REPORT
UTTARAKHAND RENEWABLE ENERGY DEVELOPMENT AGENCY
(UREDA)
September 2009
Impact of EC Act. in Uttarakhand State & Initiative taken by the Govt., Energy
Utilities, SDA, Designated Consumer and Notified Building Consumers
Project Report under VI Activity of Agreement No. 01/UREDA/VCTAS/2008-09
Prepared By
Association Of Energy Conservation & Environment Protection
September 2009
INDEX
Sr. No. Particulars Page No.
1 ACKNOWLEDGMENT 01
2 ENERGY STATUS IN INDIA 02
3 ENERGY CONSERVATION ACT 2001 & ITS INSTITUTIONALIZATION
04
4 UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING RENEWABLE ENERGY SOURCES
06
5 UTTARAKHAND ELECTRICITY SYSTEM CHARACTERISTICS 18
6 UTTARAKHAND POWER CORPORATION LTD. 19
7 UTTARAKHAND BIO-FUEL BOARD (UBFB) 26
8 ACTIVITIES BEING CARRIED OUT BY UREDA UNDER ENERGY CONSERVATION PROGRAMMES
27
9 DEMO PROJECT BEING CARRIED OUT IN UTTARAKHAND 28
10 EVENTS ORGANIZED BY UREDA FOR PROMOTION & AWARENESS OF ENERGY CONSERVATION
28
11 PUBLICITY & AWARENESS ACTIVITIES 29
12 UREDA ON THE TRACK FOR IMPLEMENTATION OF ECBC 36
13 LIST OF BEE CERTIFIED ENERGY AUDITOR & ENERGY MANAGER IN UTTARAKHAND
37
14 STANDARDS AND LABELING PROGRAMME 37
15 DEMAND SIDE MANAGEMENT (DSM) 38
16 INITIATIVE TAKEN BY GOVERNMENT DEPARTMENTS 39
17 ENERGY AUDIT CONDUCTED BY UREDA IN BUILDINGS OF UTTARAKHAND
49
18 LIST OF PROPOSED DESIGNATED ENERGY CONSUMER OF COMMERCIAL BUILDINGS IN UTTARAKHAND
51
19 REG. MEETING, SEMINARS, TRAINING & OTHER PROGRAMS ORGANIZED BY UREDA
52
20 NEWSPAPER ADVERTISMENTS 59
21 VOICE OF UTTARAKHAND 60
22 ACTIVITIES OF UREDA THROUGH MEDIA EYE 62
23 CONCLUSION 70
1
ACKNOWLEDGEMENT
This project is assigned by UREDA for analysis of the Impacts of EC Act. 2001 in Uttarakhand on
Energy Conservation Policy of Central Govt. and initiatives taken by the State Govt., Energy
Utilities, SDA, Designated Consumer and Notified Building Consumers. For completetion of this
report we wish to convey our heart – felt thanks to UPCL , PTCUL ,CII – Uttarakhand , Association
of Industry – Uttarakhand , Hotel Association – Uttarakhand.
I would like to thank my supporting Team Members Mr. R. K. Aggarwal & Mr. S K Sabarwal ,
Ms.Deepali Jagdev, and Mr. Naresh Tariyal for giving final touches to this Project report.
Last but not the least our thanks are to Mr. A. K. Tyagi (Chief Project Officer), Mr. A. J. Singh
(Dy. Chief. Project Officer) and other UREDA officials for there belief and generous support to our
Organization.
Association Of Energy Conservation
And
Environment Protection
2
ENERGY STATUS IN INDIA
nergy means any form of energy derived from fossil fuels, nuclear substances or materials,
Hydro-electricity and includes electrical energy or electricity generated from renewable sources
of energy or biomass connected to the grid.
About 20% of worlds energy is generated from coal and about 60% of worlds energy is generated
from oil and natural gas. Because of extensive use of fossil fuel, such as coal, oil and natural gas, as
primary source of energy today, the harmful emissions of GHG (Green House Gasses) such as
Carbon Dioxide increases the GHG level in the atmosphere which traps the extra heat reflected from
the earth resulting rise in temperature. Carbon dioxide and some other gases in the atmosphere act
like glass in a green house. They let Sun’s rays through, but trap some of the heat, which would
otherwise be reflected back into space. This Green house effect always existed.
Scientists believes that global warming will cause the average World temperature rise by one Degree
Celsius by the year 2020 and four Degree Celsius by the end of 21st century.
Thus energy conservation has emerged as one of the major issues in recent years. Energy
requirement in our country is increasing in a very rapid rate. India’s demand for commercial energy
in 2020 is expected to increase by 250% from today’s level. Coal accounts for about 50% of primary
commercial energy today and is further increase its share. Despite its low per capita CO2 emission of
less than 1 ton, India contributed over 4% of world total CO2 emission in 2000.
While efforts are being made to improve availability of various energy sources, there is still a
continuing gap between demand and supply of energy. Conservation and efficient utilization of
energy resources play a vital role in narrowing the gap between demand and supply of energy.
Improving energy efficiency is probably the most profitable thing that can be done in the short term.
Energy conservation is the quickest, cheapest and most practical method of overcoming energy
shortage. It is found that there is major scope of energy conservation in electrical distribution system
and in consumer’s installation.
While using energy, a considerable amount of energy is wasted. It is estimated that there exists a
potential of saving of about 30% energy used by us in daily life. In India commercial energy demand
is growing high at annual rate over 6%. It is estimated that by 2020 the total requirement of energy
will be more than 250% of today’s need. But the supply of energy is not growing at par with
demand.
E
3
By reducing consumption of energy through energy conservation also helps us to save precious
fossil fuel like coal, gas, oil which are used by the generating companies to generate electricity. Also
reduction of use of fossil fuel leads to reduction of emission of harmful gasses into the atmosphere.
The prime target sectors are the Domestic & Commercial, Industrial, Agriculture and large
buildings, which are the main consumers of energy. By adopting proper energy efficiency in these
areas, considerable energy conservation may be achieved.
Many energy efficient products, once costly and exotic, are now inexpensive and commonplace
ones. A good quality Compact Fluorescent Lamp costs more than Rs.500 a decade ago now costs
around Rs.120. They use 75 to 80 percent less energy than conventional incandescent lamps and also
lasts more than 10 times longer. As a conventional lamp produces a considerable amount of heat,
most of the energy consumed by a bulb to produce light is wasted as heat. As such, CFL lamps are
more energy efficient. as they do not produce heat and consume about 20% of energy consumed by
an incandescent lamp, while producing same illumination.
In India, general people use electricity for illumination purpose mainly in their houses in addition to
running household appliances. So, designing the houses skillfully to be illuminated primarily by
available daylight will result in considerable saving of electricity, which in turn will save money.
Designing a building with maximum utilization of daylight and use of energy efficient lamps and
appliances will certainly reduce the cost of energy use, which in turn also will make a significant
contribution towards ecology balance.
4
ENERGY CONSERVATION ACT 2001 AND IT’S INSTITUTIONALIZATION
Background
Energy conservation has emerged as one of the central issue in national economic agenda in recent
years. A potential of 20-25 percent reduction of energy consumption from the present level is
possible in the different sectors, without forgoing any of the end-use benefits of energy. The
individual and the society stand to gain from conservation and improved energy efficiency, both in
terms of money saved by reducing energy costs in the short run, as well as reducing investment
needs for energy production in the long run. Energy conservation also reduces or avoids the
tremendous social and environmental costs resulting from in energy generation and wasteful
consumption, such as emissions of carbon dioxide (CO2) and other pollutants and depletion of scarce
resources and damage to the environment. Despite the relatively low per capita energy use in India,
there is a need to increase energy availability to meet basic needs and developmental goals.
However, the high level of energy intensity in some of the sectors is also a matter of concern. Hence,
conservation has to go hand in hand with generation efficiency. A systematic understanding of
energy consumption patterns is needed in each sector, and a strategy has to be evolved to supply
energy efficiently and curtail wasteful consumption.
The relevance of legislation to improve end –use energy efficiency in all sectors of the economy was
realized as an outcome of a national debate on the need for strengthening the energy conservation
movement. The extent of importance attached by the central government to energy conservation is
reflected in promulgation of a separate Act ‘Energy Conservation Act 2001’, which was specifically
enacted to promote energy conservation. The preamble says the EC Act is intended to ‘promote
efficient and environmentally benign policies’ related to energy use.
The Energy Conservation Act 2001 is primarily aimed at the intensive consumers of energy called
Designated Consumers. The Energy Conservation Act has created the Bureau of Energy Efficiency
(BEE) under the Ministry of Power with the primary objective of reducing energy intensity of the
Indian Economy.
The basic objectives of the Act are:
� Provide a policy framework and direction to the national energy conservation activities.
� Coordinate policies and programs on efficient use of energy with the stakeholders.
� Establish systems and procedures to verify, measure and monitor EE improvements.
