REPORT UTTARAKHAND RENEWABLE ENERGY DEVELOPMENT AGENCY (UREDA) September 2009

Imp e cactuk

Embed Size (px)

Citation preview

Page 1: Imp e cactuk

REPORT

UTTARAKHAND RENEWABLE ENERGY DEVELOPMENT AGENCY

(UREDA)

September 2009

Page 2: Imp e cactuk

Impact of EC Act. in Uttarakhand State & Initiative taken by the Govt., Energy

Utilities, SDA, Designated Consumer and Notified Building Consumers

Project Report under VI Activity of Agreement No. 01/UREDA/VCTAS/2008-09

Prepared By

Association Of Energy Conservation & Environment Protection

September 2009

Page 3: Imp e cactuk

INDEX

Sr. No. Particulars Page No.

1 ACKNOWLEDGMENT 01

2 ENERGY STATUS IN INDIA 02

3 ENERGY CONSERVATION ACT 2001 & ITS INSTITUTIONALIZATION

04

4 UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING RENEWABLE ENERGY SOURCES

06

5 UTTARAKHAND ELECTRICITY SYSTEM CHARACTERISTICS 18

6 UTTARAKHAND POWER CORPORATION LTD. 19

7 UTTARAKHAND BIO-FUEL BOARD (UBFB) 26

8 ACTIVITIES BEING CARRIED OUT BY UREDA UNDER ENERGY CONSERVATION PROGRAMMES

27

9 DEMO PROJECT BEING CARRIED OUT IN UTTARAKHAND 28

10 EVENTS ORGANIZED BY UREDA FOR PROMOTION & AWARENESS OF ENERGY CONSERVATION

28

11 PUBLICITY & AWARENESS ACTIVITIES 29

12 UREDA ON THE TRACK FOR IMPLEMENTATION OF ECBC 36

13 LIST OF BEE CERTIFIED ENERGY AUDITOR & ENERGY MANAGER IN UTTARAKHAND

37

14 STANDARDS AND LABELING PROGRAMME 37

15 DEMAND SIDE MANAGEMENT (DSM) 38

16 INITIATIVE TAKEN BY GOVERNMENT DEPARTMENTS 39

17 ENERGY AUDIT CONDUCTED BY UREDA IN BUILDINGS OF UTTARAKHAND

49

18 LIST OF PROPOSED DESIGNATED ENERGY CONSUMER OF COMMERCIAL BUILDINGS IN UTTARAKHAND

51

19 REG. MEETING, SEMINARS, TRAINING & OTHER PROGRAMS ORGANIZED BY UREDA

52

20 NEWSPAPER ADVERTISMENTS 59

21 VOICE OF UTTARAKHAND 60

22 ACTIVITIES OF UREDA THROUGH MEDIA EYE 62

23 CONCLUSION 70

Page 4: Imp e cactuk

1

ACKNOWLEDGEMENT

This project is assigned by UREDA for analysis of the Impacts of EC Act. 2001 in Uttarakhand on

Energy Conservation Policy of Central Govt. and initiatives taken by the State Govt., Energy

Utilities, SDA, Designated Consumer and Notified Building Consumers. For completetion of this

report we wish to convey our heart – felt thanks to UPCL , PTCUL ,CII – Uttarakhand , Association

of Industry – Uttarakhand , Hotel Association – Uttarakhand.

I would like to thank my supporting Team Members Mr. R. K. Aggarwal & Mr. S K Sabarwal ,

Ms.Deepali Jagdev, and Mr. Naresh Tariyal for giving final touches to this Project report.

Last but not the least our thanks are to Mr. A. K. Tyagi (Chief Project Officer), Mr. A. J. Singh

(Dy. Chief. Project Officer) and other UREDA officials for there belief and generous support to our

Organization.

Association Of Energy Conservation

And

Environment Protection

Page 5: Imp e cactuk

2

ENERGY STATUS IN INDIA

nergy means any form of energy derived from fossil fuels, nuclear substances or materials,

Hydro-electricity and includes electrical energy or electricity generated from renewable sources

of energy or biomass connected to the grid.

About 20% of worlds energy is generated from coal and about 60% of worlds energy is generated

from oil and natural gas. Because of extensive use of fossil fuel, such as coal, oil and natural gas, as

primary source of energy today, the harmful emissions of GHG (Green House Gasses) such as

Carbon Dioxide increases the GHG level in the atmosphere which traps the extra heat reflected from

the earth resulting rise in temperature. Carbon dioxide and some other gases in the atmosphere act

like glass in a green house. They let Sun’s rays through, but trap some of the heat, which would

otherwise be reflected back into space. This Green house effect always existed.

Scientists believes that global warming will cause the average World temperature rise by one Degree

Celsius by the year 2020 and four Degree Celsius by the end of 21st century.

Thus energy conservation has emerged as one of the major issues in recent years. Energy

requirement in our country is increasing in a very rapid rate. India’s demand for commercial energy

in 2020 is expected to increase by 250% from today’s level. Coal accounts for about 50% of primary

commercial energy today and is further increase its share. Despite its low per capita CO2 emission of

less than 1 ton, India contributed over 4% of world total CO2 emission in 2000.

While efforts are being made to improve availability of various energy sources, there is still a

continuing gap between demand and supply of energy. Conservation and efficient utilization of

energy resources play a vital role in narrowing the gap between demand and supply of energy.

Improving energy efficiency is probably the most profitable thing that can be done in the short term.

Energy conservation is the quickest, cheapest and most practical method of overcoming energy

shortage. It is found that there is major scope of energy conservation in electrical distribution system

and in consumer’s installation.

While using energy, a considerable amount of energy is wasted. It is estimated that there exists a

potential of saving of about 30% energy used by us in daily life. In India commercial energy demand

is growing high at annual rate over 6%. It is estimated that by 2020 the total requirement of energy

will be more than 250% of today’s need. But the supply of energy is not growing at par with

demand.

E

Page 6: Imp e cactuk

3

By reducing consumption of energy through energy conservation also helps us to save precious

fossil fuel like coal, gas, oil which are used by the generating companies to generate electricity. Also

reduction of use of fossil fuel leads to reduction of emission of harmful gasses into the atmosphere.

The prime target sectors are the Domestic & Commercial, Industrial, Agriculture and large

buildings, which are the main consumers of energy. By adopting proper energy efficiency in these

areas, considerable energy conservation may be achieved.

Many energy efficient products, once costly and exotic, are now inexpensive and commonplace

ones. A good quality Compact Fluorescent Lamp costs more than Rs.500 a decade ago now costs

around Rs.120. They use 75 to 80 percent less energy than conventional incandescent lamps and also

lasts more than 10 times longer. As a conventional lamp produces a considerable amount of heat,

most of the energy consumed by a bulb to produce light is wasted as heat. As such, CFL lamps are

more energy efficient. as they do not produce heat and consume about 20% of energy consumed by

an incandescent lamp, while producing same illumination.

In India, general people use electricity for illumination purpose mainly in their houses in addition to

running household appliances. So, designing the houses skillfully to be illuminated primarily by

available daylight will result in considerable saving of electricity, which in turn will save money.

Designing a building with maximum utilization of daylight and use of energy efficient lamps and

appliances will certainly reduce the cost of energy use, which in turn also will make a significant

contribution towards ecology balance.

Page 7: Imp e cactuk

4

ENERGY CONSERVATION ACT 2001 AND IT’S INSTITUTIONALIZATION

Background

Energy conservation has emerged as one of the central issue in national economic agenda in recent

years. A potential of 20-25 percent reduction of energy consumption from the present level is

possible in the different sectors, without forgoing any of the end-use benefits of energy. The

individual and the society stand to gain from conservation and improved energy efficiency, both in

terms of money saved by reducing energy costs in the short run, as well as reducing investment

needs for energy production in the long run. Energy conservation also reduces or avoids the

tremendous social and environmental costs resulting from in energy generation and wasteful

consumption, such as emissions of carbon dioxide (CO2) and other pollutants and depletion of scarce

resources and damage to the environment. Despite the relatively low per capita energy use in India,

there is a need to increase energy availability to meet basic needs and developmental goals.

However, the high level of energy intensity in some of the sectors is also a matter of concern. Hence,

conservation has to go hand in hand with generation efficiency. A systematic understanding of

energy consumption patterns is needed in each sector, and a strategy has to be evolved to supply

energy efficiently and curtail wasteful consumption.

The relevance of legislation to improve end –use energy efficiency in all sectors of the economy was

realized as an outcome of a national debate on the need for strengthening the energy conservation

movement. The extent of importance attached by the central government to energy conservation is

reflected in promulgation of a separate Act ‘Energy Conservation Act 2001’, which was specifically

enacted to promote energy conservation. The preamble says the EC Act is intended to ‘promote

efficient and environmentally benign policies’ related to energy use.

The Energy Conservation Act 2001 is primarily aimed at the intensive consumers of energy called

Designated Consumers. The Energy Conservation Act has created the Bureau of Energy Efficiency

(BEE) under the Ministry of Power with the primary objective of reducing energy intensity of the

Indian Economy.

The basic objectives of the Act are:

� Provide a policy framework and direction to the national energy conservation activities.

� Coordinate policies and programs on efficient use of energy with the stakeholders.

