Page 1: Plc and scada report

AMITY UNIVERSITYRajasthan

A

TRAINING REPORT ON

PLC AND SCADA

SUBMITTED TOMs. Pushpa Gothwal

SUBMITTED BYIndira Kundu

B.tech(ECE) 7th semester

October 31, 2014

Page 2: Plc and scada report

CERTIFICATE

This is to certify that this project report on PLC and SCADA is submitted byIndira Kundu, who carried out the project work under my supervision.I approvethis project for submission of the Bachelor of Engineering in the Departmentof Electronics and Communication, Amity School of Engineering and Technol-ogy, Amity University Rajasthan, affiliated to UGC.

FACULTYMs. Pushpa GothwalASET(AUR)

i

Page 3: Plc and scada report

ACKNOWLEDGMENT

It gives me immense pleasure to express my deepest sense of gratitude and sin-cere thanks to my highly respected and esteemed guide Ms.Pushpa Gothwal,Faculty of Amity School of Engineering and Technology, for her valuable guid-ance, encouragement and help for completing this work. Her useful suggestionsfor this whole work and co-operative behavior are sincerely acknowledged.

Indira Kundu(Student)

ii

Page 4: Plc and scada report

Contents

CERTIFICATE i

ACKNOWLEDGMENT ii

1 INTRODUCTION TO AUTOMATION 1

2 Programmable Logic Controller 2

2.1 Features of PLCS . . . . . . . . . . . . . . . . . . . . . . . . . 2

2.2 History of PLCS . . . . . . . . . . . . . . . . . . . . . . . . . 3

2.3 Components of PLC: . . . . . . . . . . . . . . . . . . . . . . . 3

2.4 PLC OPERATION AND PLC SCAN CYCLE: . . . . . . . . . 4

2.5 Ladder Logic . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

2.6 Ladder Logic Programming . . . . . . . . . . . . . . . . . . . . 5

3 SCADA 8

3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

3.2 WONDERWARE-INTOUCH . . . . . . . . . . . . . . . . . . 9

3.3 Manufacturers of SCADA . . . . . . . . . . . . . . . . . . . . 9

3.4 Features of SCADA . . . . . . . . . . . . . . . . . . . . . . . . 9

3.4.1 Dynamic Process Graphics . . . . . . . . . . . . . . . . 10

3.4.2 Real-time and Historical Trends . . . . . . . . . . . . . 11

3.4.3 Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3.4.4 Recipe Management . . . . . . . . . . . . . . . . . . . 12

