Berlin 06. März 2015

Integriertes Wasserressourcen- Management (IWRM) in Zentralasien: Modellregion Mongolei

(MoMo) - Phase III

Wassertechnologien

Dr. Buren ScharawFraunhofer IOSB-ASTAm Vogelherd 50, 98693 Ilmenau, Germany

Telefon: +49 (0) 3677 / 461-121,mailto: [email protected]

Berlin 06. März 2015

Model Region: River Basin Kharaa, City of Darkhan

Kharaa River Basin 

�Kharaa Catchment area ~15.015 km2

�Kharaa flow at Darkhan: MQ ca. 10,5 m3/s

�Catchment Orkhon (~132.835 km2), Catchment Selenge (~280.000 km2), �Baikalsee, Russland

�Population of Darkhan ca. 90.000 

Darkhan

Berlin 06. März 2015

The IWRM-MoMo Project : Past, Present & Future

Kharaa River basin,Urban and rural water management analysis, city of Darkhan and Orkhon SumIdentification of

Testing of measures• Evaluation of proposed measures from MoMo 1 �pilot measures• Methods for multi-disciplinary planning of effective and efficient measures � toolbox model

Implementation of measures• application and optimisation of measures, • evaluation of the IWRM approach.

• existing problems • impacts on population & environment• effective programs of measure.

1

2006

2009

2017

2010

2014

2

3

Pas

tP

rese

ntFu

ture

Berlin 06. März 2015Page 4

IWRM systems approach…

Ground Water

Agriculture

Nat. Land-use

Wastewater

Drinking Water

Atmosphere / Climate

Stagnant Waters

Implementation

Running Waters

Cap

acity

Dev

elop

men

t

System Analysis and Scenarios In

stitu

tiont

iona

l Con

ditio

ns

Berlin 06. März 2015

Air Temperature Change Mongolia

-2

-1

0

1

2

3

4

5

Tem

pera

ture

[°C

]

A2 CNCM3

A2 ECHAM5

A2 IPSL

B1 CNCM3

B1 ECHAM5

B1 IPSL

WFD

Berlin 06. März 2015

Air Temperature Change Mongolia

1971-2000

2071-2100 (B1-CNCM3) 2071-2100 (A2-ECHAM5)

Berlin 06. März 2015

Water Availability Change Mongolia

Water availability [m

m]

Berlin 06. März 2015

Water Availability Change Mongolia

2071‐2100

Berlin 06. März 2015

Overview and Objectives

Implementation of pilot measures based on results of MoMo phase 1

area urban area(city of Darkhan)

suburban area (ger settlements)

rural area(rural settlements)

Problem identification

Phase I

• Data collection, online measures,• Problem identification,• Analyses, • Proposals of optimal solutions

MethodsApproaches

Phase II

• Ground water simulation by MODFLOW

• central water supply with optimal management by HydroDyn,

• central wastewater treatment (reuse of water and nutrients)

• water kiosks & wells for water supply

• decentralized collection of faeces and transport to central wastewater treatment plant

• participative development of measures

• drinking water supply• Decentralized / semi centralized

treatment • WSB-Technology for

decentralized waste water treatment

Pilot measures

Phase II

• location of leakages of the water supply system in Darkhan,

• central wwtp (SBR), pilot plant scale central anaerobic treatment of faeces of ger camps (biogas plant)

• collect and bring system for water supply and faeces („small business“)

• possibly additional pilot measures

• location analysisecotechnical wastewater treatment (PPA)

• Small sewage works / small wwtp(WSB® Technology at Kindergarten in Orkhon Sum

Berlin 06. März 2015

Drinking water extraction in Darkhan city:Ground water monitoring

18 wells of USAG (depth: 60-70m)8 km south of Darkhanbank filtrate~ 9.700 m³/day

8 wells of Thermal Power Plant(depth: 70-80m)~ 8.300 m³/day

13 wells of other industries (brick manufacture, tannery)

USAG wells

TPP wells

Darkhan (~ 80 000)

Berlin 06. März 2015

Drinking water extraction:Monitoring Ground water situation

10 pressure transducers measureground water level continuously

Berlin 06. März 2015

• 3-D finite-difference model

• Open source, published by the U.S. Geological Survey

• Used version: MODFLOW-2005 http://water.usgs.gov

• The 3-D model domain (e.g. aquifer system) is discretized into a

block of grids called cells

• For each cell the hydraulic properties (e.g. conductivity, storativity)

are defined

• Layers correspond to horizontal hydrogeological units

• In each cell there is a point called “node” at which hydraulic head is

calculated

Ground water flow modelling with MODFLOW

Drinking water extraction:Ground water modellig

Berlin 06. März 2015

simulated steady-state water table (hydraulic head) for warm season (April-October)