� Leverage multilateral, bilateral and private sector support to implement the EC Act.
� Demonstrate EE delivery systems through public-private partnerships.
The Energy Conservation Act lays down clear action plans and envisages the establishment of a
specific organization to convert these plans into reality through various regulatory and promotional
interventions. The thrust areas identified for the implementation of the Energy Conservation Act are:
01. Indian Industry Program for Energy Conservation
02. Demand Side Management
03. Standards and Labeling Program for notified equipment and appliances
5
04. Energy efficiency in Buildings and Establishments
05. Energy Conservation Building Codes
06. Professional Certification and Accreditation
07. Manuals and Codes
08. Energy Efficiency Policy Research Program
09. School Education
10. Delivery Mechanisms for Energy Efficiency Services
BEE has a mission to institutionalize energy efficiency, set up a delivery mechanism for energy
efficiency services and to provide leadership to implement a nation-wide energy efficiency program.
The EC Act provides for regulatory functions for market development and information management,
and other enabling functions to achieve its objectives.
The BEE has powers to direct the designated consumers to abide by energy consumption norms and
to get their energy consumption audited are met by specified industry or building complexes. The
power supply utilities are also included in the list of 15 categories of Designated Consumers. The
major regulatory functions of BEE include: Performance standards and labeling; Introduction of
energy conservation building codes; and Activities focused on designated consumers. The energy efficiency market development functions of BEE include sponsoring research and
implementation of demonstration projects; development of performance contracts and promotion of
energy service companies (ESCOs), measurement and verification (M&V) protocols; technology adoption and advancement; training and educational programs and innovative financing of energy
efficiency projects.
BEE also has a critical information management function that includes partnering industry
associations and entering into voluntary agreements on sharing data and information; networking
with ESCOs and energy management consulting organizations.
BEE would function as an information-clearing house on the rational use of energy and
commissioning and preparation of publications and promotional kits.
Ministry of Power, under Section 61 of the Electricity Act, has set up electricity regulatory
commissions the mandate to regulate electricity tariff and lays down the guiding factors to be
considered while determining tariff. Section 61 C requires regulatory commissions to set tariff by
considering “ the factors which would encourage competition, efficiency, economical use of
resources, good performance and optimum investments” Apart from such a strong legal approach,
energy conservation has found priority in many other related initiatives of the MoP. For example, the
MoP has insisted on DSM and energy conservation measures in the MoUs signed with several state
governments / utilities under its financial assistance program (called APDRP).
During the past 3 years, BEE is reported to have initiated actions on the thrust areas and moved
forward, in establishing institutional mechanisms and infrastructural facilities under the mandate of
the Energy Conservation Act and took steps to involve industries, equipment manufacturers,
financial institutions and other stakeholders for implementing the provisions of Energy Conservation
Act.
6
UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING
RENEWABLE ENERGY SOURCES
(Annexure of G.O. No.263/I (2)/2008-04 (8)-96/2001, dated 29-1-2008)
1. Preamble
Uttarakhand is richly endowed with natural renewable resources for generating electricity. Most
of this could be harnessed through environmentally clean Medium & Large Hydroelectric Projects (i.e.
projects with capacity in excess of 25 MW); it is estimated that a capacity of more than 20,000
MW is yet to be tapped through these sources.
In addition, the State has significant Renewable Energy (RE) Sources that includes sites for developing
Micro (up to 100 KW), Mini (100KW-5 MW) & Small (5-25 MW) Hydro power projects as well as
sources for generating electricity through Biomass/Agro residue, Wind power, Solar energy,
Cogeneration etc. This policy aims at expeditiously harnessing these sources of energy that are
non-polluting and are useful for electrification of isolated and remote habitations in Uttarakhand. It is
felt that more than 1,000 MW electrical power could be tapped through these sources before 2020.
2. Objective
To create conditions conducive to Private Sector/Community Participation in power projects
based on RE Sources in the State. In particular:
2.1 To harness the environment friendly RE resources and enhance their contribution to the socio-
economic development of the State.
2.2 To meet and supplement minimum rural energy needs through sustainable RE projects.
2.3 To provide decentralized energy supply to agriculture, industry, commercial and household sector.
2.4 To improve the quality of grid power through such projects, as a consequence of tail-end
generation and feeding.
2.5 To enhance the use of energy sources that assist in mitigating environmental pollution.
2.6 To support efforts for developing, demonstrating and commercializing new and emerging
technologies in the RE sector and, to this end, help establish linkages with national and
international institutions for active collaboration.
7
2.7 To create conditions conducive to the involvement of private investors in RE projects.
2.8 To create public awareness and involve users/local community along with their capacity
building in establishing, operating and managing RE projects.
2.9 To create direct and indirect employment opportunities in the State.
3. Measures To Be Adopted
In order to fulfill the above, the following measures are proposed to be adopted:
Power generation through Hydro projects,
Co-generation in industries such as Sugar, Paper, Fertilizer and Chemical etc.,
Power generation from Biomass / Agricultural residue,
Power generation from urban, municipal and industrial waste,
Power generation from solar energy,
Power generation from wind energy,
Power generation from geothermal energy,
Energy conservation in domestic, agriculture, industrial, commercial and transport sectors
through induction of administrative/statutory/ legislative/ technical solutions and
imposing stringent conditions for all categories of consumers.
4. Potential Proposed To Be Harnessed
Given the geographical conditions of the State of Uttarakhand, and availability of various sources of
energy, the State proposes to harness the resources with active involvement of private/public sector/
community participation in the following manner :–
4.1 Hydroelectric Power:
By virtue of its topographic location,
the State has a number of perennial
streams where water is available
throughout the year. The untapped
potential that could be harnessed
before 2020 through
Micro/Mini/Small Hydro projects is
about 600 MW. The State
Government is committed to
exploiting this potential.
8
4.2 Co-generation:
Uttarakhand has an established industrial base
which is expanding. The Sugar, paper, fertilizer,
chemical, textile and other industries have
an estimated potential of about 220 MW that
could be tapped by co-generation. This would
not only augment the State’ s grid but would
also help captive generation. This potential
would also be exploited by the year 2020.
4.3 Biomass/Agro residue and waste :
It is estimated that about 20 million
Metric Tons of agro residues and
agro industrial/ processing waste is
produced annually in Uttarakhand.
It holds promising potential for
generating decentralized power of
about 300 MW. The State
Government would support and
facilitate harnessing this
potential by 2020.
4.4 Urban, Municipal and Industrial Liquid/ Solid Waste :
At present about 1000 Metric Tons of
Municipal, Urban and Industrial solid/
liquid waste is being produced every day
in the State. Introducing scientific
processing and treatment of this waste
would lead to power generation along
with abatement of environmental
pollution. Initially a small number of such
projects would be supported.
9
4.5 Solar Energy :
The State is endowed
with vast potential of
solar energy and the
Government of
Uttarakhand (GOU) is
keen to tap this
resource; the State would
support efforts for setting
up Solar based power
projects.
4.6 Wind Power :
Sufficient untapped wind power potential is available in the
State. There is immediate necessity for wind mapping in
the State to assess and exploit the available potential. The
State would support such programmes.
4.7 Geothermal Power :
Sufficient untapped geothermal
power potential is available in the
State. There is necessity for
assessment of geothermal energy
in the State to exploit the available
potential. The State would
support programmes for
exploiting the available potential
optimally.
10
4.8 Energy conservation :
Measures related to conservation of energy in
domestic, commercial, agriculture
and industrial sector could lead to 20%
savings in energy consumption.
The State Government is committed
to introducing effective energy
conservation measures in all sectors of
economy. Energy auditing would be made
mandatory in the State especially for
industrial units where the load
exceeds 25 kW. Appropriate mechanisms
would be evolved for effective
implementation of energy conservation
measures.
5. Incentives
5.1 Sale of electricity: O n the electricity generated by the RE projects, UPCL will have the first
right of purchase; such purchases may be made in whole or part as per the requirement of
UPCL. The price of electricity to be purchased by the UPCL will be determined by the UERC;
the price so determined will be announced in advance and will be uniformly applicable to all
producers. The GO U will provide guarantee for the payments to be made by the UPCL for such
purchases.
5.2 Wheeling of electricity: UPCL/PTCUL will undertake to transmit through its grid the power
generated and make it available to the producer for captive use or third party sale within/outside
the State for which wheeling charges uniformly applicable to all producers would be announced in
advance.
5.3 Banking: UPCL would extend the facility of Banking to the developers at mutually agreed terms.
5.4 For evacuating energy from the generation site, requisite network of transmission/ distribution lines
would be provided by UPCL/PTCUL.
5.5 In case of power generation from Municipal Solid Waste, if Government land (belonging to Urban
Local Bodies/Panchayats) is available, the required land for setting up RE projects would be
provided on nominal lease rent of one rupee per square meter per year for a period of 33 years
subject to further renewal on mutually agreed terms and conditions.