3.4.5 Security . . . . . . . . . . . . . . . . . . . . . . . . . . 14

3.4.6 Device Connectivity . . . . . . . . . . . . . . . . . . . 14

3.4.7 Database Connectivity . . . . . . . . . . . . . . . . . . 15

3.4.8 Scripts . . . . . . . . . . . . . . . . . . . . . . . . . . 15

3.5 Potential benefits of SCADA . . . . . . . . . . . . . . . . . . . 15

3.6 Where SCADA is used ? . . . . . . . . . . . . . . . . . . . . . 15

iii

Page 5: Plc and scada report

4 Project Using PLC: Glowing of four LED using START, STOP andSELECTOR Switches 17

4.1 Project Objective: . . . . . . . . . . . . . . . . . . . . . . . . . 17

4.2 Hardware and Software Used: . . . . . . . . . . . . . . . . . . 17

4.3 Working of Project: . . . . . . . . . . . . . . . . . . . . . . . . 18

4.4 Programming: . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

4.5 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

4.6 Future Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

5 Project Using SCADA: Sewage Water Treatment 25

5.1 Project Objective: . . . . . . . . . . . . . . . . . . . . . . . . . 25

5.2 Software Used: . . . . . . . . . . . . . . . . . . . . . . . . . . 25

5.3 Working of Project: . . . . . . . . . . . . . . . . . . . . . . . . 26

5.4 Programming: . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

5.5 Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

5.6 Future Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

6 CONCLUSION 33

REFERENCES 34

iv

Page 6: Plc and scada report

List of Figures

1 PLC scan cycle . . . . . . . . . . . . . . . . . . . . . . . . . . 4

2 Basic Ladder Logic Program . . . . . . . . . . . . . . . . . . . 5

3 Basic Ladder Logic Program . . . . . . . . . . . . . . . . . . . 6

4 Basic Program to show input and output . . . . . . . . . . . . . 6

5 Examine if Closed . . . . . . . . . . . . . . . . . . . . . . . . . 6

6 Output energize . . . . . . . . . . . . . . . . . . . . . . . . . . 7

7 Examine if open . . . . . . . . . . . . . . . . . . . . . . . . . . 7

8 Schematic of DPG . . . . . . . . . . . . . . . . . . . . . . . . 10

9 Schematic of Trends . . . . . . . . . . . . . . . . . . . . . . . 11

10 Schematic of Alarm . . . . . . . . . . . . . . . . . . . . . . . . 12

11 Schematic of Receipe management . . . . . . . . . . . . . . . . 13

12 Receipe manager window . . . . . . . . . . . . . . . . . . . . . 13

13 Schematic of Security . . . . . . . . . . . . . . . . . . . . . . . 14

14 Schematic of PLC-1000 micrologix . . . . . . . . . . . . . . . 17

15 Flowchart of Ladder logic . . . . . . . . . . . . . . . . . . . . . 18

16 Start button is pressed . . . . . . . . . . . . . . . . . . . . . . . 19

17 B3:0/0 is high and Red LED glows . . . . . . . . . . . . . . . . 20

18 B3:0/1 is high and Green LED glows . . . . . . . . . . . . . . . 21

19 B3:0/2 is high and Yellow LED glows . . . . . . . . . . . . . . 22

20 Counters get Reset . . . . . . . . . . . . . . . . . . . . . . . . 24

21 Schematic of Object Properties . . . . . . . . . . . . . . . . . . 27

22 Window in develpoment mode in Window maker . . . . . . . . 28

23 Schematic of Window Script used . . . . . . . . . . . . . . . . 29

24 Sedimentation of water . . . . . . . . . . . . . . . . . . . . . . 30

25 Oxygenation and chlorination of water . . . . . . . . . . . . . . 31

26 Passing water through filter . . . . . . . . . . . . . . . . . . . . 31

v

Page 7: Plc and scada report

1 INTRODUCTION TO AUTOMATION

Automation is the use of control systems such as computers to control indus-trial machinery and process,reducing the need for human intervention. In thescope of industrialization, automation is a step beyond mechanization. Whereasmechanization provided human operators with machinery to assist them withphysical requirements of work, automation greatly reduces the need for humansensory and mental requirements as well. Processes and systems can also beautomated.

Automation Impacts:

1. It increases productivity and reduce cost.

2. It gives emphasis on flexibility and convertibility of manufacturing pro-cess. Hence gives manufacturers the ability to easily switch from manu-facturing Product A to manufacturing product B without completely re-built the existing system/product lines.

3. Automation is now often applied primarily to increase quality in the man-ufacturing process, where automation can increase quality substantially.

4. Increase the consistency of output.

5. Replacing humans in tasks done in dangerous environments.

Advantages of Automation:

1. Replacing human operators in tasks that involve hard physical or monotonouswork.Also task done in dangerous environments.

2. Performing tasks that are beyond human capabilities of size, weight, speed,endurance, etc.

3. Economy improvement: Automation may improve in economy of enter-prises, society or most of humanity.

Disadvantages of Automation:

1. Technology limits: Current technology is unable to automate all the de-sired tasks.

2. Unpredictable development costs: The research and development cost ofautomating a process may exceed the cost saved by the automation itself.

3. High initial cost: The automation of a new product or plant requires ahuge initial investment in comparison with the unit cost of the product.

1

Page 8: Plc and scada report

2 Programmable Logic Controller

A programmable logic controller, PLC is a digital computer used for automationof typically industrial electromechanical processes, such as control of machin-ery on factory assembly lines etc.It is a solid state user programmable controlsystem with functions to control logic, sequencing, timing, arithmetic data ma-nipulation and counting capabilities. It can be viewed as an industrial computerthat has a central processor unit, memory, input output interface and a pro-gramming device. The central processing unit provides the intelligence of thecontroller. It accepts data, status information from various sensing devices likelimit switches, proximity switches, executes the user control program stored inthe memory and gives appropriate output commands to devices such as solenoidvalves, switches etc.

A constant demand for better and more efficient manufacturing and processmachinery has led to the requirement for higher quality and reliability in controltechniques. With the availability of intelligent, compact solid state electronicdevices, it has been possible to provide control systems that can reduce mainte-nance, down time and improve productivity to a great extend.One of the latesttechniques in solid state controls that offers flexible and efficient operation tothe user is programmable controllers.

2.1 Features of PLCS

1. PLC is an industrial computer control system that continuously monitorsthe state of input devices and makes decisions based upon a custom pro-gram to control the state of output devices.

2. It is designed for multiple inputs and output arrangements, extended tem-perature ranges, immunity to electrical noise, and resistance to vibrationand impact.

3. Almost any production process can greatly enhanced using this type ofcontrol system, the biggest benefit in using a PLC is the ability to changeand replicate the operation or process while collecting and communicat-ing vital information.

4. It is modular i.e. one can mix and match the types of input and outputdevices to best suit one’s application.

2

Page 9: Plc and scada report

2.2 History of PLCS

1. The first PLCS were designed and developed by Modicon as a relay re-placer for GM and Landis.

2. The primary reason for designing such a device was eliminating the largecost involved in replacing the complicated relay based machine controlsystems for major U.S. car manufacturers.