Drinking water extraction:Ground water simulation results

• represents average flow conditions

• Warm season => - river and soil water not frozen- groundwater recharge (10mm/year)

• GW-flow in alluvial aquifer from Southto North parallel to Kharaa River

draw down in 8 TPP

wells galary is larger

than in 18 USAG

wells galary

TPP wells are further

away from

the Kharaa River

Berlin 06. März 2015

Water balance:

Water flow into the model domain � Kharaa River larges contribution

Water flow out of model domain � pumping wells larges contribution

Kharaa River: important water sourcefor Darkhan

Drinking water extraction:Ground water simulation results

Berlin 06. März 2015

Drinking water extraction:Assessment of ground water quality

Berlin 06. März 2015

Drinking water supply in city of Darkhan

• 18 groundwater wells near the river Kharaa (depth 70m) with ~70.000 m3/d capacity

• 6 tanks

• 225 km network pipes

• ca. 18.000 m3/d demands

• Old and often broken down network infrastructure (pumps, pipes, valves)

• High water losses in the DWSN

• 3 distribution zones (Old Darkhan, New Darkhan and Industry)

• Rehabilitation of distribution network

Berlin 06. März 2015

Drinking Water Supply

• Leak Detection - sensor test installation with GSM communication

• Software Interfaces - data exchange betweensensor SCADA and HydroDyn

• Chemical Backtrace-Contamination source - newmodel for mixing in network nodes implemented(bulk-advective-model)

• Sensor Installation – 10 multiparameter sensorsfor darkhan water network [April-May 2011]

Drinking Water Supply

Berlin 06. März 2015

Water production and water losses in distribution network

Drinking Water Supply:Concept

Berlin 06. März 2015

Water balance in city of Darkhan

Berlin 06. März 2015

300

350

400

450

500

550

9 12 15 18 21 0 3 6 9

[m³/h

]

Time

Daily Demand Profiles Darkhan

Sunday Monday

Tuesday Wednesday

Thursday Friday

Saturday

Indicator for high leak flow

Largest Demand 525m³/h

High nightlydemand 340m³/h

Drinking Water Supply:Leakage

Berlin 06. März 2015

Drinking Water Supply:Installation of sensors

Pin-Pointing of Leakages by Field Measurements

• Workshop with USAG employees in Summer 2012in the Mangit area (Capacity Development)• Training of usage of SebaKMTnoise loggers, correlators andground microphones

Berlin 06. März 2015

small pressure drop

Flow change

Drinking Water Supply:results from leakage detection

Comparing the results between• online measurement-data from sensors and • simulation by HydroDyn

Proposal for rehabilitation of the pipe lines(2013 3 km and 18 km in 2013by local company USAG Darkhan

Reducing the leakages by 5%-7%

Berlin 06. März 2015

Zentrale Abwasserbehandlung (ZKA)

• ZKA-Darkhan wurde 1964 gebaut (51 Jahre)

• Ablaufwerte sind schlecht

• Erfassung der online Messwerte seit 2006 zurÜberwachung der Prozessabläufe

• Entwicklung des Simulationstools der ZKA

• Erd- und Bauarbeiten, Bauüberwachung, Installation und Erprobung einer SBR-Demonstrationsanlage auf der ZKA Darkhan/p2m

• Inbetriebnahme am 10. Sep.2011 durchStaatsekretärin Frau Erdenezezeg / Bau und Infrastruktur Ministerium

Berlin 06. März 2015

Aufgabe in MoMo3 Zentrale Abwasserbehandlung Darkhan

• Fortführung und Erweiterung des Online-Monitoring der Prozesse auf der zentralen Kläranlage Darkhan

• Untersuchung der Abwässer aus Industrien -> Vorklärung von Industriewässern

• Erstellung eines Konzeptes zur Instandsetzung der Abwasserkanalisation mit 3 Pumpstationen (223km)

• Fachliche Begleitung der lokalen Behörden bei Vorbereitung der Ausschreibungsunterlagen für den Bau bzw. Rekonstruktion der Zentralkläranlage in den Städten Darkhan

• Beteiligung bei der Ausschreibung mit der Fa. p2m

• Initiativen für die Übertragung der im IWRM-MoMo Projekt getesteten Technologien

Berlin 06. März 2015

Waste water treatment:the tested SBR Pilot Plant

Task: Construction and operation of an SBR Pilot Plant• Pilot plant site selected at the WWTP