11
6. Single Window Clearance For Re Projects:
Setting up of RE projects involves sanctions/clearances from a number of Government
Agencies/Departments. The State Government would provide requisite clearances in a time bound
manner through a single window mechanism. For this purpose a high level empowered committee
(composition at Appendix) is constituted to accord necessary approvals/clearence.
7. Classification Of Projects:
Broadly, RE projects would be classified as
( A ) Hydro Projects (up to 25 MW)
(B) Other RE Projects i.e. projects involving generation of power from co-generation,
Biomass/Agro- residue, urban, municipal and industrial liquid/solid waste, wind, solar energy
and including projects
for energy conservation.
7(A) HYDRO PROJECTS :
(I) Based on the generating capacity, Projects will be grouped into the following three categories: a) Micro Projects with capacity upto 100 kW, b) Mini Projects with capacity above 100 kW and upto 5 MW, c) Small Projects with capacity above 5 MW and upto 25 MW.
(II) In the basis of the mode for identification, projects may be grouped into the following two
categories:
a) Self Identified Projects: developers may identify projects, prepare the D PR and ask for
allotment;
b) State Identified Projects: The State or State Sponsored Agencies may identify projects of any
size, prepare the D PR and allot it in the manner prescribed below :–
Allotment of Hydro Projects: Self Identified Projects: Eligibility criteria
For Micro projects
(i) Individuals who are domiciles of Uttarakhand, (ii) Gram Panchayats of Uttarakhand in the vicinity of the site,
(iii) Societies of Uttarakhand registered under the Society Registration Act, 1860/UP
12
Cooperative Society Act 1965 would be eligible for allotment.
For Mini projects
(i) Individuals who are domiciles of Uttarakhand,
(ii) Gram Panchayats of Uttarakhand in the vicinity of the site,
(iii) Societies of Uttarakhand registered under the Society Registration Act, 1860/UP
Cooperative Society Act 1965,
(iv) Firms registered under the Company Act 1956 and having their manufacturing units
located in Uttarakhand would be given preference for allotment of project.
For Small Projects
These would be open to all; there would be no reservations. For this premium will be decided
later.
Evaluation criteria
For evaluating suitability of a prospective developer, the following would be considered :–
a) Technical capability including past experience in developing, constructing or operating Energy
Projects – this aspect would be evaluated based on a maximum of 60 marks;
b) Financial capability, including the capacity to invest in the equity of the project and the ability
to arrange for institutional finance. The minimum financial capability (Solvency Certificate to
be provided) would be Rs.10.00 Lakhs and for Micro projects and Rs.50.00 Lakhs for Mini
projects. Financial capability would be evaluated based on a maximum of 40 marks.
Payments to be made:
All payments would be made in the form of a Bank draft of any nationalized Bank.
Application fee (Non-refundable): Rs.5000/-
Processing fee (Non-refundable): At the time of signing the development Agreement
For Micro projects: Rs. 10,000/-.
For Mini projects : Rs. 25,000/-.
For Small projects: Rs. 50,000/-
Security payment: At the time of signing the Implementation Agreement
For Micro projects:: Rs.20,000/-.
13
For Mini projects: Rs.50,000/-.
For Small projects: Rs. 1,00,000/-
State Identified Projects:
Small Hydro projects would be allotted on the basis of open competitive bidding (without any
reservation).
Eligibility and evaluation criteria;
Eligibility and Evaluation parameters shall be provided in the Request For qualification
(RFQ)/Request For Proposal (RFP)/ bidding documents.
Allotment Procedure:
The identified projects would be advertised in order to seek bids. Selection of developers would
follow a two-stage process.
i Prequalification: Firstly, the applicants would be evaluated on the basis of pre-qualification
criteria laid down in the RFQ document which will be made available on payment of a
prescribed fee. Broadly, prequalification criteria would be based on balance sheet, annual
report, technical and financial capacity etc. After evaluations, a short list of successful
applicants would be prepared.
ii Financial bid: Applicants short-listed on the basis of prequalification criteria would be
invited to submit their financial bids based on premium payable to the Government of
Uttarakhand. For this purpose the following thresh-hold premium is prescribed (bids
quoting premium below the thresh hold would be rejected out rightly) :–
Above 2 MW & upto 5MW: Rs. 1,00,000/- per MW
Above 5MW & Up to 25 MW: Rs. 5,00,000/- per MW
iii A project will be allotted to the short-listed bidder who has offered the highest bid. The
successful bidder shall be required to deposit the premium and other amount due within the
time specified in the bid document.
iv Complete transparency in allotment of the projects shall be ensured. Comprehensive RFQ
/RFP/ bidding documents would be prescribed for inviting bids clearly enumerating technical
and financial parameters.
7(B) OTHER RE PROJECTS:
Other RE Projects would be kept open for all categories of developers and these would be
14
allotted on self identification basis or, wherever possible, on tariff based bidding.
The procedure for tariff based bidding would be prescribed separately. The Self Identified
Projects would be allotted on the basis of the following:-
Evaluation Criteria:
For evaluating suitability of a prospective developer of a Self Identified Projects, the following would
be considered :–
a) Technical capability including past experience in developing, constructing or operating
Energy
Projects – this aspect would be evaluated based on a maximum of 60 marks;
b) Financial capability, including the capacity to invest in the equity of the project and the ability
to arrange for institutional finance. Financial capability would be evaluated based on a
maximum of
40 marks.
Payments to be made:
All payments would be made in the form of a Bank draft of any nationalized Bank.
Application fee (Non-refundable): Rs.5000/-
Processing fee (Non-refundable): At the time of signing the development Agreement
For projects upto 1MW: Rs.10,000/-.
For projects more than 1MW : Rs.25,000/-.
Security payment: At the time of signing the Implementation Agreement
For projects upto 1MW: Rs.20,000/-.
For projects more than 1MW: Rs.50,000/-.
8. Benefits Under Clean Development Mechanism (CDM)
Projects covered under this policy may not involve cheapest form of generating energy. However,
keeping their environment friendly nature, the State would encourage projects to obtain the
benefits available under the Clean Development Mechanism (CDM).
15
9. Miscellaneous
9.1 More than three Projects in each category enumerated in paragraphs 4.1 to 4.8 will be allotted to
a developer.
9.2 Industrial units located in Uttarakhand and willing to participate in the open competitive bid
for the purpose of establishing RE projects for their captive use, would be given preference by
accepting their bids provided these are not less than 80% of the highest bid.
9.3 The Government of Uttarakhand reserves its rights to allot a project to a State owned enterprise.
9.4 If a feasible Micro/Mini Hydro project remains un-allotted on the basis of the procedure
prescribed in this Policy, the same would be allotted to any developer through open competitive
bidding, the procedure for which would be laid down separately.
9.5 In the event a developer fails to achieve the various stages of completion of the allotted project as
per the prescribed time schedule without valid reasons, the premium deposited shall be forfeited and
the allotment would be cancelled.
9.6 Projects allotted before the date of publication of this Policy in the official Gazette shall continue
to be governed by the Policy under which they were allotted; these would not be eligible for
incentives under this Policy.
9.7 In case of augmentation of capacity of Self Identified Projects due to any reason, the developer would
be required to pay additional premium of Rs.1 Lakh per MW or fraction thereof for enhancement
upto 5 MW and Rs.5 Lakh per MW or fraction thereof in case of enhancement beyond 5 MW
along with requisite amount to take into effect the inflation from the date the premium was paid. For
State Identified Projects allotted on the basis of open competitive bidding, the extra premium to
be paid would be calculated on the basis of a formulation to be specified separately.
9.8 In case any developer, for any reason (before a project is commissioned), sells his project to some
other developer, the developer selling the project shall be required to deposit an additional amount
equal to the bid premium.
9.9 Projects would be offered for a period of 40 years from the date of award at the end of which they
shall revert to the GOU or extended further on mutually agreed terms.
16
9.10 Royalty :
(i) In Micro, Mini and other RE projects governed by this policy, no royalty payment would
be charged.
(ii) In Small Hydro projects governed by this policy, royalty payment for the first 15 years of
operation would be exempted. From 16th year of operation, a royalty 18% of energy
generated would be charged.
10. Amendments/Re laxat ion/In te rp re ta t ion Of Provisions Of The
Policies
GOU shall have all powers to amend/ relax/ interpret provisions under the policy.
1 1. Applicabil i ty
This Policy would become effective from the date of its notification in the official Gazette of
GOU.
17
Appendix
CONSTITUTION OF EMPOWERED COMMITTEE
Composition of Empowered Committee:
The Empowered Committee of Administrative Secretaries for according approvals/
clearances is constituted as under:
1. Chief Secretary, Government of Uttarakhand –Chairman
2.
Additional Chief Secretary, GOU
–Vice Chairman
3.
Principal Secretary/ Secretary, Dept. of Energy, GOU
–Member
4.