3. These controllers eliminated the need of rewiring and adding additionalhardware for every new configuration of logic.

4. The first PLC, model 084, was invented by Dick Morley in 1969.

5. The first commercial successful PLC, the 184, was introduced in 1973and was designed by Michel Greenberg.

2.3 Components of PLC:

The PLC mainly consists of a CPU, memory areas, and appropriate circuits toreceive input/output data. We can actually consider the PLC to be a box fullof hundreds or thousands of separate relays, counters, timers and data storagelocations.Each component of a PLC has a specific function:

1. The CPU is the brain of a PLC system. It consists of the microprocessor,memory integrated circuits and circuits necessary to store and retrieveinformation from memory. It also includes communication ports to theperipherals, other PLCs or programming terminals. The job of the pro-cessor is to monitor status or state of input devices, scan and solve thelogic of a user program, and control on or off state of output devices.

2. Counters - These are simulated counters and they can be programmed tocount pulses. Typically these counters can count up, down or both up anddown. Since they are simulated they are limited in their counting speed.Some manufacturers also include high-speed counters that are hardwarebased. We can think of these as physically existing.

3. Timers - These come in many varieties and increments. The most com-mon type is an on-delay type. Others include off-delay and both retentiveand non-retentive types. Increments vary from 1 millisecond to 1 second.

4. Output Relays (coils) - These are connected to the outside world. Theyphysically exist and send on/off signals to solenoids, lights, etc. They canbe transistors, relays depending upon the model chosen.

3

Page 10: Plc and scada report

5. Data Storage - Typically there are registers assigned to simply store data.They are usually used as temporary storage for math or data manipulation.They can also typically be used to store data when power is removed fromthe PLC. Upon power-up they will still have the same contents as beforepower was removed

2.4 PLC OPERATION AND PLC SCAN CYCLE:

There are four basic steps in the operation of all PLCS which continually takeplace in a repeating loop.

1. Input Scan: Detects the state of all input devices that are connected to thePLC.

2. Program Scan: Executes the user created program logic.

3. Output Scan: Energizes or de-energize output devices that are connectedto the PLC. Depending on the PLC design, this process of updating theoutput devices may be done at the end of program execution or updatedimmediately upon execution of its corresponding logic statement in theuser program

4. Housekeeping: This step includes communications with programmingterminals, internal diagnostics etc.

PLC SCAN CYCLE: The completion of a cycle of the controller is calleda Scan. The scan time needed to complete a full cycle by the controller givesthe measure of the speed of execution for the PLC.

Figure 1: PLC scan cycle

4

Page 11: Plc and scada report

SCAN TIME Time taken by PLC to execute these three steps (CheckingInput status, Executing Program, Updating Output Status) is denoted by its scantime.

2.5 Ladder Logic

Ladder logic is one form of drawing electrical logic schematics, and is a graph-ical language very popular for programming PLCS. Ladder logic was originallyinvented to describe logic made from relays. The name is based on the observa-tion that programs in this language resemble ladders, with two vertical ”rails”and a series of horizontal ”rungs” between them.

Figure 2: Basic Ladder Logic Program

2.6 Ladder Logic Programming

Introduction

Ladder logic are the most common programming language used to programa PLC. Ladder logic was one of the first programming approaches used in PLCSbecause it borrowed heavily from the relay diagrams that plant electricians al-ready knew.

A program in ladder logic, also called a ladder diagram, is similar to aschematic for a set of relay circuits. Ladder logic is widely used to program

5

Page 12: Plc and scada report

Figure 3: Basic Ladder Logic Program

PLCS, where sequential control of a process or manufacturing operation is re-quired. Ladder logic is useful for simple but critical control systems, or forreworking old hardwired relay circuits. As programmable logic controllers be-came more sophisticated it has also been used in very complex automation sys-tems.A simplified ladder logic circuit with one input and one output. The logicof the rung above is such:

Figure 4: Basic Program to show input and output

1. If Input1 is ON (or true) - power (logic) completes the circuit from theleft rail to the right rail - and Output1 turns ON (or true).

2. If Input1 is OFF (or false) - then the circuit is not completed and logicdoes not flow to the right - and Output 1 is OFF (or false).

With just a handful of basic symbols such as a normally open contact, normallyclosed contact, normally open coil, normally closed coil, timer and counter mostlogical conditions can be represented.

Examine if Closed

Figure 5: Examine if Closed

6

Page 13: Plc and scada report

This can be used to represent any input to the control logic such as a switchor sensor, a contact from an output, or an internal output. When solved thereferenced input is examined for a true (logical 1) condition. If it is true, thecontact will close and allow logic to flow from left to right. If the status isFALSE (logical 0), the contact is open and logic will NOT flow from left toright.

Output energize

This can be used to represent any discrete output from the control logic.When ”solved” if the logic to the left of the coil is TRUE, the referenced outputis TRUE (logical 1).

Figure 6: Output energize

Examine if open

When solved the referenced input is examined for an OFF condition. If thestatus is OFF (logical 0) power (logic) will flow from left to right. If the statusis ON, power will not flow.

Figure 7: Examine if open

Basic Timers and Counters

A timer is simply a control block that takes an input and changes an outputbased on time. It is used for providing delay. There are two basic types oftimers. An On-Delay Timer takes an input, waits a specific amount of time,allows logic to flow after the delay. An Off-Delay Timer allows logic to flowto an output and keeps that output true until the set amount of time has passed,then turns it false, hence off-delay.

