of holding the ladder at that point of time. • All the ladders must have hand rails. Use only aluminium ladder. Wooden ladder not allowed.

Page 27: Hse new microsoft power point presentation

Safety Training & Safety Committee Meeting• Training of workmen through a)

Induction b) Tool Box Talk C) PEP Talk

• Behavior based safety training to all

• Training calendar will be prepared • Training given to Field Engineers &

staff on safety topics• Competency Development

Training of Safety staff • Formation of safety Committee &

monthly meeting • Records of all above shall be

submitted to Employer’s EHS Dept.

Page 28: Hse new microsoft power point presentation

Motivational Activities • Best safety workers for the month • Best safety Staff for the month • Annual Safety Day Celebration • Aids awareness • Tetanus drive • National safety week

Page 29: Hse new microsoft power point presentation

Fire Prevention

• Fire extinguishers shall be provided at designated places and properly maintained

• Subjected to regular inspection by safety personnel

• Location map will be prepared & displayed

• Fire demo & training for usage during emergency

Page 30: Hse new microsoft power point presentation

Emergency Response Plan: (ERP)

• ERP shall be prepared based on site condition & risk • Every one will undergo ERP training • Mock drill to be conducted periodically • Emergency Response Team in place • All the emergency Contact Nos. shall be displayed • Tie-up with nearby Hospital

Page 31: Hse new microsoft power point presentation

Safety Posters & Signages

• Safety Posters installed at prominent location at site

• Safety Signage at identified places shall be provided

Page 32: Hse new microsoft power point presentation

Housekeeping

• Dedicated supervision for Housekeeping

• Collection dust bin at designated places

• Daily removal of debris/ waste regularly outside the site

• Housekeeping plan shall be prepared

• Housekeeping audit weekly by safety personnel & will be reviewed at weekly site meeting

• Mass Housekeeping drive shall be conducted

Page 33: Hse new microsoft power point presentation

Safety Audits & Inspections

• Regular & periodical audits by Corporate EHS dept.• Electrical Inspection • Labor Camp Inspection • House keeping audit • PPE Inspection • Fire Extinguisher inspection • P& M Equipment's inspection • Stores audit

Page 34: Hse new microsoft power point presentation

Requirements regarding Workers Accommodation Camp

• Client’ s Scope • • Land for Labour camp duly barricaded

will be allotted by Client. • • Water connection (Main point with

meter) will be provided. • Electricity connection main point with ELCB will be provided. • RO Plant will be provided by Lodha of 500 KL capacity with one outlet point.

• • Security for the overall camp will be

provided at the entrance of the camp.

Page 35: Hse new microsoft power point presentation

• SSPL (Contractor’s) Scope• Labor Hutment plan including kitchen, toilet, bath area, STP, soak pit shall

be prepared and get it approved from Client. • Hutment material shall be arranged by SSPL (Contractor). • Hutment erection and commissioning shall be done under SSPL (Contractor) direct supervision. • SSPL (Contractor) will provide Camp boss, Security personnel, electrician and plumber for upkeep and security. • Internal partition shall be erected by SSPL (contractor) within the camp. • Water (Drinking) points- Adequate points shall be planned for your team • Provision of adequate Electrical points in hutment, toilet, bath area and drinking water area and pathway lighting shall be responsibility of SSPL (Contractor).

Page 36: Hse new microsoft power point presentation

• SSPL Contractor’s Scope (Continued)• PCC floor shall be provided in all rooms and pathway. • Sufficient brick work

(Bund wall) shall be done to avoid water entering into the room during monsoon. • Proper slope to be provided to the roof of hutment and Tarpaulin shall be provided to prevent leakage during monsoon. • Distribution boards with MCB and ELCB to be provided to safeguard the electrical cable in case of usage of water heater. • Pest control from mosquitoes, rodents and snakes shall be SSPL (Contractor) scope. Frequency shall be discussed with Client. • Safety Induction facility with 20 person capacity with T.V and DVD for screening induction films. • First Aid room facility with trained First Aider and first aid kit shall be provided • Safety signage at conspicuous location shall be provided. • Food waste collection bins shall be provided and daily collection.

Page 37: Hse new microsoft power point presentation

Health & Hygiene of labours

• Medical Examination of workmen before getting into job at site.

• Fogging & pest control for Site & labour camp

• Labour camp hygiene condition • MBBS Doctor Visit once a week • First Aid Room with trained First

aider • Ambulance tied up with nearby

hospital

Page 38: Hse new microsoft power point presentation

Worker Welfare Facility

• Dust Bin at Labour Camp • Staff Canteen

• Doctor Visit

Page 39: Hse new microsoft power point presentation

• Thank you• Swayam Superstructures Pvt.Ltd.