Principal Secretary/ Secretary, Dept. of Finance, GOU
–Member
5.
Principal Secretary/ Secretary, Dept. of Irrigation, GOU
–Member
6.
Principal Secretary/ Secretary, Dept. of Forest, GOU
–Member
7.
Principal Secretary/ Secretary, Dept. of Industry, GOU
–Member
8.
CMD/MD, Uttarakhand Power Corporation Limited.
–Member
9.
CMD/MD, Uttarakhand Jal Vidhyut Nigam Limited.
– Member
10.
CMD/MD, PTCUL
–Member
11.
Vice President, UIPC
– Member
12.
Director, UREDA
– Convener
The Committee may co-opt other Secretaries/State Government officials and experts as and when required.
18
UTTARAKHAND ELECTRICITY SYSTEM CHARACTERISTICS INTRODUCTION
Power Transmission Corporation of Uttarakhand Limited (PTCUL) is a Govt. of Uttarakhand
Enterprise and a Govt. Company as defined under section 617 of the companies Act, 1956. PTCUL
was incorporated under the Companies Act, 1956 on 27th May 2004 with the basic objective of
acquire establish construct and operate extra high voltage, high voltage medium voltage and low
voltage lines and associated sub-stations equipment apparatus, cable and wires and co-ordination of
Transmission facilities for the state of Uttarakhand.
PTCUL is the State Power Transmission Utility (STU) responsible for building, operating and
maintaining Transmission Substations and Lines at Extra High Voltages (EHV) of 132 KV, 220 KV,
400 KV & above. It was carved out of UPCL in June 2004 as a part of Power Sector Reforms
process. PTCUL is also responsible for Load Despatch and Energy Management functions in the
State through Load Despatch Centres (LDCs).As Corporate entity, PTCUL aims to implement best
practices of Project Implementation and Operations & Maintenance Management to ensure
efficiency, reliability and commercial viability of Power Transmission System in the State. It
endeavours to be among the best Transmission Utilities in the Country in these parameters within
three years.
FUTURE GROWTH PLANS
UTTARAKHAND INTEGRATED TRANSMISSION PROJECT (WITH ADB FUNDING)
Government of Uttarakhand has entered into MoUs with Central Generating Cos. (NHPC, NTPC &
others), State Generating Co. (UJVNL) and Private Generating Cos. (GMR, GVK, Reliance &
others) for development of Hydropower upto a total capacity of 6000 MWs (till 2010-11) in
Yamuna, Bhagirathi, Alaknanda and Sharda river basins.
In order to evacuate such huge quantum of power from the upper reaches to suitable pooling points
within the State in an systematic manner an Integrated Transmission Project is planned to be
executed by PTCUL coinciding with completion of the Hydro projects. The Project involving a huge
transmission network of 400 KV & 220 KV Substations and Transmission Lines (Details under
Annexure) is developed with the twin objectives in view-optimal power carriage with the least
corridor and forest invasion.
Being a unique model in the Country involving issues of intra-state and inter-state transmission
systems, MoP, NRPC and CEA have approved these projects to be executed by the STU namely
PTCUL.
The Project involving an estimated outlay of Rs. 2446 Crores is being debt-funded (70%) by Asian
Development Bank with the balance (30%) being equity-funded by the State.
19
UTTARAKHAND POWER CORPORATION LTD.
Compliance Status Of The Directions Issued By Hon’ble Commission In Its
Tariff Order Dated 18-03-2008
1. Misuse of electricity by staff:
UPCL in first phase has completed the metering of all departmental employees and has taken steps
to evolve a policy for supply of electricity to departmental employees and recovery of electricity
charges form them. The said policy is expected to be finalized by the end of September, 2009.
2. Disconnection Notice and unexpected Demand Raised:
UPCL in first phase has started the billing of all high value consumers having load above 25 KW
covered under Rate Schedule RTS-2 & 7 centrally at Corporate Office, which is targeted for all the 3
phase consumers by the end of FY 2009-10. Billing being centralized at Corporate Office the
chances of raising of unexpected demand to consumers are minimized and disconnection notices are
served only in the default cases.
3. Consumer Servicing:
UPCL has taken the following steps to improve the services provided to the consumers:
(i) Billing of all high value
consumers having load
above 25 KW covered
under Rate Schedule RTS-
2 & 7 has been started at
Corporate Office which is
to be extended for all 3
phase consumers by the
end of FY 2009-10.
(ii) A Corporate Level
Dispute Settlement
Committee has been
constituted at Corporate
Office to settle the
disputed cases out of Court.
(iii) A Corporate Billing MIS Software has been developed for analysis of billing data.
With the help of this software, NA / IDF / RDF / ADF cases are identified and
corrective action are taken accordingly.
(iv) A project for Automatic Meter Reading and data logging of Distribution
Transformers and Feeders is being taken up for high value consumers. The
implementation of AMR and IEMS in respect of consumers having load above 75
KW is expected to be completed by September, 2009.
3038.8
3482.12
3826.04
4304.13
4882.47
5530.33
6732.05
7631
0
1000
2000
3000
4000
5000
6000
7000
8000
Energy
GWh
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Input Energy (GWh)
Input Energy(GWh)
20
(v) UPCL has constituted
Forums for Redressal of
Grievances of Consumers
separately for Garhwal
Zone and Kumaon Zone
under the provisions of the
Electricity Act, 2003.
These Forums are
functioning effectively.
(vi) UPCL is following the
Standards of Performance
in its working as laid
down by Hon’ble
Commission through
Regulations. Monthly report on the same is being regularly submitted to Hon’ble
Commission.
(vii) UPCL is perusing with the department of post to extend the facility of deposit of
electricity bills in all the post offices of the State of Uttarakhand.
(viii) UPCL has deployed additional manpower 798 Nos. for meter reading and bill
distribution work and 369 Nos. for disconnection and other commercial work for
giving better services to the consumers.
(ix) Functioning of Bijli Suvidha Kendra in each division is expected to be started by the
end of September, 2009.
4. Sales forecast, Energy Losses and Power Purchase Requirement:
The details / status of action taken in the matter are as follows:
(i) Efficiency Improvement
UPCL realises the importance of
improving efficiency in its
operations and is committed to
implement a number of technical
and commercial measures in this
direction in FY10. The objectives
of efficiency improvement
program would be to put together
a reliable Distribution System and
enhance quality of supply of
electricity to the State consumers
as well as reducing the overall
technical and commercial losses
of the Corporation within a
period of 2-3 years.
2229.09
2465.32
2696.44
3156.58
3497.2
3885.92
4736.1
5494
0
1000
2000
3000
4000
5000
6000
Energy
(GWh)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Billed Energy(GWh)
Billed Energy(GWh)
55.18
53.91
47.02
62.69 65
.23
61.8
62.88
68.49
0
10
20
30
40
50
60
70
Overall
Eff. (%)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Overall Efficiency(%)
Overall Efficiency(%)
21
(ii) Distribution System Improvement
� Construction of Ring
Mains in towns to
improve reliability in
supply.
� Converting single phase
lines to three phase lines.
� High Voltage
Distribution System
(HVDS) to improve
quality of supply.
� Strengthening the
capacity in the
Distribution System to
be compatible for five
years’ load growth.
� Distribution Automation - it is envisaged that all 33 KV and 11 KV feeders shall be
automated through a Distribution SCADA System (in phases) to monitor automatically
the operation of the feeders for overloading, tripping and low frequency.
� Data Logging - this is aimed at compilation of all technical data in respect of the
Distribution System connected to a 33/11 KV sub-station, including the number and
durations of tripping, meter readings of all distribution transformers and feeders
connected to the sub-stations.
(a) Energy Accounting / Audit:
� Metering of consumers
has been completed by
98%.
� All the 33 KV / 11 KV feeders have been
metered and metering of
Distribution
Transformers is in
progress.
� Consumer Indexing and
Geographical
Information System
(GIS) Mapping have
been completed in Roorkee and Dehradun Circles and is in progress in Rudrapur
Circle.
� Meter-reading of the 33 KV Feeder meters are being taken manually and losses at 33
KV feeders / voltage shall be assessed regularly for analysis.
26.65
29.2 29
.52
26.66
28.37
29.73
29.65
26.8
25
25.5
26
26.5
27
27.5
28
28.5
29
29.5
30
Losses
(%)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Distribution Losses(%)
Distribution Losses(%)
44.82
46.09
52.98
37.31
34.78 38
.2
37.12
33.37
0
10
20
30
40
50
60
Losses
(%)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - AT & C Losses(%)
AT & C Losses(%)
22
(b) Segregation of Agricultural Feeders:
� 95 Agricultural
Feeders have been
identified and are
envisaged to be
segregated from
Rural Feeders,
largely in Roorkee
& Rudrapur Circles
and work is under
progress as per
budget provision.
(c) Automatic Meter-reading:
� A project for automatic meter-
reading and data-
logging of
Distribution
Transformers and
Feeders is being
taken up for high
value consumers in
line with the
directions of
Hon’ble
Commission.