A counter simply counts the number of events that occur on an input. Thereare two basic types of counters called up counters and down counters. As itsname implies, whenever a triggering event occurs, an up counter increments thecounter, while a down counter decrements the counter whenever a triggeringevent occurs.

7

Page 14: Plc and scada report

3 SCADA

3.1 Introduction

SCADA stands for Supervisory Control And Data Acquisition. As the nameindicates, it is not a full control system, but rather focuses on the supervisorylevel. As such, it is a purely software package that is positioned on top of hard-ware to which it is interfaced, in general via PLC. SCADA systems are nowalso penetrating the experimental physics laboratories for the controls of ancil-lary systems such as cooling, ventilation, power distribution, etc. More recentlythey were also applied for the controls of smaller size particle detectors such asthe L3 moon detector and the NA48 experiment, to name just two examples atCERN.

SCADA systems have made substantial progress over the recent years interms of functionality, scalability, performance and openness such that they arean alternative to in house development even for very demanding and complexcontrol systems as those of physics experiments.

The process can be industrial, infrastructure or facility based as describedbelow:

1. Industrial Process: it includes those of manufacturing, production, powergeneration, fabrication and refining and process may be in continuous,batch, repetitive or discrete modes.

2. Infrastructure Process: it may be public or private, and water treatmentand distribution, wastewater collection and treatment, oil and gas pipelines,electrical power transmission and distribution, and large communicationsystems.

3. Facility Process: it occur both in public facilities and private ones, in-cluding buildings, airports, ships and space stations. They monitor andcontrol HVAC, access and energy consumption.

A SCADA System usually consists of the following Subsystems:

1. A Human-Machine Interface (HMI) is the apparatus which presents pro-cess data to a human operator, and through this, the human operator mon-itors and controls the process.

2. A supervisory (computer) system, gathering (acquiring) data on the pro-cess and sending commands (control) to the process.

8

Page 15: Plc and scada report

3. Remote Terminal Units (RTU) connecting to sensors in the process, con-verting sensor signals to digital data and sending digital data to the super-visory system.

4. Programmable Logic Controller (PLC) used as field devices because theyare more economical, versatile, flexible, and configurable than special-purpose RTUs.

5. Communication infrastructure connecting the supervisory system to theRemote Terminal Units.

3.2 WONDERWARE-INTOUCH

Intouch is worlds leading supervisory control and data acquisition software.The InTouch software package consist of Tags (Memory + I/O). The package isavailable in 64, 256, 1000 and 64,000 Tags with the three options:

1. D+R+N ( Development +Run + Networking)

2. R+N ( Run +Networking )

3. Factory focus

With DRN package one can develop as well as run the application but in caseof RN one cannot develop/modify the application. The application can be de-veloped by using DRN package and can be installed on RN package.

3.3 Manufacturers of SCADA

1. Allen Bradley : RS View

2. Siemens: win cc

3. Wonderware : Intouch

3.4 Features of SCADA

1. Dynamic Process Graphic

2. Alarm summary

3. Alarm history

9

Page 16: Plc and scada report

4. Real time trend

5. Historical time trend

6. Security (Application Security)

7. Data base connectivity

8. Device connectivity

9. Scripts

10. Recipe management

3.4.1 Dynamic Process Graphics

1. Using this feature, one can develop graphics which can resemble theplant.

2. The graphic can include Reactor, Valves, Pumps, agitators, conveyors aswell as other equipment and machinery used in the plant.

3. The status of the equipment running / stopped can be shown using differ-ent color / animations.

4. Typically the SCADA Software will have many ready to use symbols forproper representation which can be used in any type of industry.

Figure 8: Schematic of DPG

10

Page 17: Plc and scada report

3.4.2 Real-time and Historical Trends

1. This facility is used for representing the data in graphical form.

2. Typically the trends plots the value with reference to the time.

3. Real-time data will plot the real-time value fixed period of time whilehistorical data stored value which can be viewed on demand.

4. Depending upon the storing capacity of the hard-disk on can specify theno of days the data can be stored .

5. Some SCADA software show real-time and historical trends in singlegraphics while few others use separate tools.

Figure 9: Schematic of Trends

3.4.3 Alarms

1. Every plant need proper monitoring and control of the process parame-ters.

2. Alarms represent warnings of process conditions that could cause prob-lems, and require an operator response.

11

Page 18: Plc and scada report

3. Generally alarms are implemented by using the lamps or hooters in fieldbut in SCADA it can be represented using animation.

4. In many SCADA software, four type of alarm limits are used ie HI, HIHI,LOW, LOW LOW.

Figure 10: Schematic of Alarm

3.4.4 Recipe Management

1. In many case we use the same plant for manufacturing different prod-uct range. for example an oil blending plant can manufacture power oil,transformer oil, automobile oil.

2. The recipe management is facility is used to maintain various recipes ofdifferent products and implement it on the process.

3. The recipe can be stored in a single server and it can be fetched by anyclient server from any area to run the process.

