68
"@ Stu^y of "@ Stu^y of "@ Stu^y of "@ Stu^y of Si^^hirg[nj Si^^hirg[nj Si^^hirg[nj Si^^hirg[nj 2 2 × ×120 MW 120 MW 120 MW 120 MW P_[king Pow_r Pl[nt P_[king Pow_r Pl[nt P_[king Pow_r Pl[nt P_[king Pow_r Pl[nt of EGCB" of EGCB" of EGCB" of EGCB" 1

Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Embed Size (px)

DESCRIPTION

This report based on Power plant equipments...

Citation preview

Page 1: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

"@ Stu^y of "@ Stu^y of "@ Stu^y of "@ Stu^y of Si^^hirg[njSi^^hirg[njSi^^hirg[njSi^^hirg[nj 2222××××120 MW 120 MW 120 MW 120 MW

P_[king Pow_r Pl[ntP_[king Pow_r Pl[ntP_[king Pow_r Pl[ntP_[king Pow_r Pl[nt of EGCB"of EGCB"of EGCB"of EGCB"

1

Page 2: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

2Siddhirganj 2×120 MW Peaking Power Plant of EGCB

Page 3: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Pr_s_nt_^ \y

F[ujulF[ujulF[ujulF[ujul K[\irK[\irK[\irK[\ir

ID: 10105132ID: 10105132ID: 10105132ID: 10105132

Progr[m:Progr[m:Progr[m:Progr[m: BSEEEBSEEEBSEEEBSEEE

IUBAT - INTERNATIONAL UNIVERSITY OF BUSINESS

AGRICULTURE & TECHNOLOGY

Date: 23th August, 2014

3

Page 4: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Cont_nts� Introduction

� Introduction

� Objectives

� Organizational Overview� About EGCB Ltd.

� Mission, Vision and Quality Policy

� Siddhirganj 2×120 MW Peaking Power Plant

� Power Generation

4

� Power Generation� Cycle used in Gas Turbine Power Plant

� Gas Booster Compressor

� Gas Booster Compressor Layout

� Gas Turbine� Gas Turbine Layout

� Inlet Air Filter House

� GT Accessories Compartment

� Compressor

� Combustion System

� Turbine

Page 5: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

� Gas Turbine Generator� Gas Turbine Generator

� Gas Turbine Generator Details

� Excitation System

� Sub Station� Single Line Diagram

� Power Transformer

� Auxiliary Transformer

� Instrument Transformer

� Buchholz Relay

Cont_nts

� Buchholz Relay

� Switchgear� Air Break Circuit Breaker

� Vacuum Circuit Breaker

� SF6 Circuit Breaker

� Operation� Starting Procedure

� Synchronization

� Shut Down Procedure

� Daily Generation Report

� Conclusion

5

Page 6: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Intro^u]tionIntro^u]tion

6

Intro^u]tionIntro^u]tion

Page 7: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Intro^u]tion

� In the 21st century, the dependency on electricity is like the air

on breathe. Now a days it's become a part and parcel of our daily

life. During a power failure, our daily life becomes obsolete.

Considering the present power crisis in Bangladesh, Siddhirganj

2×120 MW Peaking Power Plant of EGCB is producing about 240

MW power to the national grid.MW power to the national grid.

� During the practicum training period in Siddhirganj 2×120 MW

Peaking Power Plant I have gathered knowledge about GE Frame

9E Gas Turbine, Generator, Gas Booster Compressor, Control

Panel, LT & HT Switchgear, Power Transformer, Sub Station and

also the related machines. As I was thirsty about how electricity

generates, now I'm very much pleased to see the process.

7

Page 8: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

O\j_]tiv_

� General Objective

To extrovert my theoretical knowledge into the practical

field with adequate conceptualization.

� Specific Objective

� Study on Gas Turbine, Gas Booster Compressor, Generator,

Transformer, Switchyards

� Study on Switchgear and Protective Relays

�Maintenance of Electrical Machines (LV & MV) and

Equipment's

8

Page 9: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Org[niz[tion[lOrg[niz[tion[l

Ov_rvi_wOv_rvi_w

9

Ov_rvi_wOv_rvi_w

Page 10: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

@\out EGCB Lt^.

� On 23rd November 1996 BPDB formed Meghnaghat Power

Company (MPC) Ltd.

� On 16th February 2004 the Meghnaghat Power Company (MPC)

Ltd. has been re-named as Electricity Generation Company of

Bangladesh (EGCB) Ltd.