(d) Prepaid / Smart Meters: � A Pilot Project for installation of pre-paid / smart meters (1000 Nos.) in Dehradun is
envisaged for
implementation. The
use of pre-paid
meters will improve
billing and
collection efficiency
and will ensure
consumer
satisfaction by
avoiding security
deposit, bill
payment, etc. and
reduction of AT&C
Losses.
658.58
710.94 84
6.82
846.43 94
7.38 10
181285.77
1789
0
200
400
600
800
1000
1200
1400
1600
1800
Revenue
(INR Cr)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Billed Revenue(INR Cr)
Billed Revenue(INR Cr)
495.45
541.37
565.02 72
3.58 86
2.64
895.35
1149.2
1656
0
200
400
600
800
1000
1200
1400
1600
1800
Revenue
(INR Cr.)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Revenue Collection(INR Cr)
Revenue Collection(INR Cr)
1.63
1.55
1.48
1.68 1.
77
1.62 1.
71
2.17
0
0.5
1
1.5
2
2.5
Collection
(Rs./Unit)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Revenue Collection(Rs./Unit)
Revenue Collection(Rs./Unit)
23
(e) Control of Energy Theft: � In order to curb theft
of energy, the
following measures
are taken up by
UPCL:
(a) LT Conductors
are being
replaced by
AB (Aerial
Bunch)
Conductor in
theft areas.
(b) Vigilance
Raids are
being
conducted and cases are being registered U/s 126 and 135 of Electricity Act.,
2003.
(c) All new LT extensions for PTW consumers are envisaged through HV
Distribution System / AB Conductors.
(f) Billing System: � Personnel have been
deployed from
UPNL and through
job contract from
qualified Self Help
Groups (SHGs) in 18
Distribution
Divisions for meter
reading and bill
distribution work.
� The work of meter
reading and bill
distribution in 12 hill
divisions is in
process of finalizing SHGs groups through competitive bidding. This will reduce
NA/NR cases in meter reading.
� Defective meters in domestic and commercial categories existed as on 31-03-2008
were targeted to be replaced on priority basis.
(g) Centralised Computerized Billing:
� The centralized computerized billing at Head Quarter has been completed for all
categories of consumers above 25 KW. HT/LT consumers (3,717 Nos.) of RTS-2 &
RTS-7 are being billed successfully since last seven months.
� The feeding of master data of remaining consumers of other categories is in progress.
(h) MRI Analysis: MRI of all consumers above 25 KW is being done on monthly
basis. Analysis of MRIs of only suspected consumers is being done at HQ level.
75.23
76.15
66.72
85.49 91
.06
87.95
89.38 93
0
10
20
30
40
50
60
70
80
90
100
Collection
Eff. (%)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Collection Efficiency(%)
Collection Efficiency(%)
73.35
70.8
70.48
73.34
71.63
70.27
70.35
73.2
68.5
69
69.5
70
70.5
71
71.5
72
72.5
73
73.5
Billing
Eff. (%)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Billing Efficiency(%)
Billing Efficiency(%)
24
� 100% analysis of all MRIs and revenue assurance audit of all High Value Consumer
bills at Centrialised Billing Center is planned to be started from July, 2009.
(i) Other Efficiency Improvement Measures:
� Periodical testing of meters have been started.
� Implementation of Best Practices in Meter-reading, Bill Generation / Distribution and
Collection.
A Pilot Project for overall Revenue Improvement Action Plan is under implementation in
Dehradun (Urban) Circle.
5. LT Consumers:
UPCL has taken steps to computerize all the bills of all categories of consumers as per
directions of Hon’ble Commission. Tendering process has been started and after finalization
of the same, the work will be awarded to the qualified firm (s).
6. Low Load Factor / Fixed Charges and Minimum charges:
As per direction of Hon’ble Commission testing of meters of LT consumers in non-domestic
and industrial categories was started by UPCL and testing report was submitted to Hon’ble
Commission vide UPCL’s letter No.-196/UPCL/ Com/UERC, dated 20-01-2009. The testing
of HT consumers has also been started.
7. Domestic Category: The target of release of
new connections under
RGGVY scheme is
1,80,684 connections to
domestic category as
against this 1,41,256
connections have been
released for the year upto
2008-09. The remaining
connections i.e. 39,428
(1,80,684 – 1,41,256) are
targeted to be released in
FY 2009-10.
8. Mounting Arrears:
UPCL has taken steps to
recover arrears from consumers through disconnection, issue of notices under the provisions
of the Uttar Pradesh Government Electrical Undertakings (Dues Recovery) Act, 1958 and by
perusing the cases pending with various Courts of Law. A Corporate Level Settlement
Committee has also been constituted to settle the dispute out of Court.
9. Provision for Bad & Doubtful Debts:
Policy and guidelines for writing of bad debts and provisioning for bad and doubtful debts
have been approved by Board of Directors of UPCL, which were submitted to Hon’ble
Commission vide UPCL’s letter No.-1657/UPCL/UERC /B-5/DF, dated 15-03-2008. UPCL
has taken steps to evolve a detailed procedure to implement these policies and guidelines,
which is expected to be finalized by the end of June, 2009.
10. Treatment of Interest during Construction (IDC):UPCL is in process to award the work
of framing a policy on treatment of interest during construction period and allocation of IDC
354.71 39
9.65 43
1.82 47
7.91 53
2.97
594.62
713.14
797
0
100
200
300
400
500
600
700
800
Consumption
(KWh)
2001-02
2002-03
2003-04
2004-05
2005-05
2006-07
2007-08
2008-09
Years
Performance - Annual Per Capita Consumption(KWh)
Annual Per Capita Consumption(KWh)
25
to CWIP and finally to fixed assets. The said work will be got done by the end of September,
2009.
11. O&M Expenses:
In this connection, it is submitted that the additional manpower has been deployed by UPCL
to improve the consumer services like meter reading, bill distribution and disconnection of
defaulting consumers and the expenses incurred on this account is shown under the head
A&G expenses. Moreover, UPCL is required to pay the increase salary to its employees as
per the recommendation of 6th Pay Commission and orders of GoU. Thus, UPCL has not
incurred any additional expenditure on this account.
12. kVAh Based Tariff for Non Domestic and LT Industry Categories:
Meters are being installed on the connections of non-domestic and LT categories having data
on which kVAh based tariff may be done. Such meters have been installed on all the
connections having load above 25 KW and on the remaining consumers such metering shall
be completed by the end of September, 2009.
13. Basis of Fixed Charges for LT Industries and Non-Domestic Consumers:
As per direction of Hon’ble Commission the contracted load of all the LT consumers have
been converted in KW by using the conversion factor as specified by the Hon’ble
Commission. The data of maximum demand is also being maintained in KW and KVA in
respect of all the consumers having load above 25 KW.
14. Re-determination of Tariff for Railway Traction:
The re-determined Tariff of Railway Traction has been implemented by UPCL vide O.M.
No.-1182/UPCL/UERC/F-77, dated 17-05-2008.
15. Accounting of Revenue from Minimum Consumption Guarantee:
Monthly account of deferential amount between minimum consumption guarantee revenue
and revenue from energy charges is being maintained by UPCL and has already been
submitted to Hon’ble Commission vide UPCL’s letter No.-80/UPCL/RM/B-6, dated 15-04-
2009.
16. Fixed Assets Register:
The work of preparation of Fixed Assets Register has been awarded to a Chartered
Accountants Firm and the work is in progress.
17. Employee Cost:
A copy of report of study conducted by National Productivity Council is enclosed herewith
for kind perusal of Hon’ble Commission.
18. Theft of electricity:
In order to curb theft of energy, the following measures are taken up by UPCL:
(i) LT Conductors are being replaced by AB (Aerial Bunch) Conductor in theft areas.
(ii) Vigilance Raids are being conducted and cases are being registered U/s 126 and 135
of Electricity Act., 2003.
(iii) All new LT extensions for PTW consumers are envisaged through HV Distribution
System / AB Conductors
19. Implementation of Tariff approved by Hon’ble Commission vide order dated 18-03-
2008:
The Tariff as approved by Hon’ble Commission for FY 2007-08 & 2008-09 has been
implemented by UPCL as per provisions of the Electricity Act, 2003 and Regulations made
there under.
26
UTTARAKHAND BIO-FUEL BOARD (UBFB)
Bio-fuel is the need of the Nation and Uttarakhand State is rightly contributing to release pressure on
traditional source of energy through its different programmes, promoting non-conventional sources
of fuel in the State.
The Bio-fuel Species Plantation is pioneer and unique programme that
Government of Uttarakhand has initiated, with the view to produce Bio-
diesel through promotion of Jatropha Curcas in degraded and wastelands,
considered one of the most suitable species for Bio-diesel. The plantation
of Jatropha Curcas in degraded and wasteland shall provide employment
to poor and marginalized section specially families Below Poverty Line
(BPL), SC and ST category. It shall also help in soil conservation and
treatment of landslides area in hills, simultaneously enhance the green
patches in the State.