12

Page 19: Plc and scada report

Figure 11: Schematic of Receipe management

Figure 12: Receipe manager window

13

Page 20: Plc and scada report

3.4.5 Security

1. Every SCADA Software has various levels of security for securing theapplication by avoiding unauthorized access.

2. Depending upon the access level given the operator / engineers is allowedto do the task. In the most of the case, operators are allowed only to op-erate the plant while maintenance engineers can do the application modi-fications.

3. The security can be given for individuals as well as for groups.

Figure 13: Schematic of Security

3.4.6 Device Connectivity

1. Every Control hardware has its own communication protocol for commu-nicating with different hardware / software. Some of the leading com-munication protocol include Modbus, Profibus, Ethernet, Dh+, DH 485,Devicenet, Control net.

2. The Scada Software needs device driver software for communication withPLC or other control hardware.

3. More the driver software available better is the device connectivity. Mostof the SCADA software used in the industry have connectivity with mostof the leading control system.

14

Page 21: Plc and scada report

3.4.7 Database Connectivity

1. In many plants, it is important to download the real-time information tothe Management information system. In this case the database connectiv-ity is must.

2. Many SCADA software don’t have their own database. Hence for storageand reporting they use third party database like MS Acess or SQL.

3.4.8 Scripts

1. Script is a way of writing logic in SCADA software, every SCADA soft-ware has its own instruction and way of writing programme.

2. Use scripts, one can develop complex applications. You can create yourown functions to suit the requirement. execution.

3. Various types of scripts make project execution simpler for programmer.

3.5 Potential benefits of SCADA

The benefits one can expect from adopting a SCADA system for the control ofexperimental physics facilities can be summarised as follows:

1. The amount of specific development that needs to be performed by theend-user is limited, especially with suitable engineering.

2. Reliability and robustness: These systems are used for mission criticalindustrial processes where reliability and performance are paramount.In addition, specific development is performed within a well-establishedframework that enhances reliability and robustness.

3. Technical support and maintenance by the vendor.

3.6 Where SCADA is used ?

1. Electric power generation, transmission and distribution: Electric utilitiesuse SCADA systems to detect current flow and line voltage, to monitorthe operation of circuit breakers etc.

2. Water and sewage: State and municipal water utilities use SCADA tomonitor and regulate water flow, reservoir levels, pipe pressure and otherfactors. Industrial Processes such as Manufacutring.

15

Page 22: Plc and scada report

4 Project Using PLC: Glowing of four LED usingSTART, STOP and SELECTOR Switches

4.1 Project Objective:

To design a system using Programmable Logic Controller with the specifica-tions given: There are four LEDs red, green, yellow and blue. Two push-buttonswitches are there for START, STOP and for LED selection there is SELECTswitch.The START button is pressed after that:

1. Condition 1:If SELECT switch is pressed once then red LED glows.

2. Condition 2:If SELECT switch is pressed twice then green LED glows.

3. Condition 3:If SELECT switch is pressed thrice then yellow LED glows.

4. Condition 4:If SELECT switch is pressed four times then blue LED glows.

4.2 Hardware and Software Used:

1. PLC:Allen Bradley Micro Logix 1000 with 10 Input / Output.The MicroLogix 1000 programmable controller is a packaged controllercontaining a power supply, input circuits, output circuits, and a processor.The controller is available in 10 I/O, 16 I/O and 32 I/O configurations, aswell as an analog version with 20 discrete I/O and 5 analog I/O.

Figure 14: Schematic of PLC-1000 micrologix

16

Page 23: Plc and scada report

2. Programming Software: Rockwell software RS Logix 500 EnglishThis family of products has been developed to operate on Microsoft Win-dows operating systems.It Supports the Allen-Bradley SLC 500 and Mi-cro Logix families of processors. RSLogix 500 benefits include:

(a) Cross-reference information(b) Drag-and-drop editing(c) Diagnostics(d) Dependable communications

3. Communication Software: RS Linx.

4. Programming Language: Ladder Logic.

5. Communication Protocol: RS 232

6. Other Hardware: Push Buttons, Light Emitting Diode.

4.3 Working of Project:

Figure 15: Flowchart of Ladder logic

As specified in the objective there are four conditions under which LEDsof different colors will glow. Once the STOP button is button is pressed theprocess will stop. This whole idea is implemented in the ladder logic.

17

Page 24: Plc and scada report

4.4 Programming:

1. Figure with explanation

Figure 16: Start button is pressed

Rung 0000:

(a) The SELECTOR switch is indicated by I:0/0 which is connectedto four parallel UP counters C5:0(preset = 1), C5:1 (preset = 2),C5:2(preset = 3),C5:4 (preset = 4). All the counters have their accu-mulator value set to zero.

(b) These counters work on discrete pulses and count the number oftimes the SELECTOR switch is pressed. Each time when the SE-LECTOR switch is pressed the accumulator value of each counter isincremented by 1 until the reaches the value of its preset.

(c) When the accumulators value = preset value, the DN bit of thecounter goes HIGH.