� Establish systems and procedures to verify, measure and monitor EE improvements.

� Leverage multilateral, bilateral and private sector support to implement the EC Act.

� Demonstrate EE delivery systems through public-private partnerships.

The Energy Conservation Act lays down clear action plans and envisages the establishment of a

specific organization to convert these plans into reality through various regulatory and promotional

interventions. The thrust areas identified for the implementation of the Energy Conservation Act are:

01. Indian Industry Program for Energy Conservation

02. Demand Side Management

03. Standards and Labeling Program for notified equipment and appliances

Page 8: Imp e cactuk

5

04. Energy efficiency in Buildings and Establishments

05. Energy Conservation Building Codes

06. Professional Certification and Accreditation

07. Manuals and Codes

08. Energy Efficiency Policy Research Program

09. School Education

10. Delivery Mechanisms for Energy Efficiency Services

BEE has a mission to institutionalize energy efficiency, set up a delivery mechanism for energy

efficiency services and to provide leadership to implement a nation-wide energy efficiency program.

The EC Act provides for regulatory functions for market development and information management,

and other enabling functions to achieve its objectives.

The BEE has powers to direct the designated consumers to abide by energy consumption norms and

to get their energy consumption audited are met by specified industry or building complexes. The

power supply utilities are also included in the list of 15 categories of Designated Consumers. The

major regulatory functions of BEE include: Performance standards and labeling; Introduction of

energy conservation building codes; and Activities focused on designated consumers. The energy efficiency market development functions of BEE include sponsoring research and

implementation of demonstration projects; development of performance contracts and promotion of

energy service companies (ESCOs), measurement and verification (M&V) protocols; technology adoption and advancement; training and educational programs and innovative financing of energy

efficiency projects.

BEE also has a critical information management function that includes partnering industry

associations and entering into voluntary agreements on sharing data and information; networking

with ESCOs and energy management consulting organizations.

BEE would function as an information-clearing house on the rational use of energy and

commissioning and preparation of publications and promotional kits.

Ministry of Power, under Section 61 of the Electricity Act, has set up electricity regulatory

commissions the mandate to regulate electricity tariff and lays down the guiding factors to be

considered while determining tariff. Section 61 C requires regulatory commissions to set tariff by

considering “ the factors which would encourage competition, efficiency, economical use of

resources, good performance and optimum investments” Apart from such a strong legal approach,

energy conservation has found priority in many other related initiatives of the MoP. For example, the

MoP has insisted on DSM and energy conservation measures in the MoUs signed with several state

governments / utilities under its financial assistance program (called APDRP).

During the past 3 years, BEE is reported to have initiated actions on the thrust areas and moved

forward, in establishing institutional mechanisms and infrastructural facilities under the mandate of

the Energy Conservation Act and took steps to involve industries, equipment manufacturers,

financial institutions and other stakeholders for implementing the provisions of Energy Conservation

Act.

Page 9: Imp e cactuk

6

UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING

RENEWABLE ENERGY SOURCES

(Annexure of G.O. No.263/I (2)/2008-04 (8)-96/2001, dated 29-1-2008)

1. Preamble

Uttarakhand is richly endowed with natural renewable resources for generating electricity. Most

of this could be harnessed through environmentally clean Medium & Large Hydroelectric Projects (i.e.

projects with capacity in excess of 25 MW); it is estimated that a capacity of more than 20,000

MW is yet to be tapped through these sources.

In addition, the State has significant Renewable Energy (RE) Sources that includes sites for developing

Micro (up to 100 KW), Mini (100KW-5 MW) & Small (5-25 MW) Hydro power projects as well as

sources for generating electricity through Biomass/Agro residue, Wind power, Solar energy,

Cogeneration etc. This policy aims at expeditiously harnessing these sources of energy that are

non-polluting and are useful for electrification of isolated and remote habitations in Uttarakhand. It is

felt that more than 1,000 MW electrical power could be tapped through these sources before 2020.

2. Objective

To create conditions conducive to Private Sector/Community Participation in power projects

based on RE Sources in the State. In particular:

2.1 To harness the environment friendly RE resources and enhance their contribution to the socio-

economic development of the State.

2.2 To meet and supplement minimum rural energy needs through sustainable RE projects.

2.3 To provide decentralized energy supply to agriculture, industry, commercial and household sector.

2.4 To improve the quality of grid power through such projects, as a consequence of tail-end

generation and feeding.

2.5 To enhance the use of energy sources that assist in mitigating environmental pollution.

2.6 To support efforts for developing, demonstrating and commercializing new and emerging

technologies in the RE sector and, to this end, help establish linkages with national and

international institutions for active collaboration.

Page 10: Imp e cactuk

7

2.7 To create conditions conducive to the involvement of private investors in RE projects.

2.8 To create public awareness and involve users/local community along with their capacity

building in establishing, operating and managing RE projects.

2.9 To create direct and indirect employment opportunities in the State.

3. Measures To Be Adopted

In order to fulfill the above, the following measures are proposed to be adopted:

Power generation through Hydro projects,

Co-generation in industries such as Sugar, Paper, Fertilizer and Chemical etc.,

Power generation from Biomass / Agricultural residue,

Power generation from urban, municipal and industrial waste,

Power generation from solar energy,

Power generation from wind energy,

Power generation from geothermal energy,

Energy conservation in domestic, agriculture, industrial, commercial and transport sectors

through induction of administrative/statutory/ legislative/ technical solutions and

imposing stringent conditions for all categories of consumers.

4. Potential Proposed To Be Harnessed

Given the geographical conditions of the State of Uttarakhand, and availability of various sources of

energy, the State proposes to harness the resources with active involvement of private/public sector/

community participation in the following manner :–

4.1 Hydroelectric Power:

By virtue of its topographic location,

the State has a number of perennial

streams where water is available

throughout the year. The untapped

potential that could be harnessed

before 2020 through

Micro/Mini/Small Hydro projects is

about 600 MW. The State

Government is committed to

exploiting this potential.

Page 11: Imp e cactuk

8

4.2 Co-generation:

Uttarakhand has an established industrial base

which is expanding. The Sugar, paper, fertilizer,

chemical, textile and other industries have

an estimated potential of about 220 MW that

could be tapped by co-generation. This would

not only augment the State’ s grid but would

also help captive generation. This potential

would also be exploited by the year 2020.

4.3 Biomass/Agro residue and waste :

It is estimated that about 20 million

Metric Tons of agro residues and

agro industrial/ processing waste is

produced annually in Uttarakhand.

It holds promising potential for

generating decentralized power of

about 300 MW. The State

Government would support and

facilitate harnessing this

potential by 2020.

4.4 Urban, Municipal and Industrial Liquid/ Solid Waste :

At present about 1000 Metric Tons of

Municipal, Urban and Industrial solid/

liquid waste is being produced every day

in the State. Introducing scientific

processing and treatment of this waste

would lead to power generation along

with abatement of environmental

pollution. Initially a small number of such

projects would be supported.

Page 12: Imp e cactuk

9

4.5 Solar Energy :

The State is endowed

with vast potential of

solar energy and the

Government of

Uttarakhand (GOU) is

keen to tap this

resource; the State would

support efforts for setting

up Solar based power

projects.

4.6 Wind Power :

Sufficient untapped wind power potential is available in the

State. There is immediate necessity for wind mapping in

the State to assess and exploit the available potential. The

State would support such programmes.

4.7 Geothermal Power :

Sufficient untapped geothermal

power potential is available in the

State. There is necessity for

assessment of geothermal energy

in the State to exploit the available

potential. The State would

support programmes for

exploiting the available potential

optimally.

Page 13: Imp e cactuk

10

4.8 Energy conservation :

Measures related to conservation of energy in

domestic, commercial, agriculture

and industrial sector could lead to 20%

savings in energy consumption.

The State Government is committed

to introducing effective energy

conservation measures in all sectors of

economy. Energy auditing would be made

mandatory in the State especially for

industrial units where the load

exceeds 25 kW. Appropriate mechanisms

would be evolved for effective

implementation of energy conservation

measures.

5. Incentives

5.1 Sale of electricity: O n the electricity generated by the RE projects, UPCL will have the first

right of purchase; such purchases may be made in whole or part as per the requirement of

UPCL. The price of electricity to be purchased by the UPCL will be determined by the UERC;

the price so determined will be announced in advance and will be uniformly applicable to all

producers. The GO U will provide guarantee for the payments to be made by the UPCL for such

purchases.

5.2 Wheeling of electricity: UPCL/PTCUL will undertake to transmit through its grid the power

generated and make it available to the producer for captive use or third party sale within/outside

the State for which wheeling charges uniformly applicable to all producers would be announced in

advance.

5.3 Banking: UPCL would extend the facility of Banking to the developers at mutually agreed terms.

5.4 For evacuating energy from the generation site, requisite network of transmission/ distribution lines

would be provided by UPCL/PTCUL.

5.5 In case of power generation from Municipal Solid Waste, if Government land (belonging to Urban

Local Bodies/Panchayats) is available, the required land for setting up RE projects would be

provided on nominal lease rent of one rupee per square meter per year for a period of 33 years

subject to further renewal on mutually agreed terms and conditions.