The Bio- Fuel Species Plantation programme was launched
in 2004, by inviting EOI for an area of about 2,00,000
hectares waste land of the State.
Tri-partite Agreement………..
A tripartite agreement was signed on 16th June 2004 in presence of Hon’ble Chief Minister of
Uttarakhand amongst
Govt. of Uttarakhand through Forest Department
Uttarakhand Van Vikash Nigam
Uttaranchal Bio- Fuel Ltd.
As per the tripartite agreement Uttarakhand Bio-Fuel Ltd. is under a
process of establishing a plant that would produce 50 MT / day of bio-
diesel by tranesterification process in the initial stage. The plant is being
established in Amanatgarh near Biharigarh, construction is over and
commercial production will be started as soon. It is proposed to enhance
the Capacity of the plant two 600 MT/ day in due course.
27
ACTIVITIES BEING CARRIED OUT BY UREDA UNDER
ENERGY CONSERVATION PROGRAMMES
Preparation of a comprehensive status report on Compliance/Non Compliance of
Designated Consumers notified/to be notified by the BEE/ SDA in the State of
Uttarakhand.
Preparation of a comprehensive status report on availability of all notified equipments by
the BEE in the State of Uttarakhand.
Preparation of a detailed list of energy audits firms having the specific specialization in
various industry sectors.
Detailed survey of buildings in Uttarakhand, which fall under the Energy Conservation Act
and preparation of a list of commercial buildings with their load, annual energy
consumption etc. for declaration as designated consumers in the State of Uttarakhand.
Preparation of draft documents for various State Level Policies/Regulations, concerning
energy conservation and energy efficiency suitable for the state of Uttarakhand.
Preparation of detailed report on State Level Energy Conservation Awards including
selection of different sectors, selection criteria, evaluation methodology and constitution of
State Level Energy Conservation Awards.
To provide the training to Designated Consumer personals on E-data filling and analysis of
energy data on the format designed by BEE.
Preparation of an evaluation study report on the Impact of EC Act, 2001 in the State of
Uttarakhand. This study should include the initiative taken by the Govt., Energy Utilities,
SDA, Designated Consumer and Notified Building Consumers.
Preparation of annual year book of Energy Conservation Measures taken by the SDA, State
Govt. and other stakeholders of the State of Uttarakhand.
Preparation of an evaluation study report on the demo project (3 Nos.) and prepare a plan
for dissemination of the demo project in the other part of the State.
28
DEMO PROJECT BEING CARRIED OUT IN UTTARAKHAND
Installation of 80 Nos. LED based Energy Efficient Street Lights at Chakrata Road by Nagar
Nigam, Dehradun. 75 % funds provided by BEE & 25 % by Nagar Nigam. Cost of project is
86.45 lakh.
Installation of 415 Energy Efficient Street Lighting Systems at Lal Bahadur Shastri
Academy Mussoorie. 100% funds being provided by BEE i.e. 32.185 lakh.
Revamping/replacement of Drinking Water Pumps, Gharwal Jal Sansthan at Rajpur Road,
Dehradun. Estimated cost is 20 lakh being provided by BEE.
BEE sponsored study for assessment of energy consumption & energy conservation potential
by NPC, Kanpur in 03 SME cluster, industries
03 high energy consuming agricultural pump sets 11 kv feeders.
03 No high energy consuming water works feeders.
03 No building complex of above 500 kva connected load.
EVENTS ORGANIZED BY UREDA FOR PROMOTION & AWARENESS OF ENERGY CONSERVATION
Organized district level & state level painting competition for awareness of energy
conservation among school children’s.
Distributed Energy Conservation Guide Book prepared by UREDA in Uttarakhand schools
and Educational Institutes.
UREDA is planning to prepare and introduce comprehensive course on Energy Conservation
for school level education.
Organized district level & state level energy conservation day on 14 Dec 2008 in all dist. of
Uttarakhand.
Organized workshop on “Energy Conservation in Industrial Units & use of Alternate
Energy” at Haridwar SIDCUL Industrial Estate on 18 Feb 2009.
Organized workshop on “Energy Conservation in Industrial Units & Use of Alternate
Energy” at Udham Singh Nagar on 20 March 2009.
29
PUBLICITY & AWARENESS ACTIVITIES
• 200 State transport buses has been painted with energy conservation slogans for publicity.
• 10 hoardings has been installed for energy conservation promotion.
• 1.5 lakh stickers are being distributed for use of CFL & conservation of electricity measures.
• Various other publicity campaign are proposed for energy conservation awareness.
Letter to every Village Panchayat/Pradhan has been sent for replacement of non-
efficient bulbs with highly energy efficient CFL.
30
Energy Efficient Tube Lights and CFL Distribution At Subsidized Rates
� Fitment of CFL and EE Tube lights in Govt. Departments at subsidized rates of various firms as
per tender by UREDA.
Ref: Letter of Chief Project Officer No. – 102 / UREDA / CFL / T-5 / 08-09, dated – 16
th April’2009.
31
CFL Promotional Programme Organize by UREDA
UREDA has promoted CFL fitment programme “ Save Energy – Generate Energy” a massive drive
to replace the conventional bulbs with the energy efficient lamps in Pithoragarh Dist. Along with
distribution of Energy Conservation tips.
Ref :- Letter of DM, Pithoragarh no.- 404/UREDA/CFL date. 24/09/2004
32
33
Energy Conservation Activity, Programme, Workshop, Seminar, Demonstration
& Street Play Organize by UREDA in different dist. Of Uttarakhand.
34
Uttarakhand Energy Conservation Award
The State has Started Energy Conservation Award in Following Categories in the Year 2009 – Large
and Medium Scale Industry, Small Scale , Commercial Buildings , Hotels and Hospitals , Office
Buildings and Educational Institutes , NGO , Energy Auditors and Energy Managers .
Ref:- Letter of Ad. Secretary GOU no. – 1334/I/2009-10(3)/17/2005
35
36
UREDA ON THE TRACK FOR IMPLEMENTATION OF ECBC
UREDA as a SDA is implementing energy conservation programme in Uttarakhand. UREDA has
engaged consultants architect for preparing the guidelines with respect the ECBC code of BEE. The
implementation of ECBC in state will be soon.
37
LIST OF BEE CERTIFIED ENERGY AUDITOR & ENERGY MANAGER IN UTTARAKHAND
Sr. No. Name of EA/EM BEE Reg. No. E-Mail ID
1 Mr. Ashish Vashishth EA-0140 [email protected]
2 Mr. Ram Krishna Sharma EA-0757 [email protected]
3 Mr. M N Khosla EA-2024 [email protected]
4 Mr. Gordhan Ram Choudhary EA-3590 [email protected]
5 Mr. Sanjay Kumar Tiwari EA-3676 [email protected]
6 Mr. Shayam Lal Goyal EM-0716 [email protected]
7 Mr. Girish Chandra EA-3854 vidyutnirikshah@vidyutsuraksha-
Uttarakhand.com
8 Mr. Nagendra Singh EM-0753 ––
9 Mr. Amrish Kumar Midha EA-0572 ––
10 Mr. Mukesh Kumar EA-0607 [email protected]
11 Mr. Rajan Vohra EA-0810 [email protected]
12 Mr. Rajendra Kumar Daga EA-1729 [email protected]
13 Mr. Sudhir Kumar Srivastav EA-3250 [email protected]
14 Mr. Surendra Kumar Sharma EA-4133 ––
15 Mr. Bhupender Singh Kaneri EA-4840 ––
16 Mr. Ajeet Kumar Sharma EA-5351 ––
17 Mr. Srinivasa Rao Modalavalasa EA-5755 ––
18 Mr. Akhlaq Rasool Siddiqui EM-1176 ––
19 Mr. Kamal Bansal EA-2318 ––
20 Mr. Ajay Bist EA-4167 ––
STANDARDS AND LABELING PROGRAMME
The Energy Efficiency Standards and Labeling programme is a key thrust Area of BEE under the
Energy Conservation Act, The objectives of this program is to provide the consumer an informed
choice about the energy saving, and thereby the cost saving potential of the marketed household and
other equipment.