2. Figure with explanation

Rung 0001:

(a) The input XIC I:0/1 (START switch) is connected with XIC C5:0/DN,XIO I:0/2 (STOP switch), XIO C5:1/DN, XIO C5:2/DN,XIO C5:3/DNand the binary output B3:0/0.

(b) Except C5:0/DN all the DN bits are XIO because the condition 1 ischecked where except C5:0/DN none of the DN bits should be high.

18

Page 25: Plc and scada report

Figure 17: B3:0/0 is high and Red LED glows

(c) The output B3:0/0 is connected as input parallel to I:0/1 to make aholding circuit, so that even if the START button is released B3:0/0remains high.

(d) When the SELECTOR switch is pressed only once, the accumula-tor value of all the counters becomes 1 and the C5:0/DN becomesHIGH. Next when the START switch is pressed then all the inputsin the rung are HIGH, therefore, the output B3:0/0 will be energizedi.e. it goes HIGH.

Rung 0002:

(a) B3:0/0 is connected as input to the output O:0/0. The output O:0/0indicates the red LED.

(b) As soon as the B3:0/0 goes HIGH the output O:0/0 is energized.Hence the output red LED glows.

3. Figure with explanation

Rung 0003:

(a) The input XIC I:0/1 (START switch) is connected with XIC C5:0/DN,XIO I:0/2 (STOP switch), XIC C5:1/DN, XIO C5:2/DN,XIO C5:3/DNand the binary output B3:0/0.

19

Page 26: Plc and scada report

Figure 18: B3:0/1 is high and Green LED glows

(b) Except C5:0/DN and C5:1/DN all the DN bits are XIO because herecondition 2 is checked where except C5:0/DN and C5:1/DN none ofthe DN bits should be high.

(c) The output B3:0/1 is connected as input parallel to I:0/1 to make aholding circuit, so that even if the START button is released B3:0/1remains high.

(d) When the SELECTOR switch is pressed twice, the accumulatorvalue of all the counters becomes 2. The C5:0/DN and C5:1/DNbecomes HIGH.

(e) When the START switch is pressed then all the inputs in the rung0003 are HIGH, therefore, the output B3:0/1 will be energized i.e.it goes HIGH.

(f) Since, XIC C5:1/DN is now HIGH , therefore, XIO C5:1/DN inrung 0001 goes LOW, therefore, B3:0/0 goes LOW and hence thered LED stops glowing.

Rung 0004:

(a) B3:0/1 is connected as input to the output O:0/1. The output O:0/1indicates the green LED.

(b) As soon as the B3:0/1goes HIGH the output O:0/1 is energized.Hence the output green LED glows.

20

Page 27: Plc and scada report

4. Figure with explanation

Rung 0005:

(a) The input XIC I:0/1 (START switch) is connected with XIC C5:0/DN,XIO I:0/2 (STOP switch), XIC C5:1/DN, XIC C5:2/DN,XIO C5:3/DNand the binary output B3:0/2.

(b) Except C5:3/DN all the DN bits are XIC because here condition 3is checked where C5:0/DN ,C5:1/DN and C5:2/DN bits should behigh.

Figure 19: B3:0/2 is high and Yellow LED glows

(c) The output B3:0/2 is connected as input parallel to I:0/1 to make aholding circuit, so that even if the START button is released B3:0/2remains high.

(d) When the SELECTOR switch is pressed thrice, the accumulatorvalue of all the counters becomes 3. The C5:0/DN, C5:1/DN andC5:2/DN becomes HIGH.

(e) When the START switch is pressed then all the inputs in the rung0005 are HIGH, therefore, the output B3:0/2 will be energized i.e.it goes HIGH.

(f) Since, XIC C5:2/DN is now HIGH, therefore, XIO C5:2/DN in rung0001 and 0003 goes LOW, therefore, the red and green LED stopsglowing.

21

Page 28: Plc and scada report

Rung 0006:

(a) B3:0/2 is connected as input to the output O:0/2. The output O:0/2indicates the yellow LED.

(b) As soon as the B3:0/2goes HIGH the output O:0/2 is energized.Hence the output yellow LED glows.

Rung 0007:

(a) The input XIC I:0/1 (START switch) is connected with XIC C5:0/DN,XIO I:0/2 (STOP switch), XIC C5:1/DN, XIC C5:2/DN,XIC C5:3/DNand the binary output B3:0/2.

(b) All the DN bits are XIC because here condition 4 is checked whereall DN bits should be high.

(c) The output B3:0/3 is connected as input parallel to I:0/1 to make aholding circuit, so that even if the START button is released B3:0/3remains high.

(d) When the SELECTOR switch is pressed four times, the accumula-tor value of all the counters becomes 4. The C5:0/DN, C5:1/DN,C5:2/DN and C5:3/DN becomes HIGH.

(e) When the START switch is pressed then all the inputs in the rung0007 are HIGH, therefore, the output B3:0/3 will be energized i.e.it goes HIGH.