� The company's major share is currently held by BPDB.� The company's major share is currently held by BPDB.

Corporate Office Site Office

BTMC Bhaban Siddhirganj, Narayanganj7-9, Kawran Bazar, Dhaka - 1215 Tel: 02-7694100Tel: +88-02-9134029, +88-02-9134032 Fax: 02-7694100Fax: +88-02-9118345Email: [email protected]

[email protected]

10

Page 11: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

� Mission

"To excel in electricity business by generation efficient, reliableand cost effective electricity in an environmentally responsiblemanner to satisfy our customers"

� Vision

"Generation of quality electricity for the betterment of theNation“

� Quality Policy

"EGCB is engaged in power generation business. To ensure thisEGCB will establish, operate and maintain generation facilities ina cost effective manner. In this process EGCB shall develop andmaintain its human, organizational, technological and materialresources to ensure continued suitability. The policy will bereviewed from time to time for its continual improvement."

11

Page 12: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Si^^hirg[njSi^^hirg[njSi^^hirg[njSi^^hirg[nj 2222××××120 MW P_[king 120 MW P_[king 120 MW P_[king 120 MW P_[king

Pow_r Pl[ntPow_r Pl[ntPow_r Pl[ntPow_r Pl[nt

Contractor : Bharat Heavy Electricals Limited (BHEL), India

Customer : BPDBCustomer : BPDB

Location : Siddhirganj, Narayanganj

Area : 4.17 acres

No. of Unit : 2 (Two)

Capacity : 211.76 MW (2 x 105.88 MW)

Fuel : Natural Gas

Commercial Operation Date : 5 February, 2012

12

Page 13: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Pow_rPow_r

G_n_r[tionG_n_r[tionG_n_r[tionG_n_r[tion

13

Page 14: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[s Boost_r Compr_ssor

Gas Booster Compressor (GBC) is used to improve

the supplied fuel gas pressure. During this process,

the density of the gas is increased.

Gas Booster Compressor is having divided in Gas Booster Compressor is having divided in

Three segments…

� Induction Motor

�Gear Box

� Centrifugal Compressor

14

Page 15: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Compressor DetailsCompressor Type : BCL406

Normal Capacity : 33086 Nm3/hr

Normal Speed : 11396 rpm

First Critical Speed : 5800 rpm

Power Required : 1562 KW

Casing Design Temp : 1500C

Compression Ratio : 2.6

Suction Pressure : 10.73 Kg/Cm2

Discharge Pressure : 26.85 Kg/Cm2

Casing Discharge Pressure : 29.0 Kg/Cm2Casing Discharge Pressure : 29.0 Kg/Cm2

Gear Box DetailsRated Power : 2222 KW

Input/output speed : 1485/11366

Pin /Gear : 26/199

Induction Motor DetailsKW : 2020 KW

Stator Volts : 6600 Volt

Stator Amps : 209 amps

Rpm : 1492 rpm15

Page 16: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

L[yout of G[s Boost_r

Compr_ssor

16

Page 17: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[sG[s

Tur\in_Tur\in_

17

Page 18: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Cy]l_ us_^ in G[s Tur\in_ Pow_r

Pl[nt

18

Gas Turbine operates on Brayton Cycle. Brayton cycle ishaving divided in four segments namely –

� Compression (Axial Flow Compressor)

� Heat Addition (Combustion Chamber)

� Expansion (Turbine)

� Exhaust (Atmosphere)

Page 19: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G_n_r[l F_[tur_s

GT Model series : MS 9001

Model : PG 9171 E

GT rating : 108.6 MW

Cycle : Simple Cycle

Compression Ratio : 12.7Compression Ratio : 12.7

No. of Compressor Stages : 17 (Seventeen)

No. of Turbine Stages : 03 (Three)

No. of Combustors : 14 (Fourteen)

RPM : 3000

Fuel : Natural Gas

NOx control : Dry Low NOx

19

Page 20: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[s Tur\in_ L[yout

20

Page 21: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[s Tur\in_ Cross S_]tion[l Vi_w

21

Page 22: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Inl_t @ir Filt_r Hous_