Name of Few Manufactures and Authorized Dealer/ Distributors of BEE Notified
Equipments in Uttarakhand
ACE Enterprises, Dehradun Bhagwati Gas Employers, Rudrapur
Composite Engineers, Haridwar Lightex, DehraDun
Composite Engineers, DehraDun Bobby Electronics, Rishikesh
Amit Associates, DehraDun Kumaon Electronics, Haldwani
Sniles Stores, Dehradun OM’s Digital Shop, Mussoorie
Himalay Engineering Corporation, Dehradun Pal Electrical and Refrigeration, Rishikesh
Vikas Engineering Company, Haldwani Jindal Enterprises, Roorkee
Sanchem Engineers Pvt. Ltd, DehraDun J.N. Electricals, Haldwani
A.V. Enterprises, Rishikesh Kumar Electricals, Kotdwar
Aggarwal Gas Agency, Haldwani Singh Electric Company, Dehradun
38
DEMAND SIDE MANAGEMENT (DSM)
Entails actions by the utility that influence the quantity or patterns of use of energy consumed by end
users, such as actions targeting reduction of peak demand or reduction of energy consumed during
periods when energy-supply systems are constrained.
While, Peak demand management does not necessarily decrease total energy consumption but
could be expected to reduce the need for investments in networks and/or power plants, the strategic
conservation would lead to reduce energy consumption.
Ref. - UPCL EOI for Customer Management and Services, Revenue Management including AT & C loss reduction,
Complaint Management, O&M of distribution system including sub-station & DSM invitations.
39
INITIATIVE TAKEN BY GOVERNMENT DEPARTMENTS
Bachat Lamp Yojna
An agreement done between Bureau of Energy Efficiency, Uttarakhand Power Corporation ltd. and
M/s Intersuez Advisors Pvt. Ltd. on dated 26th November’2008 for the Uttarakhand efficiency
lighting project (UELP) under Bachat Lamp Yojna under Govt. Of India. The aim of this agreement
is to start the awareness and information campaign for the project in association with UPCL. Reference: letter Director – Finance, UPCL (No. 137/UPCL/Dir (F) / BLY / DF-33) Dated: 07/01/09
40
41
Activity Regarding Energy Conservation
• A Govt. Order for implementation of Energy Conservation and efficiency for all Govt. and
Semi-Govt. Offices and residential buildings .to equipped with Solar Water heating system
and construction of new buildings as per Energy Conservation Building Code.
• Fitment of Energy Efficient Motors along with capacitors at all submersible pumps, tube
wells, canal water lifting pumps
• Fitment of Energy Efficient Lights to save Approx. 40% Electricity through all replaceable
Lightning points.
• Uses of CFL in corridor and outside area of building to save electricity.
• Uses of Solar street lights in all industrial units, commercial units, office and residential
complexes.
• Installation of Bio-gas systems in village areas to save trees and fulfill the requirements of
Energy of Rural areas .
Reference : Letter – Chief Secretary Govt. Of Uttarakhand (Mo. 838 /I/2004-05/100/02 . Dated – 28
thDecember’04.
42
43
Implementation Programme For Energy Conservation In all Govt./ Semi. Govt.
Buildings
• Replacement of CFL and all Energy efficiency tube lights in all Govt., Semi Govt. and
Corporation Buildings.
• Replacement of Energy Efficient Lighting systems when old defective equipments need to be
replaced.
• Advisable to conduct Energy audits for all Govt./ Semi Govt. Buildings for implementation/
modification as per Energy Auditor Report.
• Installation of energy Efficient Street Light system by automatic switching, Timer system to
avoid wastage of electricity in day or in nights by the municipalities. Defense areas are
exempted by this order.
• Installation of Solar water heater in all residential, non-residential buildings.
Reference: Letter – Chief Secretary GOU. No.(87 (R ) / I / 2006 – 05 / 100 / 2002 dated 4 th January ‘2007
44
45
Implementation Of Recommendations under Energy Audit Reports
� Fitment of Sample 36watt. LED street light in campus area.
� Commitment to replace Energy Efficient T-5 Tube lights in Administration Office.
� Fitment of L.E.D Bulb in Tiger Mess building as earliest.
� Replacement of Old A.C Units with Energy efficient star rated A.C within few months.
Reference: Letter of ADGP ,ITBP Dehardun – ITBP/ IV/ 11093 / 1/ construction/209-6156. dated –19th june’09.
46
Implementation Of Recommendations under Energy Audit Reports � Replacement of all non-efficient Tube lights, Fan Regulators with high-energy efficient
lighting system and electronic regulators.
� Replacement of efficient LPG Gas burners with old traditional heaters.
� Improvement in ceiling of Air-Conditioner area and setting of A/C temp. at 25-26OC etc.
Ref:- Letter IIT Roorkee, Director for Implementation of EC recommendation after EA Report
47
State Govt. promotion of Solar Water Heaters
UREDA have installed 186 no. of solar Water Heaters in Uttarakhand of capacity from 40- LPD to
5050 LPD Total capacity 84,050 LPD. For promotion of this State Govt. is giving rebate of Rs. 75/-
pm. in the electricity bill against installation of minimum 100lt. Capacity of Solar Water heater.
Ref. – UPCL Tariff for 2007-2008
48
49
ENERGY AUDIT CONDUCTED BY UREDA IN BUILDINGS OF
UTTARAKHAND
Sr. No. Description of Building Place of Building
1 Hotel Drona Dehradun
2 ONGC Tel Bhawan Dehradun
3 Doon Hospital Dehradun
4 AHEC, IIT Roorkee
5 Water Work Campus Dilaram Bazar , Dehradun
6 Indian Institute of Petroleum Dehradun
7 Bharat Heavy Electrical Limited Haridwar
8 Doiwala Sugar Mill Dehradun
9 IGNFA , Forest Research India Dehradun
10 IIRS Building ,Kalidas Road Dehradun
11 Wadia Institute Building Dehradun
12 Wild Life Institute, Chanderbani Dehradun
13 RIMC Building Cantt. Dehradun
14 IRDE Building , Raipur Road Dehradun
15 Opto Electronics Factory Building, Raipur Road Dehradun
16 Ordinance Factory, Raipur Road Dehradun
17 ATI, Nainital Nainital
18 UJJWAL Bhawan Dehradun
19 ITBP Building, Seemadwar Dehradun
20
Administrative Building at Srinagar and Life
Science Block at Chaurash, HNB Garhwal
University, Pauri Garhwal
Srinagar
50
21 Cantonment Board Office of Cantt, Dehradun Dehradun
22
Triveni Guest House of Tehri Hydro
Development Corporation Ltd, Pragati Puram,
Rishikesh Distt., Dehradun
Dehradun
23
Administration Building and 350 bedded Boys
hostel of GB Pant Engineering College,
Ghuddaudi Pauri Garhwal
Pauri Garhwal
24
Administrative Building Library cum
Auditorium Building, Biotechnology &
Molecular Biology Laboratory, Plant Pathology
Laboratory, Bosisen Field Laboratory at
Vikekanand Parvatiya Krishi Anusandhan
Susthan, Hawalbagh, Almora
Almora
25
Main Building and Annexe building of Director,
Uttarakahand Secondary Education Board, Ram
Nagar, Nainital
Nainital
26
Main building , Workshop, Cultural Hall, Hostel
and Residental building of Industrial Training
Institute (ITI), Niranjanpur, Majra, Dehradun
Dehradun
27 Administrative Block and Officer Mess of ITBP
Academy, Mussoorie Mussoorie
28
Forest Training Insititute, Haldwani and
Research Campus, Haldwani office all
buildings
Haldwani
29 Office of the Director General, Health Services
Chander Nagar, Dehradun Dehradun
30 Office of the Principal Govt. Polytechnic,
Suddhowala, Dehradun Dehradun
31
Office and hospital ward of Sushila Tiwari
Hospital & Medical College, Rampur Road,
Haldwani
Haldwani
32 Administrative Block and Hostel of Engineering
College, Dwarahat, Almora Almora
33 Office Buildings of the High Court, Nainital
Nainital
34 GB Pant Agriculture University, Pant Nagar, US
Nagar Udham Singh Nagar
35 Bharat Sanachar Nagar Limited, Patel Nagar Dehradun
36 Sachiwalya Dehradun
37 Vidhan Sabha Dehradun
51
LIST OF PROPOSED DESIGNATED ENERGY CONSUMER OF
COMMERCIAL BUILDINGS IN UTTARAKHAND
S.No. Name & Addresses of Buildings District Connected
Load
Avg.Monthly Cons. (Unit)
Avg Bill Amt (Rs.)