Page 14: Imp e cactuk

11

6. Single Window Clearance For Re Projects:

Setting up of RE projects involves sanctions/clearances from a number of Government

Agencies/Departments. The State Government would provide requisite clearances in a time bound

manner through a single window mechanism. For this purpose a high level empowered committee

(composition at Appendix) is constituted to accord necessary approvals/clearence.

7. Classification Of Projects:

Broadly, RE projects would be classified as

( A ) Hydro Projects (up to 25 MW)

(B) Other RE Projects i.e. projects involving generation of power from co-generation,

Biomass/Agro- residue, urban, municipal and industrial liquid/solid waste, wind, solar energy

and including projects

for energy conservation.

7(A) HYDRO PROJECTS :

(I) Based on the generating capacity, Projects will be grouped into the following three categories: a) Micro Projects with capacity upto 100 kW, b) Mini Projects with capacity above 100 kW and upto 5 MW, c) Small Projects with capacity above 5 MW and upto 25 MW.

(II) In the basis of the mode for identification, projects may be grouped into the following two

categories:

a) Self Identified Projects: developers may identify projects, prepare the D PR and ask for

allotment;

b) State Identified Projects: The State or State Sponsored Agencies may identify projects of any

size, prepare the D PR and allot it in the manner prescribed below :–

Allotment of Hydro Projects: Self Identified Projects: Eligibility criteria

For Micro projects

(i) Individuals who are domiciles of Uttarakhand, (ii) Gram Panchayats of Uttarakhand in the vicinity of the site,

(iii) Societies of Uttarakhand registered under the Society Registration Act, 1860/UP

Page 15: Imp e cactuk

12

Cooperative Society Act 1965 would be eligible for allotment.

For Mini projects

(i) Individuals who are domiciles of Uttarakhand,

(ii) Gram Panchayats of Uttarakhand in the vicinity of the site,

(iii) Societies of Uttarakhand registered under the Society Registration Act, 1860/UP

Cooperative Society Act 1965,

(iv) Firms registered under the Company Act 1956 and having their manufacturing units

located in Uttarakhand would be given preference for allotment of project.

For Small Projects

These would be open to all; there would be no reservations. For this premium will be decided

later.

Evaluation criteria

For evaluating suitability of a prospective developer, the following would be considered :–

a) Technical capability including past experience in developing, constructing or operating Energy

Projects – this aspect would be evaluated based on a maximum of 60 marks;

b) Financial capability, including the capacity to invest in the equity of the project and the ability

to arrange for institutional finance. The minimum financial capability (Solvency Certificate to

be provided) would be Rs.10.00 Lakhs and for Micro projects and Rs.50.00 Lakhs for Mini

projects. Financial capability would be evaluated based on a maximum of 40 marks.

Payments to be made:

All payments would be made in the form of a Bank draft of any nationalized Bank.

Application fee (Non-refundable): Rs.5000/-

Processing fee (Non-refundable): At the time of signing the development Agreement

For Micro projects: Rs. 10,000/-.

For Mini projects : Rs. 25,000/-.

For Small projects: Rs. 50,000/-

Security payment: At the time of signing the Implementation Agreement

For Micro projects:: Rs.20,000/-.

Page 16: Imp e cactuk

13

For Mini projects: Rs.50,000/-.

For Small projects: Rs. 1,00,000/-

State Identified Projects:

Small Hydro projects would be allotted on the basis of open competitive bidding (without any

reservation).

Eligibility and evaluation criteria;

Eligibility and Evaluation parameters shall be provided in the Request For qualification

(RFQ)/Request For Proposal (RFP)/ bidding documents.

Allotment Procedure:

The identified projects would be advertised in order to seek bids. Selection of developers would

follow a two-stage process.

i Prequalification: Firstly, the applicants would be evaluated on the basis of pre-qualification

criteria laid down in the RFQ document which will be made available on payment of a

prescribed fee. Broadly, prequalification criteria would be based on balance sheet, annual

report, technical and financial capacity etc. After evaluations, a short list of successful

applicants would be prepared.

ii Financial bid: Applicants short-listed on the basis of prequalification criteria would be

invited to submit their financial bids based on premium payable to the Government of

Uttarakhand. For this purpose the following thresh-hold premium is prescribed (bids

quoting premium below the thresh hold would be rejected out rightly) :–

Above 2 MW & upto 5MW: Rs. 1,00,000/- per MW

Above 5MW & Up to 25 MW: Rs. 5,00,000/- per MW

iii A project will be allotted to the short-listed bidder who has offered the highest bid. The

successful bidder shall be required to deposit the premium and other amount due within the

time specified in the bid document.

iv Complete transparency in allotment of the projects shall be ensured. Comprehensive RFQ

/RFP/ bidding documents would be prescribed for inviting bids clearly enumerating technical

and financial parameters.

7(B) OTHER RE PROJECTS:

Other RE Projects would be kept open for all categories of developers and these would be

Page 17: Imp e cactuk

14

allotted on self identification basis or, wherever possible, on tariff based bidding.

The procedure for tariff based bidding would be prescribed separately. The Self Identified

Projects would be allotted on the basis of the following:-

Evaluation Criteria:

For evaluating suitability of a prospective developer of a Self Identified Projects, the following would

be considered :–

a) Technical capability including past experience in developing, constructing or operating

Energy

Projects – this aspect would be evaluated based on a maximum of 60 marks;

b) Financial capability, including the capacity to invest in the equity of the project and the ability

to arrange for institutional finance. Financial capability would be evaluated based on a

maximum of

40 marks.

Payments to be made:

All payments would be made in the form of a Bank draft of any nationalized Bank.

Application fee (Non-refundable): Rs.5000/-

Processing fee (Non-refundable): At the time of signing the development Agreement

For projects upto 1MW: Rs.10,000/-.

For projects more than 1MW : Rs.25,000/-.

Security payment: At the time of signing the Implementation Agreement

For projects upto 1MW: Rs.20,000/-.

For projects more than 1MW: Rs.50,000/-.

8. Benefits Under Clean Development Mechanism (CDM)

Projects covered under this policy may not involve cheapest form of generating energy. However,

keeping their environment friendly nature, the State would encourage projects to obtain the

benefits available under the Clean Development Mechanism (CDM).

Page 18: Imp e cactuk

15

9. Miscellaneous

9.1 More than three Projects in each category enumerated in paragraphs 4.1 to 4.8 will be allotted to

a developer.

9.2 Industrial units located in Uttarakhand and willing to participate in the open competitive bid

for the purpose of establishing RE projects for their captive use, would be given preference by

accepting their bids provided these are not less than 80% of the highest bid.

9.3 The Government of Uttarakhand reserves its rights to allot a project to a State owned enterprise.

9.4 If a feasible Micro/Mini Hydro project remains un-allotted on the basis of the procedure

prescribed in this Policy, the same would be allotted to any developer through open competitive

bidding, the procedure for which would be laid down separately.

9.5 In the event a developer fails to achieve the various stages of completion of the allotted project as

per the prescribed time schedule without valid reasons, the premium deposited shall be forfeited and

the allotment would be cancelled.

9.6 Projects allotted before the date of publication of this Policy in the official Gazette shall continue

to be governed by the Policy under which they were allotted; these would not be eligible for

incentives under this Policy.

9.7 In case of augmentation of capacity of Self Identified Projects due to any reason, the developer would

be required to pay additional premium of Rs.1 Lakh per MW or fraction thereof for enhancement

upto 5 MW and Rs.5 Lakh per MW or fraction thereof in case of enhancement beyond 5 MW

along with requisite amount to take into effect the inflation from the date the premium was paid. For

State Identified Projects allotted on the basis of open competitive bidding, the extra premium to

be paid would be calculated on the basis of a formulation to be specified separately.

9.8 In case any developer, for any reason (before a project is commissioned), sells his project to some

other developer, the developer selling the project shall be required to deposit an additional amount

equal to the bid premium.

9.9 Projects would be offered for a period of 40 years from the date of award at the end of which they

shall revert to the GOU or extended further on mutually agreed terms.

Page 19: Imp e cactuk

16

9.10 Royalty :

(i) In Micro, Mini and other RE projects governed by this policy, no royalty payment would

be charged.

(ii) In Small Hydro projects governed by this policy, royalty payment for the first 15 years of

operation would be exempted. From 16th year of operation, a royalty 18% of energy

generated would be charged.

10. Amendments/Re laxat ion/In te rp re ta t ion Of Provisions Of The

Policies

GOU shall have all powers to amend/ relax/ interpret provisions under the policy.

1 1. Applicabil i ty

This Policy would become effective from the date of its notification in the official Gazette of

GOU.

Page 20: Imp e cactuk

17

Appendix

CONSTITUTION OF EMPOWERED COMMITTEE

Composition of Empowered Committee:

The Empowered Committee of Administrative Secretaries for according approvals/

clearances is constituted as under:

1. Chief Secretary, Government of Uttarakhand –Chairman

2.

Additional Chief Secretary, GOU

–Vice Chairman

3.

Principal Secretary/ Secretary, Dept. of Energy, GOU

–Member

4.

Principal Secretary/ Secretary, Dept. of Finance, GOU

–Member

5.

Principal Secretary/ Secretary, Dept. of Irrigation, GOU

–Member

6.