(f) Since, XIC C5:3/DN is now HIGH, therefore, XIO C5:3/DN in rung0001, 0003 and 0005 goes LOW, therefore, the red, green and yel-low LED stops glowing.

5. Figure with explanation

Rung 0008:

(a) B3:0/3 is connected as input to the output O:0/3. The output O:0/3indicates the blue LED.

(b) As soon as the B3:0/3goes HIGH the output O:0/3 is energized.Hence the output blue LED glows.

22

Page 29: Plc and scada report

Figure 20: Counters get Reset

4.5 Results

All the conditions mentioned in the objective are obtained

4.6 Future Scope

1. The project based on glowing different LEDs can be extended in industryenvironment for doing different automated tasks by usage of same set ofhardware, just by changing the program or logic stored in the PLC.

2. If the PLC is connected with SCADA using ”Device Connectivity” fea-ture, various other features like Recipe Management, Alarms etc. can beused to make the system more reliable for the industrial environment.

23

Page 30: Plc and scada report

5 Project Using SCADA: Sewage Water Treatment

5.1 Project Objective:

To design ”Sewage Water Treatment System” in Wonderware Intouch SCADA.

5.2 Software Used:

Wonderware Intouch version 9.0

Wonderware is a brand of industrial software sold by Schneider Electric.Wonderware was part of Invensys PLC, and Invensys PLC was acquired inJanuary 2014 by Schneider Electric. Wonderware software is used in diverseindustries, including: Facilities Management, Food and Beverage, Mining andMetals, Power, Oil and Gas, and Water and Waste water. Wonderware Intouchsoftware is an open and extensible Supervisory HMI and SCADA solution thatenables the rapid creation of standardized, reusable visualization applicationsand deployment across an entire enterprise. InTouch SCADA consists of threemajor programs:

1. Application Manager,

2. Window Maker

3. Window Viewer

The InTouch Application Manager organizes the applications created by theuser. InTouch Application Manager is used to create new applications, openexisting applications in either WindowMaker or Window Viewer, delete appli-cations, and run the InTouch DBDump and DBLoad Tagname Dictionary utilityprograms. It also is used to configure Window Viewer as an NT service, to con-figure Network Application Development (NAD) for client-based and server-based architectures etc.

Window Maker is the development environment, where object-oriented graph-ics are used to create animated, touch-sensitive display windows. These displaywindows can be connected to industrial I/O systems and other Microsoft Win-dows applications.

Window Viewer is the run time environment used to display the graphicwindows created in Window Maker. Window Viewer executes InTouch QuickScripts, performs historical data logging and reporting, processes alarm loggingand reporting, and can function as a client and a server for DDE communicationprotocols.

24

Page 31: Plc and scada report

5.3 Working of Project:

The project is made in Window Maker and executed in Window Viewer. Inwindow viewer, the project would run as:

When the START switch is turned on, water from the storage tank flowsto the sedimentation tank after passing through the screening filter. As soonas the sedimentation tank is filled the rotator inside the tank is turned on soas to deposit the sediments at the bottom of the tank. Next, clean water fromthe sedimentation tank is transferred to the chlorine tank where the water ischlorinated to kill the germs and make it fit for drinking. Next, the water isoxygenated by passing oxygen gas into it in the chlorine tank. The water fromthe chlorine tank is filtered and stored in another tank for usage.

5.4 Programming:

1. In the Intouch Application Manager, we select file → New → Create newApplication. This creates a new Intouch application.

2. When we double click on this application, it opens Intouch Window maker.

3. In Window maker we select File →New Window. A dialog box appearsasking for name, window type, window color and other properties.

4. We name the window as ”sewage water treatment”, window type as re-place, frame style as single and click on OK. A window appears as perdefined by us.

5. Next we click on the wizard icon. The Wizard Selection window appearsin which there are various options of the graphical objects.

6. We select fixture switches from the Switches option of the Wizard selec-tion window. The rest all other graphical objects will be picked from thesymbol factory option.

7. In the Wizard Selection window, we select symbol factory option and thendouble click it. This opens the symbol factory window.

8. In the symbol factory window there are various categories of the graphicalobjects like Tanks, agitator wheels etc. We select the different objects asper our requirement.

9. For all the objects taken from the symbol factory, we perform ”BreakCell” operation so that we are able to change their properties as per our re-quirement Following is the figure showing the list of the properties avail-able for each object from Symbol Factory:

25

Page 32: Plc and scada report

Figure 21: Schematic of Object Properties

10. For our project we require tanks, pipes, valves, agitators etc. these objectsare picked up the symbol factory and other objects like screening filter etc.are built by us using the basic shapes and some like the oxygen bubblesand the sediments are picked by performing ”break symbol” operation onvarious objects of general manufacturing option (e.g. coal mining).

11. Next we place the objects as per the setup required for water treatment andmodify the objects property. For example, when water is to be transferredfrom one tank to the other the source tank must be full initially and theliquid level of the source tank should decrease steadily and water level inthe destination tank should increase steadily in the destination tank.

12. For this we double click on the tank, select ”vertical” under ”fill” option.We give the tag name A and then specify the values of maximum andminimum fill percentages along with the values of the ’A’.