1 IIRS, KALIDAS ROAD DEHRADUN 920 93951 365667
2 O.N.G.C., TEL BHAWAN , ONGC OFFICE DEHRADUN 1488 378200 1188792
3 ADM. OFFICER, G.B. PANT HIMALYA , KATARMAL, KOSI
ALMORA 1000 49996 200538
4 G.M IDPL , VEERBAHDRA RISHIKESH 2853 463311 3110605
5 SUPRITENDENT S.P.S HOSPITAL , DEHRADUN ROAD
RISHIKESH 550 18900 275989
6 M/S HIMALAYAN HOSPITAL TRUST DEHRADUN 638 268197 887349
7 D.R.M. NORTHEN RAILWAY , RAILWAY STATION DEHRADUN 600 48787 174742
8 DIRECTOR, WILDLIFE INSTITUTE , CHANDRABANI DEHRADUN 840 89772 326803
9 DIRECTOR , EXPERIMENTAL LAB, F.R.I. DEHRADUN 800 166915 637751
10 DIRECTOR, KDMIPE ,9 KAULAGARH ROAD DEHRADUN 3145 841631 3089123
11 HOTEL GRACE MOUNT , LIBERARY ROAD MUSSOORIE 500 44728 192562
12 GM , ORDANCE FACTORY. , RAIPUR DEHRADUN 1369 235672 862126
13 DIRECTOR LIBSNAA , STEPLTON MUSSOORIE 723 48065 272778
14 INDIAN HOTEL , NARENDRA NAGAR TEHRI GARHWAL 876 217915 873113
15 REGISTRAR , HNB GARHWAL UNIVERSITY , CHAURAAS CAMPUS
TEHRI GARHWAL 850 59419 322636
16 G.E.M.E.S FOR N H O , RAJPUR ROAD DEHRADUN 1000 90352 331230
17 DIRECTOR. C.B.R.I ROORKEE 850 152619 669078
18 ADMIN. OFFICER , IIP , MOHKAMPUR DEHRADUN 1003 154992 559694
19 GARISON ENGINEER(I,R&D) , RAIPUR RD. DEHRADUN 3400 483633 1728179
20 GENERAL MANAGER , RAIPUR DEHRADUN 5100 1109077 3035945
21 S.E.,ELECT.,ONGC HOSPITAL , KAULAGARH ROAD DEHRADUN 842 136765 443439
22 PRINCIPAL , G.B. PANTH ENGG. COLLEGE , GHURDORI (1
ST CONNECTION)
PAURI GARHWAL 800 95524 373341
23 SACHIVE , RAMPUR ROAD , P.O. HALDWANI NAINITAL 800 108512 420720
24 GENERAL MANAGER , MANNU MAHARANI , HOTELS LTD MALLITAL
NAINITAL 504 111691 402034
25 DIRECTOR GENREAL, F.S.I. , KAULAGARH ROAD DEHRADUN 540 71451 258374
26 DISTRICT HOSPITAL , NAINITAL ROAD RUDRAPUR 500 41985 1212629
27 CHIEF MEDICAL SUPERINTENDENT , HNB BASE HOSPITAL , MEDICAL COLLEGE
SRINAGAR GARHWAL.
500 27736 111224
28 PRINCIPAL , G.B. PANTH ENGINEERING , COLLEGE GHURDORI (2
ND CONNECTION)
PAURI 691 125981 607452
29 EXECUTIVE ENGINEER , UTTARAKHAND JAL SANSTHAN ,
PAURI (GARHWAL)
895 595454 17194594
30 EXECUTIVE ENGINEER ,HINDOLAKHAL PUMP-1, UTTARAKHAND PAYJAL NIGAM ,
768 244049 154926132
31 DISTRICT HOSPITAL , NAINITAL ROAD RUDRAPUR 500 41985 1212629
32 GE (I) R&D, MES , ANARWALA DEHRADUN 1360 7992 49105
33 REGISTRAR , I.I.T ROORKEE 7297.25 1444463 3720615
52
PROGRAM ORGANIZED BY UREDA ON ENERGY CONSERVATION DAY
DATED 14TH DECEMBER 2008 CO-SPONSERED ONGC & ITGI
WORKSHOP ORGANIZED BY UREDA AT SIDCUL HARIDWAR ON DT.
18TH FEB 2009 CO-SPONSRED BEE & HRD IND. ASSOCIATION
53
WORKSHOP ORGANIZED BY UREDA AT UDHAM SINGH NAGAR ON DT.
20TH MAR 2009 CO-SPONSRED BEE & IND. ASSOC. OF UK
E-LEARNING TRAINING PROGRAMES ORGANIZED BY UREDA
ON DT. 18TH JUNE 2009 THROUGH PCRA
54
REGIONAL MEET/CONFERENCE FOR SDAs, ESCOs, EAs, INDUSTRIES,
GOVT. & SEMI GOVT. ORGANIZATION ON 20TH JUNE 2009
THROUGH UPES, D.DUN SPONSERED BY UREDA, BEE
55
ENERGY SAVING HOARDING DISPLAY AT VARIOUS POINT IN CITY
PAINTING COMPETITION ORGANIZED BY UREDA FOR SCHOOLS OF
UTTARAKHAND
56
ENERGY CONSERVATION SLOGENS DISPLAYED 200 STATE
TRANSPORT BUSES
57
STICKER DISPLAY IN OFFICES AND SCHOOLS
58
DISTRIBUTION OF EC GUIDE BOOK IN UTTARAKHAND SCHOOLS
59
NEWSPAPER ADVERTISMENTS
Awareness Advertisement published by
UREDA on 15th August 09 on the Occasion
of “Independent Day” Celebration in the
following Newspapers:-
Amar Ujala
Dainik Jagaran
Hindustan
Rashtriya Saharan
Uttar Ujala
Shaha Times
The Himachal Times
Awareness Advertisement published by
UREDA on 20th August 09 on the Occasion
of “Rajeev Gandhi Akshya Urja Divash”
in the following Newspapers:-
Himvani Magazine
Him Pushpa Magazine
Jan-Jan Tak
Ghughati Samachar Patrika
Uttaranchal Sakshya
I-Next
60
VOICE OF UTTARAKHAND
Conservation of energy is of paramount importance today as our resources
are being depleted at an alarmingly rapid rate . As a teacher , I encourage
my students to adopt all possible means to save energy like using CFL’s
instead of bulbs and tube lights , using star rated appliances and following
the common habits like switching off the and watching TV only for one’s
favorites programmes , etc. All these have made a remarkable difference
to the electricity bills of the school as well as the student’s parents
K.K. Sharma
Senior Coordinator
Summer Valley School
Dehradun
Using CFL’s, star rated appliances and solar heaters, solar lights and solar
cookers are some of the steps that I have taken to save energy at my
home and I have seen my electricity bills going down very sharply
Rajeev Jain
Computer Professional
Following the energy saving tips of the BEE has helped me to drastically
reduce my electricity bills. I have reduced the use of ACs and other high-
energy consuming appliances to the minimum and encourage my family
members to save energy in every possible in every possible way.
Abhinav Walia
IAS
It is very important for us to conserve energy today if we are to leave a
better world for our children . If we do not save energy today , our
children will curse us after we have left. At home I switch on electric
appliances only when required , an switch off the TV and music system as
soon as I have seen or heard my favorite programmes.
Mrs. Kavita Sharma
Home Maker
61
As an Advocate I have to frequently use my computer to draft appeals and
responses. I plan my work in such a way that the computer is switched on
for the minimum possible time. Since the courts are not far away from my
residence. I try and walked to work ,thus saving on fuel also.
I recommend these measures to all my friends, relatives and even my
clients.
Adv. Mrs.Manvi Walia
Hon.Distt.Courts Dehradun
As a CRM of an automobile company, I encourage my technical staff to
use the electrical tools to the barest minimum time possible and to switch
off the lights and fans when not required. I also ensure that the engines
off the vehicles brought in for services / repairs are not run
unnecessarily. these measures have resulted in saving energy.
Sanjeev Walia
CRM OBERI MOTORS
DEHRADUN
As a Charted Accountancy article, I am required to use the computer for
long period of time and even go out for audits quite frequently. I try and
minimize the time that the computer is on. I also turn off my vehicle
engine at crossings to save fuel.
Siddhartha Bhardwaj
(CA ARTICLE)
I am an engineering student. To save energy I minimize the use of my
laptop encourage my friends to do the same. We all keep a strict watch on
the consumption of electricity in our hostel as well as in our college
Rahul Bhardwaj
(M.Tech.Student)
62
ACTIVITIES OF UREDA THROUGH MEDIA EYE
63
64
65
66
67
MEDIA COVERAGE
Awareness program organized by UREDA on “Rajeev Gandhi Akshya Urja Divas”
Dated 20th August 2009 at Haridwar.
Awareness program organized by UREDA on “Rajeev Gandhi Akshya Urja
Divas” Dated 20th August 2009 at Pauri.
68
News Paper Advertisement for
Govt. Subsidy Programs on Non-Conventional Energy Equipments
69
70
Conclusion
The relevance of legislation to improve end –use energy efficiency in all sectors of the economy was
realized as an outcome of a national debate on the need for strengthening the energy conservation
movement.
The Energy Conservation Act lays down clear action plans and envisages the establishment of a
specific organization to convert these plans into reality through various regulatory and promotional
interventions
BEE has a mission to institutionalize energy efficiency, set up a delivery mechanism for energy
efficiency services and to provide leadership to implement a nation-wide energy efficiency program.
Similar to BEE activity our state nodal agency UREDA is also taking the necessary action in the
field of Energy Conservation to fill the gap between demand and supply of electricity in the state and
also make it independent in the Energy sector and to save the revenue of State Govt.