Principal Secretary/ Secretary, Dept. of Forest, GOU

–Member

7.

Principal Secretary/ Secretary, Dept. of Industry, GOU

–Member

8.

CMD/MD, Uttarakhand Power Corporation Limited.

–Member

9.

CMD/MD, Uttarakhand Jal Vidhyut Nigam Limited.

– Member

10.

CMD/MD, PTCUL

–Member

11.

Vice President, UIPC

– Member

12.

Director, UREDA

– Convener

The Committee may co-opt other Secretaries/State Government officials and experts as and when required.

Page 21: Imp e cactuk

18

UTTARAKHAND ELECTRICITY SYSTEM CHARACTERISTICS INTRODUCTION

Power Transmission Corporation of Uttarakhand Limited (PTCUL) is a Govt. of Uttarakhand

Enterprise and a Govt. Company as defined under section 617 of the companies Act, 1956. PTCUL

was incorporated under the Companies Act, 1956 on 27th May 2004 with the basic objective of

acquire establish construct and operate extra high voltage, high voltage medium voltage and low

voltage lines and associated sub-stations equipment apparatus, cable and wires and co-ordination of

Transmission facilities for the state of Uttarakhand.

PTCUL is the State Power Transmission Utility (STU) responsible for building, operating and

maintaining Transmission Substations and Lines at Extra High Voltages (EHV) of 132 KV, 220 KV,

400 KV & above. It was carved out of UPCL in June 2004 as a part of Power Sector Reforms

process. PTCUL is also responsible for Load Despatch and Energy Management functions in the

State through Load Despatch Centres (LDCs).As Corporate entity, PTCUL aims to implement best

practices of Project Implementation and Operations & Maintenance Management to ensure

efficiency, reliability and commercial viability of Power Transmission System in the State. It

endeavours to be among the best Transmission Utilities in the Country in these parameters within

three years.

FUTURE GROWTH PLANS

UTTARAKHAND INTEGRATED TRANSMISSION PROJECT (WITH ADB FUNDING)

Government of Uttarakhand has entered into MoUs with Central Generating Cos. (NHPC, NTPC &

others), State Generating Co. (UJVNL) and Private Generating Cos. (GMR, GVK, Reliance &

others) for development of Hydropower upto a total capacity of 6000 MWs (till 2010-11) in

Yamuna, Bhagirathi, Alaknanda and Sharda river basins.

In order to evacuate such huge quantum of power from the upper reaches to suitable pooling points

within the State in an systematic manner an Integrated Transmission Project is planned to be

executed by PTCUL coinciding with completion of the Hydro projects. The Project involving a huge

transmission network of 400 KV & 220 KV Substations and Transmission Lines (Details under

Annexure) is developed with the twin objectives in view-optimal power carriage with the least

corridor and forest invasion.

Being a unique model in the Country involving issues of intra-state and inter-state transmission

systems, MoP, NRPC and CEA have approved these projects to be executed by the STU namely

PTCUL.

The Project involving an estimated outlay of Rs. 2446 Crores is being debt-funded (70%) by Asian

Development Bank with the balance (30%) being equity-funded by the State.

Page 22: Imp e cactuk

19

UTTARAKHAND POWER CORPORATION LTD.

Compliance Status Of The Directions Issued By Hon’ble Commission In Its

Tariff Order Dated 18-03-2008

1. Misuse of electricity by staff:

UPCL in first phase has completed the metering of all departmental employees and has taken steps

to evolve a policy for supply of electricity to departmental employees and recovery of electricity

charges form them. The said policy is expected to be finalized by the end of September, 2009.

2. Disconnection Notice and unexpected Demand Raised:

UPCL in first phase has started the billing of all high value consumers having load above 25 KW

covered under Rate Schedule RTS-2 & 7 centrally at Corporate Office, which is targeted for all the 3

phase consumers by the end of FY 2009-10. Billing being centralized at Corporate Office the

chances of raising of unexpected demand to consumers are minimized and disconnection notices are

served only in the default cases.

3. Consumer Servicing:

UPCL has taken the following steps to improve the services provided to the consumers:

(i) Billing of all high value

consumers having load

above 25 KW covered

under Rate Schedule RTS-

2 & 7 has been started at

Corporate Office which is

to be extended for all 3

phase consumers by the

end of FY 2009-10.

(ii) A Corporate Level

Dispute Settlement

Committee has been

constituted at Corporate

Office to settle the

disputed cases out of Court.

(iii) A Corporate Billing MIS Software has been developed for analysis of billing data.

With the help of this software, NA / IDF / RDF / ADF cases are identified and

corrective action are taken accordingly.

(iv) A project for Automatic Meter Reading and data logging of Distribution

Transformers and Feeders is being taken up for high value consumers. The

implementation of AMR and IEMS in respect of consumers having load above 75

KW is expected to be completed by September, 2009.

3038.8

3482.12

3826.04

4304.13

4882.47

5530.33

6732.05

7631

0

1000

2000

3000

4000

5000

6000

7000

8000

Energy

GWh

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Input Energy (GWh)

Input Energy(GWh)

Page 23: Imp e cactuk

20

(v) UPCL has constituted

Forums for Redressal of

Grievances of Consumers

separately for Garhwal

Zone and Kumaon Zone

under the provisions of the

Electricity Act, 2003.

These Forums are

functioning effectively.

(vi) UPCL is following the

Standards of Performance

in its working as laid

down by Hon’ble

Commission through

Regulations. Monthly report on the same is being regularly submitted to Hon’ble

Commission.

(vii) UPCL is perusing with the department of post to extend the facility of deposit of

electricity bills in all the post offices of the State of Uttarakhand.

(viii) UPCL has deployed additional manpower 798 Nos. for meter reading and bill

distribution work and 369 Nos. for disconnection and other commercial work for

giving better services to the consumers.

(ix) Functioning of Bijli Suvidha Kendra in each division is expected to be started by the

end of September, 2009.

4. Sales forecast, Energy Losses and Power Purchase Requirement:

The details / status of action taken in the matter are as follows:

(i) Efficiency Improvement

UPCL realises the importance of

improving efficiency in its

operations and is committed to

implement a number of technical

and commercial measures in this

direction in FY10. The objectives

of efficiency improvement

program would be to put together

a reliable Distribution System and

enhance quality of supply of

electricity to the State consumers

as well as reducing the overall

technical and commercial losses

of the Corporation within a

period of 2-3 years.

2229.09

2465.32

2696.44

3156.58

3497.2

3885.92

4736.1

5494

0

1000

2000

3000

4000

5000

6000

Energy

(GWh)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Billed Energy(GWh)

Billed Energy(GWh)

55.18

53.91

47.02

62.69 65

.23

61.8

62.88

68.49

0

10

20

30

40

50

60

70

Overall

Eff. (%)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Overall Efficiency(%)

Overall Efficiency(%)

Page 24: Imp e cactuk

21

(ii) Distribution System Improvement

� Construction of Ring

Mains in towns to

improve reliability in

supply.

� Converting single phase

lines to three phase lines.

� High Voltage

Distribution System

(HVDS) to improve

quality of supply.

� Strengthening the

capacity in the

Distribution System to

be compatible for five

years’ load growth.

� Distribution Automation - it is envisaged that all 33 KV and 11 KV feeders shall be

automated through a Distribution SCADA System (in phases) to monitor automatically

the operation of the feeders for overloading, tripping and low frequency.

� Data Logging - this is aimed at compilation of all technical data in respect of the

Distribution System connected to a 33/11 KV sub-station, including the number and

durations of tripping, meter readings of all distribution transformers and feeders

connected to the sub-stations.

(a) Energy Accounting / Audit:

� Metering of consumers

has been completed by

98%.

� All the 33 KV / 11 KV feeders have been

metered and metering of

Distribution

Transformers is in

progress.

� Consumer Indexing and

Geographical

Information System

(GIS) Mapping have

been completed in Roorkee and Dehradun Circles and is in progress in Rudrapur

Circle.

� Meter-reading of the 33 KV Feeder meters are being taken manually and losses at 33

KV feeders / voltage shall be assessed regularly for analysis.

26.65

29.2 29

.52

26.66

28.37

29.73

29.65

26.8

25

25.5

26

26.5

27

27.5

28

28.5

29

29.5

30

Losses

(%)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Distribution Losses(%)

Distribution Losses(%)

44.82

46.09

52.98

37.31

34.78 38

.2

37.12

33.37

0

10

20

30

40

50

60

Losses

(%)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - AT & C Losses(%)

AT & C Losses(%)

Page 25: Imp e cactuk

22

(b) Segregation of Agricultural Feeders:

� 95 Agricultural

Feeders have been

identified and are

envisaged to be

segregated from

Rural Feeders,

largely in Roorkee

& Rudrapur Circles

and work is under

progress as per

budget provision.

(c) Automatic Meter-reading:

� A project for automatic meter-

reading and data-

logging of

Distribution

Transformers and

Feeders is being

taken up for high

value consumers in

line with the

directions of

Hon’ble

Commission.

(d) Prepaid / Smart Meters: � A Pilot Project for installation of pre-paid / smart meters (1000 Nos.) in Dehradun is

envisaged for

implementation. The

use of pre-paid

meters will improve

billing and

collection efficiency

and will ensure

consumer

satisfaction by

avoiding security

deposit, bill

payment, etc. and

reduction of AT&C

Losses.

