58
HIROSE (THAILAND) LTD. MAIN CONTRACTOR SUB CONTRACTOR Soil Protection System Structure Work Architectural Work THE SIAM KEMPINSKI HOTEL

Kempinski revise14

Embed Size (px)

Citation preview

  • HIROSE (THAILAND) LTD.

    MAIN CONTRACTOR

    SUB CONTRACTOR

    Soil Protection System

    Structure Work

    Architectural Work

    THE SIAM KEMPINSKI HOTEL

  • PROJECT: THE SIAM KEMPINSKI HOTEL

    HIROSE (THAILAND) LTD.

  • Siam Paragon

    Site Construction

    HIROSE (THAILAND) LTD. Site Location

  • Siam Paragon Siam

    Square

    Plant Concrete

    prathumw

    anaram Tem

    ple

    Saprathum

    Palace

    Bangkok

    Apartment

    Aorachol C

    anal

    HIROSE (THAILAND) LTD. Site Lay-Out & Access of Work

  • Zoning

    Zone 1

    Zone 3

    Zone 4

    Zone 2

    HIROSE (THAILAND) LTD.

  • 3

    1 2

    Plan of Driving Sheet Piles HIROSE (THAILAND) LTD.

  • Driving King Posts

    H H H H H H H H H H

    H H H H H H H H H H

    H H H H H H H H H H

    H H H

    H H H

    H

    H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H H H H H H H H H H H H H H H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H

    H H H H H H H

    H H H H H

    H H H H

    H H H

    H H

    H

    HIROSE (THAILAND) LTD.

  • Installation Platform HIROSE (THAILAND) LTD.

  • Installation Bracing 1st & 2nd Layer HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m

    FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    0.00 0.00 0.00

    Driving Sheet Piles & King Posts

    Sheet Pile

    King Post

    Silent Piler

    HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    0.00

    -1.50 1.5

    0

    Excavate for Install Platform (-1.50 m.) HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    -1.50

    0.00 PLATFORM +0.00

    1.50

    Installation Platform (+0.00 m.) HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    -2.30

    0.00 PLATFORM +0.00

    2.30

    Excavate for Install Bracing 1st Layer HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    2.30

    -2.30

    0.00 PACKING CONCRETE

    -1.50 1ST STRUT ;35HA(H350X350X12X19)

    PLATFORM +0.00

    Pre-Load 40% of Design Load

    Installation Bracing 1st Layer

    H

    HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    -4.50

    PLATFORM +0.00

    1ST STRUT

    0.00

    Excavate for Install Bracing 2nd Layer And Check Movement of Sheet Pile by Inclinometer

    INCLINOMETER

    HIROSE (THAILAND) LTD.

  • x

    -16.00m

    -18.00m

    FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    -4.50

    0.00 PLATFORM +0.00

    1ST STRUT

    MOVEMENT

    CHECKING

    -4.50

    0.50

    DEFLECTION OF CHECKING

    POINT LESS THAN 3.12 CM.

    Check Movement of Sheet Pile HIROSE (THAILAND) LTD.

  • Pre-Load 40% of Design Load

    -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    -4.50

    0.00 PLATFORM +0.00

    1ST STRUT -1.50 m

    2nd STRUT -4.00 m

    PACKING CONCRETE

    Installation Bracing 2nd Layer HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m H-300x300x10x15 L=18.00m

    0.00 PLATFORM +0.00

    1ST STRUT -1.50

    2nd STRUT -4.00

    -4.50 -4.50

    -5.80 -7.60

    LEAN CONCRETE

    Excavate to Level of Sub Structure HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    0.00 PLATFORM +0.00

    1ST STRUT -1.50

    2nd STRUT -4.00

    0.00

    -5.50

    FSP3 L=8.00m

    1.00m

    -4.775

    PACKING CONCRETE

    LEAN CONCRETE

    Driving Inner Sheet Pile&Bracing 3rd Layer

    No Pre-Load -4.50 LEAN CONCRETE

    -8.13 7.60

    5.80

    HIROSE (THAILAND) LTD.

  • -16.00m

    -18.00m

    FSP4 L=16.00m

    H-300x300x10x15 L=18.00

    PLATFORM +0.00

    1ST STRUT -1.50

    2nd STRUT -4.00

    -5.65

    FSP3 L=8.00m

    Remove Bracing 3rd Layer&Inner Sheet Pile

    SAND BACK FILL

    0.00 0.00

    HIROSE (THAILAND) LTD.

  • -5.80

    -16.00m

    -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    0.00 PLATFORM +0.00

    1ST STRUT -1.50

    2nd STRUT -4.00

    0.00

    Sub Structure & Back Fill Work

    -4.10 -5.00 Lean Concrete

    HIROSE (THAILAND) LTD.

  • -16.00m -18.00m FSP4 L=16.00m

    H-300x300x10x15 L=18.00m

    0.00 PLATFORM +0.00

    1ST STRUT -1.50

    2nd STRUT 4.00

    0.00

    Removal Bracing 2nd Layer

    -2.00

    Removal Bracing 1st Layer Extraction Sheet Pile & King Post

    Lean Concrete

    Lean Concrete

    Installation Raking Strut Removal Raking Strut

    Cement Grouting

    HIROSE (THAILAND) LTD.

  • Soil Protection Work

    PICTURES Of

  • Driving Sheet Pile by Silent Piler

  • Driving King Post by Vibro Hammer

  • Driving King Post by Vibro Hammer

  • Excavation for Install Platform at Level -1.50 m.

  • Welding Top Plate for Install Platform

  • Installation Sleeper Beam

  • Installation Floor Joist Beam

  • Installation Sleeper Beam & Floor Joist Beam

  • Installation Platform

  • Installation Platform Work

  • Excavation for Install Bracing 1st Layer (-2.30m)

  • Installation Bracket for Support Bracing

  • Installation Bracing 1st Layer (-2.30m)

  • Fabrication Bracing System by Bolt & Nuts

  • Installation Bracing System 1st (-1.50m) Complete

  • Preloading 40% of Design Load

  • Excavation to Level -4.50m for Install Bracing 2nd

  • Excavation to Level -4.50m Complete

  • Check Movement of Sheet Pile by Survey

  • Check Movement of Sheet Pile by Inclinometer

  • Installation Bracing 2nd Layer at Level -4.00m

  • Installation Bracing 2nd Layer at Level -4.00m

  • Preloading 40% of Design Load

  • Check Pressure in Strut form PRESSURE GAUGE Every day

  • Excavate to Level of Sub Structure

  • Driving Inner Sheet Pile

  • Driving Inner Sheet Pile

  • Installation Raking Strut

  • 000000000000000000000

  • 000000000000000000000

  • Sand Back Fill Work

  • Extract Sheet Pile with Cement Grouting

  • Extraction King Post

  • HIROSE (THAILAND) LTD.

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39Slide Number 40Slide Number 41Slide Number 42Slide Number 43Slide Number 44Slide Number 45Slide Number 46Slide Number 47Slide Number 48Slide Number 49Slide Number 50Slide Number 51Slide Number 52Slide Number 53Slide Number 54Slide Number 55Slide Number 56Slide Number 57Slide Number 58