Upload
suthep-kheaawdum
View
110
Download
0
Embed Size (px)
Citation preview
HIROSE (THAILAND) LTD.
MAIN CONTRACTOR
SUB CONTRACTOR
Soil Protection System
Structure Work
Architectural Work
THE SIAM KEMPINSKI HOTEL
PROJECT: THE SIAM KEMPINSKI HOTEL
HIROSE (THAILAND) LTD.
Siam Paragon
Site Construction
HIROSE (THAILAND) LTD. Site Location
Siam Paragon Siam
Square
Plant Concrete
prathumw
anaram Tem
ple
Saprathum
Palace
Bangkok
Apartment
Aorachol C
anal
HIROSE (THAILAND) LTD. Site Lay-Out & Access of Work
Zoning
Zone 1
Zone 3
Zone 4
Zone 2
HIROSE (THAILAND) LTD.
3
1 2
Plan of Driving Sheet Piles HIROSE (THAILAND) LTD.
Driving King Posts
H H H H H H H H H H
H H H H H H H H H H
H H H H H H H H H H
H H H
H H H
H
H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H H H H H H H H H H H H H H H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H H H H H H H
H H H H H
H H H H
H H H
H H
H
HIROSE (THAILAND) LTD.
Installation Platform HIROSE (THAILAND) LTD.
Installation Bracing 1st & 2nd Layer HIROSE (THAILAND) LTD.
-16.00m
-18.00m
FSP4 L=16.00m
H-300x300x10x15 L=18.00m
0.00 0.00 0.00
Driving Sheet Piles & King Posts
Sheet Pile
King Post
Silent Piler
HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
0.00
-1.50 1.5
0
Excavate for Install Platform (-1.50 m.) HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
-1.50
0.00 PLATFORM +0.00
1.50
Installation Platform (+0.00 m.) HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
-2.30
0.00 PLATFORM +0.00
2.30
Excavate for Install Bracing 1st Layer HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
2.30
-2.30
0.00 PACKING CONCRETE
-1.50 1ST STRUT ;35HA(H350X350X12X19)
PLATFORM +0.00
Pre-Load 40% of Design Load
Installation Bracing 1st Layer
H
HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
-4.50
PLATFORM +0.00
1ST STRUT
0.00
Excavate for Install Bracing 2nd Layer And Check Movement of Sheet Pile by Inclinometer
INCLINOMETER
HIROSE (THAILAND) LTD.
x
-16.00m
-18.00m
FSP4 L=16.00m
H-300x300x10x15 L=18.00m
-4.50
0.00 PLATFORM +0.00
1ST STRUT
MOVEMENT
CHECKING
-4.50
0.50
DEFLECTION OF CHECKING
POINT LESS THAN 3.12 CM.
Check Movement of Sheet Pile HIROSE (THAILAND) LTD.
Pre-Load 40% of Design Load
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
-4.50
0.00 PLATFORM +0.00
1ST STRUT -1.50 m
2nd STRUT -4.00 m
PACKING CONCRETE
Installation Bracing 2nd Layer HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m H-300x300x10x15 L=18.00m
0.00 PLATFORM +0.00
1ST STRUT -1.50
2nd STRUT -4.00
-4.50 -4.50
-5.80 -7.60
LEAN CONCRETE
Excavate to Level of Sub Structure HIROSE (THAILAND) LTD.
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
0.00 PLATFORM +0.00
1ST STRUT -1.50
2nd STRUT -4.00
0.00
-5.50
FSP3 L=8.00m
1.00m
-4.775
PACKING CONCRETE
LEAN CONCRETE
Driving Inner Sheet Pile&Bracing 3rd Layer
No Pre-Load -4.50 LEAN CONCRETE
-8.13 7.60
5.80
HIROSE (THAILAND) LTD.
-16.00m
-18.00m
FSP4 L=16.00m
H-300x300x10x15 L=18.00
PLATFORM +0.00
1ST STRUT -1.50
2nd STRUT -4.00
-5.65
FSP3 L=8.00m
Remove Bracing 3rd Layer&Inner Sheet Pile
SAND BACK FILL
0.00 0.00
HIROSE (THAILAND) LTD.
-5.80
-16.00m
-18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
0.00 PLATFORM +0.00
1ST STRUT -1.50
2nd STRUT -4.00
0.00
Sub Structure & Back Fill Work
-4.10 -5.00 Lean Concrete
HIROSE (THAILAND) LTD.
-16.00m -18.00m FSP4 L=16.00m
H-300x300x10x15 L=18.00m
0.00 PLATFORM +0.00
1ST STRUT -1.50
2nd STRUT 4.00
0.00
Removal Bracing 2nd Layer
-2.00
Removal Bracing 1st Layer Extraction Sheet Pile & King Post
Lean Concrete
Lean Concrete
Installation Raking Strut Removal Raking Strut
Cement Grouting
HIROSE (THAILAND) LTD.
Soil Protection Work
PICTURES Of
Driving Sheet Pile by Silent Piler
Driving King Post by Vibro Hammer
Driving King Post by Vibro Hammer
Excavation for Install Platform at Level -1.50 m.
Welding Top Plate for Install Platform
Installation Sleeper Beam
Installation Floor Joist Beam
Installation Sleeper Beam & Floor Joist Beam
Installation Platform
Installation Platform Work
Excavation for Install Bracing 1st Layer (-2.30m)
Installation Bracket for Support Bracing
Installation Bracing 1st Layer (-2.30m)
Fabrication Bracing System by Bolt & Nuts
Installation Bracing System 1st (-1.50m) Complete
Preloading 40% of Design Load
Excavation to Level -4.50m for Install Bracing 2nd
Excavation to Level -4.50m Complete
Check Movement of Sheet Pile by Survey
Check Movement of Sheet Pile by Inclinometer
Installation Bracing 2nd Layer at Level -4.00m
Installation Bracing 2nd Layer at Level -4.00m
Preloading 40% of Design Load
Check Pressure in Strut form PRESSURE GAUGE Every day
Excavate to Level of Sub Structure
Driving Inner Sheet Pile
Driving Inner Sheet Pile
Installation Raking Strut
000000000000000000000
000000000000000000000
Sand Back Fill Work
Extract Sheet Pile with Cement Grouting
Extraction King Post
HIROSE (THAILAND) LTD.
Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39Slide Number 40Slide Number 41Slide Number 42Slide Number 43Slide Number 44Slide Number 45Slide Number 46Slide Number 47Slide Number 48Slide Number 49Slide Number 50Slide Number 51Slide Number 52Slide Number 53Slide Number 54Slide Number 55Slide Number 56Slide Number 57Slide Number 58