658.58

710.94 84

6.82

846.43 94

7.38 10

181285.77

1789

0

200

400

600

800

1000

1200

1400

1600

1800

Revenue

(INR Cr)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Billed Revenue(INR Cr)

Billed Revenue(INR Cr)

495.45

541.37

565.02 72

3.58 86

2.64

895.35

1149.2

1656

0

200

400

600

800

1000

1200

1400

1600

1800

Revenue

(INR Cr.)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Revenue Collection(INR Cr)

Revenue Collection(INR Cr)

1.63

1.55

1.48

1.68 1.

77

1.62 1.

71

2.17

0

0.5

1

1.5

2

2.5

Collection

(Rs./Unit)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Revenue Collection(Rs./Unit)

Revenue Collection(Rs./Unit)

Page 26: Imp e cactuk

23

(e) Control of Energy Theft: � In order to curb theft

of energy, the

following measures

are taken up by

UPCL:

(a) LT Conductors

are being

replaced by

AB (Aerial

Bunch)

Conductor in

theft areas.

(b) Vigilance

Raids are

being

conducted and cases are being registered U/s 126 and 135 of Electricity Act.,

2003.

(c) All new LT extensions for PTW consumers are envisaged through HV

Distribution System / AB Conductors.

(f) Billing System: � Personnel have been

deployed from

UPNL and through

job contract from

qualified Self Help

Groups (SHGs) in 18

Distribution

Divisions for meter

reading and bill

distribution work.

� The work of meter

reading and bill

distribution in 12 hill

divisions is in

process of finalizing SHGs groups through competitive bidding. This will reduce

NA/NR cases in meter reading.

� Defective meters in domestic and commercial categories existed as on 31-03-2008

were targeted to be replaced on priority basis.

(g) Centralised Computerized Billing:

� The centralized computerized billing at Head Quarter has been completed for all

categories of consumers above 25 KW. HT/LT consumers (3,717 Nos.) of RTS-2 &

RTS-7 are being billed successfully since last seven months.

� The feeding of master data of remaining consumers of other categories is in progress.

(h) MRI Analysis: MRI of all consumers above 25 KW is being done on monthly

basis. Analysis of MRIs of only suspected consumers is being done at HQ level.

75.23

76.15

66.72

85.49 91

.06

87.95

89.38 93

0

10

20

30

40

50

60

70

80

90

100

Collection

Eff. (%)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Collection Efficiency(%)

Collection Efficiency(%)

73.35

70.8

70.48

73.34

71.63

70.27

70.35

73.2

68.5

69

69.5

70

70.5

71

71.5

72

72.5

73

73.5

Billing

Eff. (%)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Billing Efficiency(%)

Billing Efficiency(%)

Page 27: Imp e cactuk

24

� 100% analysis of all MRIs and revenue assurance audit of all High Value Consumer

bills at Centrialised Billing Center is planned to be started from July, 2009.

(i) Other Efficiency Improvement Measures:

� Periodical testing of meters have been started.

� Implementation of Best Practices in Meter-reading, Bill Generation / Distribution and

Collection.

A Pilot Project for overall Revenue Improvement Action Plan is under implementation in

Dehradun (Urban) Circle.

5. LT Consumers:

UPCL has taken steps to computerize all the bills of all categories of consumers as per

directions of Hon’ble Commission. Tendering process has been started and after finalization

of the same, the work will be awarded to the qualified firm (s).

6. Low Load Factor / Fixed Charges and Minimum charges:

As per direction of Hon’ble Commission testing of meters of LT consumers in non-domestic

and industrial categories was started by UPCL and testing report was submitted to Hon’ble

Commission vide UPCL’s letter No.-196/UPCL/ Com/UERC, dated 20-01-2009. The testing

of HT consumers has also been started.

7. Domestic Category: The target of release of

new connections under

RGGVY scheme is

1,80,684 connections to

domestic category as

against this 1,41,256

connections have been

released for the year upto

2008-09. The remaining

connections i.e. 39,428

(1,80,684 – 1,41,256) are

targeted to be released in

FY 2009-10.

8. Mounting Arrears:

UPCL has taken steps to

recover arrears from consumers through disconnection, issue of notices under the provisions

of the Uttar Pradesh Government Electrical Undertakings (Dues Recovery) Act, 1958 and by

perusing the cases pending with various Courts of Law. A Corporate Level Settlement

Committee has also been constituted to settle the dispute out of Court.

9. Provision for Bad & Doubtful Debts:

Policy and guidelines for writing of bad debts and provisioning for bad and doubtful debts

have been approved by Board of Directors of UPCL, which were submitted to Hon’ble

Commission vide UPCL’s letter No.-1657/UPCL/UERC /B-5/DF, dated 15-03-2008. UPCL

has taken steps to evolve a detailed procedure to implement these policies and guidelines,

which is expected to be finalized by the end of June, 2009.

10. Treatment of Interest during Construction (IDC):UPCL is in process to award the work

of framing a policy on treatment of interest during construction period and allocation of IDC

354.71 39

9.65 43

1.82 47

7.91 53

2.97

594.62

713.14

797

0

100

200

300

400

500

600

700

800

Consumption

(KWh)

2001-02

2002-03

2003-04

2004-05

2005-05

2006-07

2007-08

2008-09

Years

Performance - Annual Per Capita Consumption(KWh)

Annual Per Capita Consumption(KWh)

Page 28: Imp e cactuk

25

to CWIP and finally to fixed assets. The said work will be got done by the end of September,

2009.

11. O&M Expenses:

In this connection, it is submitted that the additional manpower has been deployed by UPCL

to improve the consumer services like meter reading, bill distribution and disconnection of

defaulting consumers and the expenses incurred on this account is shown under the head

A&G expenses. Moreover, UPCL is required to pay the increase salary to its employees as

per the recommendation of 6th Pay Commission and orders of GoU. Thus, UPCL has not

incurred any additional expenditure on this account.

12. kVAh Based Tariff for Non Domestic and LT Industry Categories:

Meters are being installed on the connections of non-domestic and LT categories having data

on which kVAh based tariff may be done. Such meters have been installed on all the

connections having load above 25 KW and on the remaining consumers such metering shall

be completed by the end of September, 2009.

13. Basis of Fixed Charges for LT Industries and Non-Domestic Consumers:

As per direction of Hon’ble Commission the contracted load of all the LT consumers have

been converted in KW by using the conversion factor as specified by the Hon’ble

Commission. The data of maximum demand is also being maintained in KW and KVA in

respect of all the consumers having load above 25 KW.

14. Re-determination of Tariff for Railway Traction:

The re-determined Tariff of Railway Traction has been implemented by UPCL vide O.M.

No.-1182/UPCL/UERC/F-77, dated 17-05-2008.

15. Accounting of Revenue from Minimum Consumption Guarantee:

Monthly account of deferential amount between minimum consumption guarantee revenue

and revenue from energy charges is being maintained by UPCL and has already been

submitted to Hon’ble Commission vide UPCL’s letter No.-80/UPCL/RM/B-6, dated 15-04-

2009.

16. Fixed Assets Register:

The work of preparation of Fixed Assets Register has been awarded to a Chartered

Accountants Firm and the work is in progress.

17. Employee Cost:

A copy of report of study conducted by National Productivity Council is enclosed herewith

for kind perusal of Hon’ble Commission.

18. Theft of electricity:

In order to curb theft of energy, the following measures are taken up by UPCL:

(i) LT Conductors are being replaced by AB (Aerial Bunch) Conductor in theft areas.

(ii) Vigilance Raids are being conducted and cases are being registered U/s 126 and 135

of Electricity Act., 2003.

(iii) All new LT extensions for PTW consumers are envisaged through HV Distribution

System / AB Conductors

19. Implementation of Tariff approved by Hon’ble Commission vide order dated 18-03-

2008:

The Tariff as approved by Hon’ble Commission for FY 2007-08 & 2008-09 has been

implemented by UPCL as per provisions of the Electricity Act, 2003 and Regulations made

there under.

Page 29: Imp e cactuk

26

UTTARAKHAND BIO-FUEL BOARD (UBFB)

Bio-fuel is the need of the Nation and Uttarakhand State is rightly contributing to release pressure on

traditional source of energy through its different programmes, promoting non-conventional sources

of fuel in the State.

The Bio-fuel Species Plantation is pioneer and unique programme that

Government of Uttarakhand has initiated, with the view to produce Bio-

diesel through promotion of Jatropha Curcas in degraded and wastelands,

considered one of the most suitable species for Bio-diesel. The plantation

of Jatropha Curcas in degraded and wasteland shall provide employment

to poor and marginalized section specially families Below Poverty Line

(BPL), SC and ST category. It shall also help in soil conservation and

treatment of landslides area in hills, simultaneously enhance the green

patches in the State.

The Bio- Fuel Species Plantation programme was launched

in 2004, by inviting EOI for an area of about 2,00,000

hectares waste land of the State.

Tri-partite Agreement………..

