MISSISSIPPI RIVER BRIDGE ITS IMPROVEMENTS PERFORMANCE MEASURES

MS RIVER BRIDGE SECURITY ITS PROJECT

Embed Size (px)

Citation preview

Page 1: MS RIVER BRIDGE SECURITY ITS PROJECT

MISSISSIPPI

RIVER BRIDGE ITS IMPROVEMENTS

PERFORMANCE MEASURES

Page 2: MS RIVER BRIDGE SECURITY ITS PROJECT

Project Goals

Mississippi River Bridge Incident Management, Freight Movements and Security Project

Tiger 3 Project – Arkansas, Louisiana, Mississippi

• Improves mobility and safety

• Assists multi-model traffic (Highway and River)

• Uses ITS to accomplish these goal

• MSRITS.com

Page 3: MS RIVER BRIDGE SECURITY ITS PROJECT

Bridge Locations

Page 4: MS RIVER BRIDGE SECURITY ITS PROJECT

Project Goals

• Improve Traveler Information Services

• Improve Incident and Emergency Management

• Manage and Mitigate Congestion

• Improve Efficiency and Safety of Goods

• Provide for Locally Specific Goals/Needs

• Improve Interagency/Inter-Jurisdictional Coordination, Cooperation and Information Sharing

Page 5: MS RIVER BRIDGE SECURITY ITS PROJECT

Key Initiatives

• Advanced Transportation Management Systems

• Advanced Traveler Information Systems

• Coordinated Incident Management

• Advanced Emergency Management

• Advanced Construction and Maintenance Systems

Page 6: MS RIVER BRIDGE SECURITY ITS PROJECT

Monitoring

• CCTV Cameras

• RDS Devices

• RTRC Devices

• DMS

• RWIS

• HAR

Page 7: MS RIVER BRIDGE SECURITY ITS PROJECT

Communications

• Rural ITS Locations

• Leased Lines

• Fiber

• Cellular Networks

Page 8: MS RIVER BRIDGE SECURITY ITS PROJECT

Traffic Management

• Monitoring of ITS devices

• Sharing of information

between three States

• Sharing information between

multiple agencies

• Common ATMS system

Page 9: MS RIVER BRIDGE SECURITY ITS PROJECT

Performance Measures

Mobility

• Delay

• Speed

• Throughput

• Travel Times

Safety

• Crash Totals

• Crash Rates

• Severity

Page 10: MS RIVER BRIDGE SECURITY ITS PROJECT

Performance Measures

Delay based on Crash Reports

• Project Requirements

– Annual Vehicle Crash Rates

– Bridge Collision Crash Rates

– Response Times (Highways/River)

– Delay (per incident)

Page 11: MS RIVER BRIDGE SECURITY ITS PROJECT

Delay Calculations

• Delay based on Crash Reports

• MDOT SAMS

Crashes near/on Bridge

• Coast Guard Reports

• Assumptions

Peak Hour Flow (AADT)

Full Lane Closures

Minimum Diversions

Page 12: MS RIVER BRIDGE SECURITY ITS PROJECT

Delay Equation

Measured Delay Calculation = Avg. Delay during

Accident Event + Avg. Delay During Congestion

Clearance

FREE FLOW

TRAFFIC

CONGESTION QUEUE

AC

CID

ENT

OC

CU

RS

AC

CID

ENT

CLE

AR

ED

FREE

FLO

W

TRA

FFIC

TIME

Page 13: MS RIVER BRIDGE SECURITY ITS PROJECT

Delay Equation

Measured Delay Calculation = Avg. Delay during

Accident Event + Avg. Delay During Congestion

ClearanceNatchez Bridge

MDOT CRASH DATA

Crash # Date Description Severity Index Clearance Time (min)

1 05/17/2013 Run off Road - Right 5 64

2 06/04/2013 Head on 4 40

3 06/22/2013 Run off Road - Left 5 50

4 07/09/2013 Rear end slow or stop 4 69

5 07/20/2013 Rear end slow or stop 5 80

Total Vehicle Delay (Based on MDOT SAMS data)

Crash # Congestion (veh) *1Congestion Length (ft) (2 lanes) *2

Free Flow time (min) *3

Total Clearance Time (min)

1 1242 15520.0 11.76 75.76

2 776 9700.0 7.35 47.35

3 970 12125.0 9.19 59.19

4 1339 16732.5 12.68 81.68

5 1552 19400.0 14.70 94.70DELAY IN VEH-HRAvg Delay During Accident (min)

Avg Delay During Accident (veh-hr)

Avg Queue Delay (veh-hr)

Total Delay (veh-hr)

32.00 662.19 121.75 783.94

20.00 258.67 47.58 306.25

25.00 404.17 74.33 478.49

34.50 769.70 141.51 911.20

40.00 1034.67 190.20 1224.87

Page 14: MS RIVER BRIDGE SECURITY ITS PROJECT

Reporting Period

• Quarterly Reports

• Comparison Studies

• 5 Year Reporting Period

Page 15: MS RIVER BRIDGE SECURITY ITS PROJECT

Reporting Goals

• See Greater Diversion

• Less Congestion

• Lower Delay on Routes

• Fewer Accidents

• Focus on CVO

• Use RDS and CCTV to

Measure

Page 16: MS RIVER BRIDGE SECURITY ITS PROJECT

MDOTTraffic.com

Page 17: MS RIVER BRIDGE SECURITY ITS PROJECT

QUESTIONS ?

ACEY ROBERTS P.E.

ITS Engineer

[email protected]