13. Similarly other properties of the objects are changed.

14. The finished window is shown as below:

26

Page 33: Plc and scada report

Figure 22: Window in develpoment mode in Window maker

15. We see that we need to use duplicate of the tanks and rotators in caseof sedimentation and oxidation tank because a tank once filled cannotbe emptied and a rotator once rotated cannot be stopped. Hence theirduplicates are used keeping in mind their visibility.

16. Visibility is a property which is required when we want to use the sameproperties of an object for more than once with different values of tagname. In Intouch this is not allowed, therefore we make duplicate of theobject, then modify their properties and apply the visibility property.

17. Visibility comes under the category of miscellaneous property. Other mis-cellaneous property which we have used in this project is ”orientation”.We have used this property to show the rotation of the agitators. Otherproperty called ”blink” is used to show oxygenation of water by produc-ing blinking effect in the bubbles.

18. Moreover, the pipe color needs to be grey initially, blue when water passesthrough it and then again it should be grey. This is done by applying theproperty ”analog fill color”. This property enables us to define color atvarious break points.

19. Since there is no manual work i.e. no slider is being used, window scripthas to be used for incrementing the value of the counter, whose tag nameis used as the expression for all other objects.

20. The script written for this project is shown below:

27

Page 34: Plc and scada report

Figure 23: Schematic of Window Script used

(a) There are two parts in the script:

(b) On Show: how the things should appear as soon as the windowviewer is started.

(c) While showing: how things will appear once the task starts to runon window viewer.

21. As shown in the figure the window script follows simple ”if- else if- else”with logical operators ”and-or-not”.

22. In the script we can see that the value of A is incremented when its valueis less than 105, the START switch is kept on and the STOP is off. Theincrement is done in 1000 millisecond period. This can also be decreasedto increase the speed of execution.

23. As soon as the value of A becomes equal to 105, the value of A is reset to

28

Page 35: Plc and scada report

0 and the process repeats itself in an infinite loop until the STOP switchis pressed on.

24. Now, we test our project in window viewer. For this we click on ”Run-time!” icon at the top right corner of the tool bar.

25. This option takes us to the run- time environment. As soon as WindowViewer is started we see that it follows the instructions of ”On Show” untilthe switch is turned on. As soon as the switch is turned on, it follows theinstructions of ”While Showing”.

26. In case we find some anomaly in execution, we need to first switch toWindow Maker for rectifying it. For this we click on the ”development!”icon placed at the top right corner of the Window Viewer.

27. We can change our script and properties of the various objects used inWindow Viewer but test its execution in Window Maker. The functionsof both are different.

28. The following snapshot shows the execution of the program:

(a) Transfer of sewage water from the storage tank to the sedimentationtank.

Figure 24: Sedimentation of water

(b) Oxygenation and chlorination of water in the chlorine tank after itssedimentation.

29

Page 36: Plc and scada report

Figure 25: Oxygenation and chlorination of water

(c) Chlorinated water is being passed through a filter and stored in an-other tank for usage.

Figure 26: Passing water through filter

29. This process continues to execute repeatedly until the STOP switch isturned on.

30

Page 37: Plc and scada report

5.5 Results

The design of ”Sewage Water Treatment System” is successfully implementedin Intouch SCADA.

5.6 Future Scope

1. This project can be implemented practically when SCADA is connectedwith PLC. More enhanced features can be added up to it. For e.g. ReverseOsmosis purification system can be added.

2. The project based on sewage can be extended to water purification sys-tems, oil refinery systems in industries.

3. The project can also be extended to packaged drinking water industrieswhere water is first purified, then filled into bottles, capped, labelled andthen sold in bottles.

31

Page 38: Plc and scada report

6 CONCLUSION

With the speed of changing technology today it is easy to lose sight or knowl-edge of the basic theory or operation of programmable logic. Most people sim-ply use the hardware to produce the results they desire. Hopefully, this reporthas given the reader a deeper insight into the inner workings of programmablelogic and its role in mechanical operations. The idea of programmable logic isvery simple to understand, but it is the complex programs that run in the lad-der diagrams that make them difficult for the common user to fully understand.Hopefully this has alleviated some of that confusion.

SCADA is used for the constructive working, using a SCADA system forcontrol ensures a common framework not only for the development of the spe-cific applications but also for operating the detectors. Operators experience thesame ”look and feel” whatever part of the experiment they control. However,this aspect also depends to a significant extent on proper engineering.

32

Page 39: Plc and scada report

References

[1] Richard A. Cox, ”Technicians Guide to Programmable Controllers” , 4thedition, Vikash Publishing House, New Delhi.

[2] J. R. Hackworth, F.D. Hackworth, ”Programmable Logic Controllers Pro-gramming Methods and Applications” Pearson Education, New Delhi

[3] J. W. Webb, R A Reis , ”Programmable Logic Controllers Principle andApplications” 5th edition, Prentice Hall of India ltd., New Delhi

[4] literature.rockwellautomation.com/idc/groups

33