A tripartite agreement was signed on 16th June 2004 in presence of Hon’ble Chief Minister of

Uttarakhand amongst

Govt. of Uttarakhand through Forest Department

Uttarakhand Van Vikash Nigam

Uttaranchal Bio- Fuel Ltd.

As per the tripartite agreement Uttarakhand Bio-Fuel Ltd. is under a

process of establishing a plant that would produce 50 MT / day of bio-

diesel by tranesterification process in the initial stage. The plant is being

established in Amanatgarh near Biharigarh, construction is over and

commercial production will be started as soon. It is proposed to enhance

the Capacity of the plant two 600 MT/ day in due course.

Page 30: Imp e cactuk

27

ACTIVITIES BEING CARRIED OUT BY UREDA UNDER

ENERGY CONSERVATION PROGRAMMES

Preparation of a comprehensive status report on Compliance/Non Compliance of

Designated Consumers notified/to be notified by the BEE/ SDA in the State of

Uttarakhand.

Preparation of a comprehensive status report on availability of all notified equipments by

the BEE in the State of Uttarakhand.

Preparation of a detailed list of energy audits firms having the specific specialization in

various industry sectors.

Detailed survey of buildings in Uttarakhand, which fall under the Energy Conservation Act

and preparation of a list of commercial buildings with their load, annual energy

consumption etc. for declaration as designated consumers in the State of Uttarakhand.

Preparation of draft documents for various State Level Policies/Regulations, concerning

energy conservation and energy efficiency suitable for the state of Uttarakhand.

Preparation of detailed report on State Level Energy Conservation Awards including

selection of different sectors, selection criteria, evaluation methodology and constitution of

State Level Energy Conservation Awards.

To provide the training to Designated Consumer personals on E-data filling and analysis of

energy data on the format designed by BEE.

Preparation of an evaluation study report on the Impact of EC Act, 2001 in the State of

Uttarakhand. This study should include the initiative taken by the Govt., Energy Utilities,

SDA, Designated Consumer and Notified Building Consumers.

Preparation of annual year book of Energy Conservation Measures taken by the SDA, State

Govt. and other stakeholders of the State of Uttarakhand.

Preparation of an evaluation study report on the demo project (3 Nos.) and prepare a plan

for dissemination of the demo project in the other part of the State.

Page 31: Imp e cactuk

28

DEMO PROJECT BEING CARRIED OUT IN UTTARAKHAND

Installation of 80 Nos. LED based Energy Efficient Street Lights at Chakrata Road by Nagar

Nigam, Dehradun. 75 % funds provided by BEE & 25 % by Nagar Nigam. Cost of project is

86.45 lakh.

Installation of 415 Energy Efficient Street Lighting Systems at Lal Bahadur Shastri

Academy Mussoorie. 100% funds being provided by BEE i.e. 32.185 lakh.

Revamping/replacement of Drinking Water Pumps, Gharwal Jal Sansthan at Rajpur Road,

Dehradun. Estimated cost is 20 lakh being provided by BEE.

BEE sponsored study for assessment of energy consumption & energy conservation potential

by NPC, Kanpur in 03 SME cluster, industries

03 high energy consuming agricultural pump sets 11 kv feeders.

03 No high energy consuming water works feeders.

03 No building complex of above 500 kva connected load.

EVENTS ORGANIZED BY UREDA FOR PROMOTION & AWARENESS OF ENERGY CONSERVATION

Organized district level & state level painting competition for awareness of energy

conservation among school children’s.

Distributed Energy Conservation Guide Book prepared by UREDA in Uttarakhand schools

and Educational Institutes.

UREDA is planning to prepare and introduce comprehensive course on Energy Conservation

for school level education.

Organized district level & state level energy conservation day on 14 Dec 2008 in all dist. of

Uttarakhand.

Organized workshop on “Energy Conservation in Industrial Units & use of Alternate

Energy” at Haridwar SIDCUL Industrial Estate on 18 Feb 2009.

Organized workshop on “Energy Conservation in Industrial Units & Use of Alternate

Energy” at Udham Singh Nagar on 20 March 2009.

Page 32: Imp e cactuk

29

PUBLICITY & AWARENESS ACTIVITIES

• 200 State transport buses has been painted with energy conservation slogans for publicity.

• 10 hoardings has been installed for energy conservation promotion.

• 1.5 lakh stickers are being distributed for use of CFL & conservation of electricity measures.

• Various other publicity campaign are proposed for energy conservation awareness.

Letter to every Village Panchayat/Pradhan has been sent for replacement of non-

efficient bulbs with highly energy efficient CFL.

Page 33: Imp e cactuk

30

Energy Efficient Tube Lights and CFL Distribution At Subsidized Rates

� Fitment of CFL and EE Tube lights in Govt. Departments at subsidized rates of various firms as

per tender by UREDA.

Ref: Letter of Chief Project Officer No. – 102 / UREDA / CFL / T-5 / 08-09, dated – 16

th April’2009.

Page 34: Imp e cactuk

31

CFL Promotional Programme Organize by UREDA

UREDA has promoted CFL fitment programme “ Save Energy – Generate Energy” a massive drive

to replace the conventional bulbs with the energy efficient lamps in Pithoragarh Dist. Along with

distribution of Energy Conservation tips.

Ref :- Letter of DM, Pithoragarh no.- 404/UREDA/CFL date. 24/09/2004

Page 35: Imp e cactuk

32

Page 36: Imp e cactuk

33

Energy Conservation Activity, Programme, Workshop, Seminar, Demonstration

& Street Play Organize by UREDA in different dist. Of Uttarakhand.

Page 37: Imp e cactuk

34

Uttarakhand Energy Conservation Award

The State has Started Energy Conservation Award in Following Categories in the Year 2009 – Large

and Medium Scale Industry, Small Scale , Commercial Buildings , Hotels and Hospitals , Office

Buildings and Educational Institutes , NGO , Energy Auditors and Energy Managers .

Ref:- Letter of Ad. Secretary GOU no. – 1334/I/2009-10(3)/17/2005

Page 38: Imp e cactuk

35

Page 39: Imp e cactuk

36

UREDA ON THE TRACK FOR IMPLEMENTATION OF ECBC

UREDA as a SDA is implementing energy conservation programme in Uttarakhand. UREDA has

engaged consultants architect for preparing the guidelines with respect the ECBC code of BEE. The

implementation of ECBC in state will be soon.

Page 40: Imp e cactuk

37

LIST OF BEE CERTIFIED ENERGY AUDITOR & ENERGY MANAGER IN UTTARAKHAND

Sr. No. Name of EA/EM BEE Reg. No. E-Mail ID

1 Mr. Ashish Vashishth EA-0140 [email protected]

2 Mr. Ram Krishna Sharma EA-0757 [email protected]

3 Mr. M N Khosla EA-2024 [email protected]

4 Mr. Gordhan Ram Choudhary EA-3590 [email protected]

5 Mr. Sanjay Kumar Tiwari EA-3676 [email protected]

6 Mr. Shayam Lal Goyal EM-0716 [email protected]

7 Mr. Girish Chandra EA-3854 vidyutnirikshah@vidyutsuraksha-

Uttarakhand.com

8 Mr. Nagendra Singh EM-0753 ––

9 Mr. Amrish Kumar Midha EA-0572 ––

10 Mr. Mukesh Kumar EA-0607 [email protected]

11 Mr. Rajan Vohra EA-0810 [email protected]

12 Mr. Rajendra Kumar Daga EA-1729 [email protected]

13 Mr. Sudhir Kumar Srivastav EA-3250 [email protected]

14 Mr. Surendra Kumar Sharma EA-4133 ––

15 Mr. Bhupender Singh Kaneri EA-4840 ––

16 Mr. Ajeet Kumar Sharma EA-5351 ––

17 Mr. Srinivasa Rao Modalavalasa EA-5755 ––

18 Mr. Akhlaq Rasool Siddiqui EM-1176 ––

19 Mr. Kamal Bansal EA-2318 ––

20 Mr. Ajay Bist EA-4167 ––

STANDARDS AND LABELING PROGRAMME

The Energy Efficiency Standards and Labeling programme is a key thrust Area of BEE under the

Energy Conservation Act, The objectives of this program is to provide the consumer an informed

choice about the energy saving, and thereby the cost saving potential of the marketed household and

other equipment.

Name of Few Manufactures and Authorized Dealer/ Distributors of BEE Notified

Equipments in Uttarakhand

ACE Enterprises, Dehradun Bhagwati Gas Employers, Rudrapur

Composite Engineers, Haridwar Lightex, DehraDun

Composite Engineers, DehraDun Bobby Electronics, Rishikesh

Amit Associates, DehraDun Kumaon Electronics, Haldwani

Sniles Stores, Dehradun OM’s Digital Shop, Mussoorie

Himalay Engineering Corporation, Dehradun Pal Electrical and Refrigeration, Rishikesh

Vikas Engineering Company, Haldwani Jindal Enterprises, Roorkee

Sanchem Engineers Pvt. Ltd, DehraDun J.N. Electricals, Haldwani

A.V. Enterprises, Rishikesh Kumar Electricals, Kotdwar

Aggarwal Gas Agency, Haldwani Singh Electric Company, Dehradun

Page 41: Imp e cactuk

38

DEMAND SIDE MANAGEMENT (DSM)

Entails actions by the utility that influence the quantity or patterns of use of energy consumed by end

users, such as actions targeting reduction of peak demand or reduction of energy consumed during

periods when energy-supply systems are constrained.

