2
Kristine R. Murphy 1210 Gull Road 605-390-9398 Fairbanks, AK 99712 [email protected] Professional Experience Sept 2014 – Present Mill Operations Supervisor, Kinross Fort Knox Gold Mine Fairbanks, AK Directly supervised 10 operators in charge of safely operating, troubleshooting, and optimizing production on a rotating shift o Promoted a positive and safe culture within the crew, operations team and mill o Held operators accountable to their work schedules, work performance, safety programs, housekeeping calendars, strategy management, attendance and performance through daily feedback and performance evaluations o Direct and prioritize work with respect to maintenance, operations, technical, and business unit needs o Managed overtime and consumable costs to keep operations budget on target o Created a standardized method across all crews to report production numbers against target, established 5S systems o Proficient at JD Edwards maintenance work order and planning systems Nov 2013 – Sept 2014 Operations Supervisor, Rio Tinto Kennecott Utah Copper Concentrator Salt Lake City, UT Directly supervised 8 operators on 2 different crews in charge of safely operating and maintaining the copper flotation area on a rotating shift in accordance with the Collective Bargaining Agreement o Created daily strategies to meet key performance indicators and operator development plans o Directed work in accordance with work schedules, work performance, safety programs, housekeeping calendars o Rated employee performance and reviewed quarterly o Handled emergency situations and resolve incidents promptly Feb 2009 – Nov 2013 Metallurgical Engineer, Rio Tinto Kennecott Utah Copper Concentrator Salt Lake City, UT Supported operations by translating past performance into optimized plant strategies aimed at maximizing value safely. Supervised 3 direct reports and 3 indirect reports, including interns, work-study student, and graduate engineers. Team member of Operational Support (Day-to-Day) group in Technical Services o Responsible for daily and monthly metals reconciliation and training in Algosys Bilmat o Facilitated root cause analysis, 5 whys, risk assessments, formal training, and strategy building sessions o Developed and implemented 3 moly plant training videos on flotation basics, reagent basics, and sample prep Led MAP (Moly Autoclave Process) Project valued at $13.4M to provide new plant with dry startup feed during commissioning o Resourced and organized full plant sampling campaign to test feasibility of project, analyzed results, created strategies

Kristine murphy resume v5.2

Embed Size (px)

Citation preview

Page 1: Kristine murphy resume v5.2

Kristine R. Murphy1210 Gull Road 605-390-9398Fairbanks, AK 99712 [email protected]

Professional ExperienceSept 2014 – Present Mill Operations Supervisor, Kinross Fort Knox Gold Mine Fairbanks, AKDirectly supervised 10 operators in charge of safely operating, troubleshooting, and optimizing production on a rotating shift

o Promoted a positive and safe culture within the crew, operations team and millo Held operators accountable to their work schedules, work performance, safety programs, housekeeping calendars,

strategy management, attendance and performance through daily feedback and performance evaluationso Direct and prioritize work with respect to maintenance, operations, technical, and business unit needso Managed overtime and consumable costs to keep operations budget on targeto Created a standardized method across all crews to report production numbers against target, established 5S systems o Proficient at JD Edwards maintenance work order and planning systems

Nov 2013 – Sept 2014 Operations Supervisor, Rio Tinto Kennecott Utah Copper Concentrator Salt Lake City, UTDirectly supervised 8 operators on 2 different crews in charge of safely operating and maintaining the copper flotation area on a rotating shift in accordance with the Collective Bargaining Agreement

o Created daily strategies to meet key performance indicators and operator development planso Directed work in accordance with work schedules, work performance, safety programs, housekeeping calendarso Rated employee performance and reviewed quarterlyo Handled emergency situations and resolve incidents promptly

Feb 2009 – Nov 2013 Metallurgical Engineer, Rio Tinto Kennecott Utah Copper Concentrator Salt Lake City, UTSupported operations by translating past performance into optimized plant strategies aimed at maximizing value safely. Supervised 3 direct reports and 3 indirect reports, including interns, work-study student, and graduate engineers.

Team member of Operational Support (Day-to-Day) group in Technical Serviceso Responsible for daily and monthly metals reconciliation and training in Algosys Bilmato Facilitated root cause analysis, 5 whys, risk assessments, formal training, and strategy building sessionso Developed and implemented 3 moly plant training videos on flotation basics, reagent basics, and sample prep

Led MAP (Moly Autoclave Process) Project valued at $13.4M to provide new plant with dry startup feed during commissioning o Resourced and organized full plant sampling campaign to test feasibility of project, analyzed results, created strategieso Wrote Capital Expenditure Application for funding for MAP startup feed a permanence in the moly plant

Led 4 projects contributing to the Cu Recovery Mandate Project valued at $33.5M/2 years, which was focused on improving plant recovery 5% over the predicted recovery, and personally managed mandate project communications

o Improved consistency for flotation pulling rates, the most significant driver for recovery, valued at $3.1M/yearo Tested new copper/moly collector to improve recovery and replace the current moly collector, valued at $3 M/yearo Validated theoretical grade recovery curves and implemented a grade recovery SOP to optimize daily strategieso Led Kaizen team on froth float replacement and sparger rebuild valued at $170K/year

Led moly plant testing of a new iron depressant reagent to depress Fe in the moly plant, valued at $2.5M/year Led Kaizen team on the moly plant dryers to avoid $3M/year of rehandling high moisture moly product Participated in IPT methodology rollout to KUC concentrator and feasibility and testing of Rhenium pilot plant at smelter

EducationBS Chemical Engineering SDSM&T 2008BS Environmental Engineering SDSM&T 2008Minor Occupational Safety SDSM&T 2008Certification Six Sigma Black Belt KUC 2012Certification Balmert Managing Safety Performance Balmert Consulting 20136 CEU credits Engineering and Management System for Plant Grinding Operations Metcom 2013Certificate Emerging Supervisors Programme Rio Tinto 2013Certificate Outotec flotation training for “Supercell” flotation Outotec 2013Certificate Incident Management Training Smokin’ Fire Productions 20140.5 CEU credits First Line Supervision and Leadership NAU 2015Certificate SafeCREW training SafeMAP 2015Blue card MSHA blue card training Kinross/MSHA 2015