Darkhan

• Planning of the Pilot Plant completed

• Drawings submitted to USAG

• Machinery Parts ordered and packed for transportation to Darkhan

• PLC programming in progress

• Start-up planed in may 2011

• All action in scheduled time and costs as submitted with proposal

Berlin 06. März 2015

Preliminary Design of Large-scale WWTP by SBR-Technology

Berlin 06. März 2015

Small Waste Water Treatment Plant Decentralized Waste Water Management

Pre-treatment - Biological stage - Final clarification

Biological stage with Biofilm Carrier

Working plan04.2011 – 06.2011 - construction work06.2011 - start-up07.2011 – 01.2013 - operating time

Modification• Location adaptation • plant size form 20 to 50 PE

Treatment Plant• for a kindergarten• in Orkhon soum• Capacity 50 PE

Berlin 06. März 2015

Anpassung der Technologie

Vorklärung Biologie –Wirbel- Schwebebettreaktor Nachklärung

Zulauf

Ablauf

Berlin 06. März 2015

Anpassung der Technik

Nachklärung Biologie

Vorklärung und Schlammspeicher

Berlin 06. März 2015

Dezentrale Abwasserbehandlungfür ländliche Gebiete

- Koordination der Umsetzungsmaßnahmen

- Erd- und Bauarbeiten der Demonstrationsanlage am Kindergarten in Orkhon Sum für 50 EWG

- Bauüberwachung,

- Ferngesteuerte Prozessüberwachung,

- Erfolgreiche Umsetzung und Anpassung der WSB-Technologie

- Erfolgreiche Demonstration und Vermarktung

Berlin 06. März 2015

Implementation in Mongolia

1. Төв аймаг,2. Булган аймаг,3. Өвөрхангай аймаг,4. Эрдэнэт,5. Улаанбаатар

Berlin 06. März 2015

Waste Water Treatment Plant with Integrated Wood Production

Objective A Identify an affordable waste water treatment approach that is compatible with the harsh climatic conditions of the Darkhan region.

Objective B Utilise waste water components for local environmental and economic benefit.

M A M J J A S O N D J F M A M J J A S O N D J F M ANo. Task1 Preliminary design2 Design development3 Detailed design4 Tender documents5 Construction documents 6 Preparation for additional trials7 Construction phase 1 (Treatment beds)8 Plant establishment9 Bill of Quantities

10 University contract11 Site selection12 Tender meetings13 Construction phase 2 (Irrigation supply)14 Supporting trials15 Reporting16 Maintenance documentation17 Sampling and monitoring

2011 2012 2013

Distribution system Willow and Poplar trees

Sampling point

Overflow to sewer

Collection pipework

Influent delivery

Location: MUST University

Berlin 06. März 2015

Waste water treatment Ger area: iPiT

intermediatestorage

biogas plant

• iPiT installation in bag 7 in Darkhan

• Installation of biogas planton the CWWTP Darkhan

Berlin 06. März 2015

Capacity Development (2006-2013)

Mongolian Scientists and Stakeholders in Germany

• Project partners and key persons fromMinistries, Kharaa River Basin Council, Water Administration and provincial Gouvernement Darkhan-Uul Aimag, local companies, like USAG and Universities (MUST, NUM)

University and Schools

• Lectures (MUST Darkhan and NUM)

• Mongolian diploma student - cost analyses of a new WWTP, at FhAST-Ilmenau

• Supervision of Ph.D. master/bachelor theses to Mongolian students

• Master Program: Environmental Engineering & Management (EEM)

• Water Fun Programm at schools (UBZ)

• Technical training course for decentralizedwaste water systems (Fraunhofer and UFZ)

Berlin 06. März 2015

Aufgabe in MoMo3 Dezentrale Abwasserbehandlung

• Fernübertragung der Daten und Fernüberwachung der Prozesse aus Deutschland

• Erstellung eines Betreiber-Modells

• Fachliche Begleitung der lokalen Entscheidungsträger bei der Ausschreibung und Umsetzung sowie Übertragung der getesteten WSB-Technologie in weiteren Regionen

• Mitwirkung bei der Vorbereitung von Ausschreibungsunterlagen von 6 Anlagen in Tuv, Bulgan, Uvurkhangai Provinzen in 2015

• Weitere 20 Anlagen werden ausgeschrieben

• Gute Chancen für die Gewinnung der Ausschreibungen Fraunhofer/Fa. Bergmann

Berlin 06. März 2015

Thank you very much – Баярлалаа