While, Peak demand management does not necessarily decrease total energy consumption but

could be expected to reduce the need for investments in networks and/or power plants, the strategic

conservation would lead to reduce energy consumption.

Ref. - UPCL EOI for Customer Management and Services, Revenue Management including AT & C loss reduction,

Complaint Management, O&M of distribution system including sub-station & DSM invitations.

Page 42: Imp e cactuk

39

INITIATIVE TAKEN BY GOVERNMENT DEPARTMENTS

Bachat Lamp Yojna

An agreement done between Bureau of Energy Efficiency, Uttarakhand Power Corporation ltd. and

M/s Intersuez Advisors Pvt. Ltd. on dated 26th November’2008 for the Uttarakhand efficiency

lighting project (UELP) under Bachat Lamp Yojna under Govt. Of India. The aim of this agreement

is to start the awareness and information campaign for the project in association with UPCL. Reference: letter Director – Finance, UPCL (No. 137/UPCL/Dir (F) / BLY / DF-33) Dated: 07/01/09

Page 43: Imp e cactuk

40

Page 44: Imp e cactuk

41

Activity Regarding Energy Conservation

• A Govt. Order for implementation of Energy Conservation and efficiency for all Govt. and

Semi-Govt. Offices and residential buildings .to equipped with Solar Water heating system

and construction of new buildings as per Energy Conservation Building Code.

• Fitment of Energy Efficient Motors along with capacitors at all submersible pumps, tube

wells, canal water lifting pumps

• Fitment of Energy Efficient Lights to save Approx. 40% Electricity through all replaceable

Lightning points.

• Uses of CFL in corridor and outside area of building to save electricity.

• Uses of Solar street lights in all industrial units, commercial units, office and residential

complexes.

• Installation of Bio-gas systems in village areas to save trees and fulfill the requirements of

Energy of Rural areas .

Reference : Letter – Chief Secretary Govt. Of Uttarakhand (Mo. 838 /I/2004-05/100/02 . Dated – 28

thDecember’04.

Page 45: Imp e cactuk

42

Page 46: Imp e cactuk

43

Implementation Programme For Energy Conservation In all Govt./ Semi. Govt.

Buildings

• Replacement of CFL and all Energy efficiency tube lights in all Govt., Semi Govt. and

Corporation Buildings.

• Replacement of Energy Efficient Lighting systems when old defective equipments need to be

replaced.

• Advisable to conduct Energy audits for all Govt./ Semi Govt. Buildings for implementation/

modification as per Energy Auditor Report.

• Installation of energy Efficient Street Light system by automatic switching, Timer system to

avoid wastage of electricity in day or in nights by the municipalities. Defense areas are

exempted by this order.

• Installation of Solar water heater in all residential, non-residential buildings.

Reference: Letter – Chief Secretary GOU. No.(87 (R ) / I / 2006 – 05 / 100 / 2002 dated 4 th January ‘2007

Page 47: Imp e cactuk

44

Page 48: Imp e cactuk

45

Implementation Of Recommendations under Energy Audit Reports

� Fitment of Sample 36watt. LED street light in campus area.

� Commitment to replace Energy Efficient T-5 Tube lights in Administration Office.

� Fitment of L.E.D Bulb in Tiger Mess building as earliest.

� Replacement of Old A.C Units with Energy efficient star rated A.C within few months.

Reference: Letter of ADGP ,ITBP Dehardun – ITBP/ IV/ 11093 / 1/ construction/209-6156. dated –19th june’09.

Page 49: Imp e cactuk

46

Implementation Of Recommendations under Energy Audit Reports � Replacement of all non-efficient Tube lights, Fan Regulators with high-energy efficient

lighting system and electronic regulators.

� Replacement of efficient LPG Gas burners with old traditional heaters.

� Improvement in ceiling of Air-Conditioner area and setting of A/C temp. at 25-26OC etc.

Ref:- Letter IIT Roorkee, Director for Implementation of EC recommendation after EA Report

Page 50: Imp e cactuk

47

State Govt. promotion of Solar Water Heaters

UREDA have installed 186 no. of solar Water Heaters in Uttarakhand of capacity from 40- LPD to

5050 LPD Total capacity 84,050 LPD. For promotion of this State Govt. is giving rebate of Rs. 75/-

pm. in the electricity bill against installation of minimum 100lt. Capacity of Solar Water heater.

Ref. – UPCL Tariff for 2007-2008

Page 51: Imp e cactuk

48

Page 52: Imp e cactuk

49

ENERGY AUDIT CONDUCTED BY UREDA IN BUILDINGS OF

UTTARAKHAND

Sr. No. Description of Building Place of Building

1 Hotel Drona Dehradun

2 ONGC Tel Bhawan Dehradun

3 Doon Hospital Dehradun

4 AHEC, IIT Roorkee

5 Water Work Campus Dilaram Bazar , Dehradun

6 Indian Institute of Petroleum Dehradun

7 Bharat Heavy Electrical Limited Haridwar

8 Doiwala Sugar Mill Dehradun

9 IGNFA , Forest Research India Dehradun

10 IIRS Building ,Kalidas Road Dehradun

11 Wadia Institute Building Dehradun

12 Wild Life Institute, Chanderbani Dehradun

13 RIMC Building Cantt. Dehradun

14 IRDE Building , Raipur Road Dehradun

15 Opto Electronics Factory Building, Raipur Road Dehradun

16 Ordinance Factory, Raipur Road Dehradun

17 ATI, Nainital Nainital

18 UJJWAL Bhawan Dehradun

19 ITBP Building, Seemadwar Dehradun

20

Administrative Building at Srinagar and Life

Science Block at Chaurash, HNB Garhwal

University, Pauri Garhwal

Srinagar

Page 53: Imp e cactuk

50

21 Cantonment Board Office of Cantt, Dehradun Dehradun

22

Triveni Guest House of Tehri Hydro

Development Corporation Ltd, Pragati Puram,

Rishikesh Distt., Dehradun

Dehradun

23

Administration Building and 350 bedded Boys

hostel of GB Pant Engineering College,

Ghuddaudi Pauri Garhwal

Pauri Garhwal

24

Administrative Building Library cum

Auditorium Building, Biotechnology &

Molecular Biology Laboratory, Plant Pathology

Laboratory, Bosisen Field Laboratory at

Vikekanand Parvatiya Krishi Anusandhan

Susthan, Hawalbagh, Almora

Almora

25

Main Building and Annexe building of Director,

Uttarakahand Secondary Education Board, Ram

Nagar, Nainital

Nainital

26

Main building , Workshop, Cultural Hall, Hostel

and Residental building of Industrial Training

Institute (ITI), Niranjanpur, Majra, Dehradun

Dehradun

27 Administrative Block and Officer Mess of ITBP

Academy, Mussoorie Mussoorie

28

Forest Training Insititute, Haldwani and

Research Campus, Haldwani office all

buildings

Haldwani

29 Office of the Director General, Health Services

Chander Nagar, Dehradun Dehradun

30 Office of the Principal Govt. Polytechnic,

Suddhowala, Dehradun Dehradun

31

Office and hospital ward of Sushila Tiwari

Hospital & Medical College, Rampur Road,

Haldwani

Haldwani

32 Administrative Block and Hostel of Engineering

College, Dwarahat, Almora Almora

33 Office Buildings of the High Court, Nainital

Nainital

34 GB Pant Agriculture University, Pant Nagar, US

Nagar Udham Singh Nagar

35 Bharat Sanachar Nagar Limited, Patel Nagar Dehradun

36 Sachiwalya Dehradun

37 Vidhan Sabha Dehradun

Page 54: Imp e cactuk

51

LIST OF PROPOSED DESIGNATED ENERGY CONSUMER OF

COMMERCIAL BUILDINGS IN UTTARAKHAND

S.No. Name & Addresses of Buildings District Connected

Load

Avg.Monthly Cons. (Unit)

Avg Bill Amt (Rs.)

1 IIRS, KALIDAS ROAD DEHRADUN 920 93951 365667

2 O.N.G.C., TEL BHAWAN , ONGC OFFICE DEHRADUN 1488 378200 1188792

3 ADM. OFFICER, G.B. PANT HIMALYA , KATARMAL, KOSI

ALMORA 1000 49996 200538

4 G.M IDPL , VEERBAHDRA RISHIKESH 2853 463311 3110605

5 SUPRITENDENT S.P.S HOSPITAL , DEHRADUN ROAD

RISHIKESH 550 18900 275989

6 M/S HIMALAYAN HOSPITAL TRUST DEHRADUN 638 268197 887349

7 D.R.M. NORTHEN RAILWAY , RAILWAY STATION DEHRADUN 600 48787 174742

8 DIRECTOR, WILDLIFE INSTITUTE , CHANDRABANI DEHRADUN 840 89772 326803

9 DIRECTOR , EXPERIMENTAL LAB, F.R.I. DEHRADUN 800 166915 637751

10 DIRECTOR, KDMIPE ,9 KAULAGARH ROAD DEHRADUN 3145 841631 3089123

11 HOTEL GRACE MOUNT , LIBERARY ROAD MUSSOORIE 500 44728 192562

12 GM , ORDANCE FACTORY. , RAIPUR DEHRADUN 1369 235672 862126

13 DIRECTOR LIBSNAA , STEPLTON MUSSOORIE 723 48065 272778

14 INDIAN HOTEL , NARENDRA NAGAR TEHRI GARHWAL 876 217915 873113

15 REGISTRAR , HNB GARHWAL UNIVERSITY , CHAURAAS CAMPUS

TEHRI GARHWAL 850 59419 322636

16 G.E.M.E.S FOR N H O , RAJPUR ROAD DEHRADUN 1000 90352 331230

17 DIRECTOR. C.B.R.I ROORKEE 850 152619 669078

18 ADMIN. OFFICER , IIP , MOHKAMPUR DEHRADUN 1003 154992 559694

19 GARISON ENGINEER(I,R&D) , RAIPUR RD. DEHRADUN 3400 483633 1728179

20 GENERAL MANAGER , RAIPUR DEHRADUN 5100 1109077 3035945

21 S.E.,ELECT.,ONGC HOSPITAL , KAULAGARH ROAD DEHRADUN 842 136765 443439

22 PRINCIPAL , G.B. PANTH ENGG. COLLEGE , GHURDORI (1

ST CONNECTION)

PAURI GARHWAL 800 95524 373341

23 SACHIVE , RAMPUR ROAD , P.O. HALDWANI NAINITAL 800 108512 420720

24 GENERAL MANAGER , MANNU MAHARANI , HOTELS LTD MALLITAL

NAINITAL 504 111691 402034

25 DIRECTOR GENREAL, F.S.I. , KAULAGARH ROAD DEHRADUN 540 71451 258374

26 DISTRICT HOSPITAL , NAINITAL ROAD RUDRAPUR 500 41985 1212629

27 CHIEF MEDICAL SUPERINTENDENT , HNB BASE HOSPITAL , MEDICAL COLLEGE

SRINAGAR GARHWAL.

500 27736 111224

28 PRINCIPAL , G.B. PANTH ENGINEERING , COLLEGE GHURDORI (2

ND CONNECTION)

PAURI 691 125981 607452

29 EXECUTIVE ENGINEER , UTTARAKHAND JAL SANSTHAN ,

PAURI (GARHWAL)

895 595454 17194594

30 EXECUTIVE ENGINEER ,HINDOLAKHAL PUMP-1, UTTARAKHAND PAYJAL NIGAM ,

768 244049 154926132

31 DISTRICT HOSPITAL , NAINITAL ROAD RUDRAPUR 500 41985 1212629

32 GE (I) R&D, MES , ANARWALA DEHRADUN 1360 7992 49105

33 REGISTRAR , I.I.T ROORKEE 7297.25 1444463 3720615

Page 55: Imp e cactuk

52

PROGRAM ORGANIZED BY UREDA ON ENERGY CONSERVATION DAY

DATED 14TH DECEMBER 2008 CO-SPONSERED ONGC & ITGI

WORKSHOP ORGANIZED BY UREDA AT SIDCUL HARIDWAR ON DT.

18TH FEB 2009 CO-SPONSRED BEE & HRD IND. ASSOCIATION

Page 56: Imp e cactuk

53

WORKSHOP ORGANIZED BY UREDA AT UDHAM SINGH NAGAR ON DT.

20TH MAR 2009 CO-SPONSRED BEE & IND. ASSOC. OF UK

E-LEARNING TRAINING PROGRAMES ORGANIZED BY UREDA

ON DT. 18TH JUNE 2009 THROUGH PCRA

Page 57: Imp e cactuk

54

REGIONAL MEET/CONFERENCE FOR SDAs, ESCOs, EAs, INDUSTRIES,

GOVT. & SEMI GOVT. ORGANIZATION ON 20TH JUNE 2009

THROUGH UPES, D.DUN SPONSERED BY UREDA, BEE

Page 58: Imp e cactuk

55

ENERGY SAVING HOARDING DISPLAY AT VARIOUS POINT IN CITY

PAINTING COMPETITION ORGANIZED BY UREDA FOR SCHOOLS OF

UTTARAKHAND

Page 59: Imp e cactuk

56

ENERGY CONSERVATION SLOGENS DISPLAYED 200 STATE

TRANSPORT BUSES

Page 60: Imp e cactuk

57

STICKER DISPLAY IN OFFICES AND SCHOOLS

Page 61: Imp e cactuk

58

DISTRIBUTION OF EC GUIDE BOOK IN UTTARAKHAND SCHOOLS

Page 62: Imp e cactuk

59

NEWSPAPER ADVERTISMENTS

Awareness Advertisement published by

UREDA on 15th August 09 on the Occasion

of “Independent Day” Celebration in the

following Newspapers:-

Amar Ujala

Dainik Jagaran

Hindustan

Rashtriya Saharan

Uttar Ujala

Shaha Times

The Himachal Times

Awareness Advertisement published by

UREDA on 20th August 09 on the Occasion

of “Rajeev Gandhi Akshya Urja Divash”

in the following Newspapers:-

Himvani Magazine

Him Pushpa Magazine

Jan-Jan Tak

Ghughati Samachar Patrika

Uttaranchal Sakshya

I-Next

Page 63: Imp e cactuk

60

VOICE OF UTTARAKHAND

Conservation of energy is of paramount importance today as our resources

are being depleted at an alarmingly rapid rate . As a teacher , I encourage

my students to adopt all possible means to save energy like using CFL’s

instead of bulbs and tube lights , using star rated appliances and following

the common habits like switching off the and watching TV only for one’s

favorites programmes , etc. All these have made a remarkable difference

to the electricity bills of the school as well as the student’s parents

K.K. Sharma

Senior Coordinator

Summer Valley School

Dehradun

Using CFL’s, star rated appliances and solar heaters, solar lights and solar

cookers are some of the steps that I have taken to save energy at my

home and I have seen my electricity bills going down very sharply

Rajeev Jain

Computer Professional

Following the energy saving tips of the BEE has helped me to drastically

reduce my electricity bills. I have reduced the use of ACs and other high-

energy consuming appliances to the minimum and encourage my family

members to save energy in every possible in every possible way.

Abhinav Walia

IAS

It is very important for us to conserve energy today if we are to leave a

better world for our children . If we do not save energy today , our

children will curse us after we have left. At home I switch on electric

appliances only when required , an switch off the TV and music system as

soon as I have seen or heard my favorite programmes.

Mrs. Kavita Sharma

Home Maker

Page 64: Imp e cactuk

61

As an Advocate I have to frequently use my computer to draft appeals and

responses. I plan my work in such a way that the computer is switched on

for the minimum possible time. Since the courts are not far away from my

residence. I try and walked to work ,thus saving on fuel also.

I recommend these measures to all my friends, relatives and even my

clients.

Adv. Mrs.Manvi Walia

Hon.Distt.Courts Dehradun

As a CRM of an automobile company, I encourage my technical staff to

use the electrical tools to the barest minimum time possible and to switch

off the lights and fans when not required. I also ensure that the engines

off the vehicles brought in for services / repairs are not run

unnecessarily. these measures have resulted in saving energy.

Sanjeev Walia

CRM OBERI MOTORS

DEHRADUN

As a Charted Accountancy article, I am required to use the computer for

long period of time and even go out for audits quite frequently. I try and

minimize the time that the computer is on. I also turn off my vehicle

engine at crossings to save fuel.

Siddhartha Bhardwaj

(CA ARTICLE)

I am an engineering student. To save energy I minimize the use of my

laptop encourage my friends to do the same. We all keep a strict watch on

the consumption of electricity in our hostel as well as in our college

Rahul Bhardwaj

(M.Tech.Student)

Page 65: Imp e cactuk

62

ACTIVITIES OF UREDA THROUGH MEDIA EYE

Page 66: Imp e cactuk

63

Page 67: Imp e cactuk

64

Page 68: Imp e cactuk

65

Page 69: Imp e cactuk

66

Page 70: Imp e cactuk

67

MEDIA COVERAGE

Awareness program organized by UREDA on “Rajeev Gandhi Akshya Urja Divas”

Dated 20th August 2009 at Haridwar.

Awareness program organized by UREDA on “Rajeev Gandhi Akshya Urja

Divas” Dated 20th August 2009 at Pauri.

Page 71: Imp e cactuk

68

News Paper Advertisement for

Govt. Subsidy Programs on Non-Conventional Energy Equipments

Page 72: Imp e cactuk

69

Page 73: Imp e cactuk

70

Conclusion

The relevance of legislation to improve end –use energy efficiency in all sectors of the economy was

realized as an outcome of a national debate on the need for strengthening the energy conservation

movement.

The Energy Conservation Act lays down clear action plans and envisages the establishment of a

specific organization to convert these plans into reality through various regulatory and promotional

interventions

BEE has a mission to institutionalize energy efficiency, set up a delivery mechanism for energy

efficiency services and to provide leadership to implement a nation-wide energy efficiency program.

Similar to BEE activity our state nodal agency UREDA is also taking the necessary action in the

field of Energy Conservation to fill the gap between demand and supply of electricity in the state and

also make it independent in the Energy sector and to save the revenue of State Govt.