22

Page 23: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Inl_t @ir Filt_r

1st Stage Filter

No. of Filters : 390

Type of Filter : Bag Filter

Initial Pressure Drop : 45 Pa

23

Initial Pressure Drop : 45 Pa

2nd Stage Filter

No. of Filters : 390

Type of Filter : Cam GT

Initial Pressure Drop : 145 Pa

Page 24: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

GT @]]_ssori_s Comp[rtm_nt

24

Page 25: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[s Tur\in_ Constru]tion[l

F_[tur_s

Gas Turbine mainly divided in Three sections…

� Compressor

25

� Compressor

� Combustion System

� Turbine

Page 26: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Compr_ssor

Compressor Casing consists of –� Inlet Guide Vane

� 17 Stages of Rotor and Stator Blades

� 2 Exit Guide Vanes

Inlet Guide Vane (IGV)Inlet Guide Vane (IGV)

26

Page 27: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Compr_ssor Rotor

27

Stages 5, 6, 7 & 8 compressor rotor blades are coated with specialized

material to avoid corrosion due to moisture formation at this region

Page 28: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Compr_ssor St[tor

Inlet Casing

Forward Compressor Casing

Aft Compressor Casing

28

Compressor Stator Casing

Aft Compressor Casing

Compressor Discharge Casing

Page 29: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Compressor Stator and Stator Blades

29

Page 30: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

�Reverse Flow Type

�14 Combustion Chamber

�Combustion Liners

�Flow Sleeves

Com\ustion Syst_m

�Flow Sleeves

�Transition Pieces

�Cross Fire Tubes

�Flame Detectors

�Fuel Nozzles

�Spark Plugs

30

Page 31: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Com\ustion Ch[m\_r L[yout

31

Page 32: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Com\ustor

32

Page 33: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Com\ustion Ch[m\_rs Compon_nts

33

Cross Fire Tube

Page 34: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Tur\in_

Rotor� Buckets

StatorTurbine Shell� Turbine Shell

� Turbine Nozzles

� First Stage Nozzle

� Second Stage Nozzle

� Third Stage Nozzle

� Diaphragms

� Shrouds

34

Page 35: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Tur\in_ Rotor

35

Page 36: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Tur\in_ St[tor

36

Page 37: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Exh[ust Fr[m_ [n^ Diffus_r

37

Exhaust Diffuser

Page 38: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[sG[s

Tur\in_ Tur\in_

38

Tur\in_ Tur\in_

G_n_r[torG_n_r[tor

Page 39: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[s Tur\in_ G_n_r[tor

39

Page 40: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

G[s Tur\in_ G_n_r[tor D_t[ilsType TARI 1080-36P

Manufacture BHEL, India

Drive Gas Turbine

Output power 108.6 MW

Apparent power 135750 KVA

RPM 3000

Phase 3 (Three)

40

Phase 3 (Three)

Voltage 11KV

Current 7.125 KA

Total Weight 210 Tons

Year 2008

Stator RotorVolt : 11000 Volt Volt : 370 voltAmps : 7125 amps Amp : 817 amp

Cooling Type : CACWOver Speed : 10 % Maxm

Page 41: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Ex]it[tion Syst_m

41

Page 42: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Su\ St[tion

42

Su\ St[tion

Page 43: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Singl_ Lin_ Di[gr[m

43

Page 44: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Pow_r Tr[nsform_r

44

Page 45: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Manufacture Jhansi, BHEL, India 2008

Rating 170/136/102 MVA

Rated Voltage LV-11 KV, HV-132 KV

Rated Current LV-8922.68 A, HV-

743.56A (170 MVA)

No. of Phase Three (3- ɸ)

Pow_r Tr[nsform_r D_t[ils

45

No. of Phase Three (3- ɸ)

Frequency 50 Hz

Tapping 5 (Five) Step, ± 5%

Type of Cooling OFAF/ONAF/ONAN

Connection Symbol YNd1

Maximum Temp. Rise Oil-50° C, Winding-55°

Oil 60800 Liter

Weight of Core and

Coil

94800 Kg

Total Weight 205200 kg

Page 46: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

@uxili[ry Tr[nsform_r

Manufacture Jhansi, BHEL, India

Rating 12.5 MVA

Rated Voltage LV-6.6 KV, HV-11 KV

Rated Current LV-1093.47 A,

HV-656.08 A

No. of Phase Three (3- ɸ)

46

No. of Phase Three (3- ɸ)

Frequency 50 Hz

Type of Cooling ONAF

Connection

Symbol

Dyn1

Page 47: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

St[tion @uxili[ry Tr[nsform_r

[n^ Unit @uxili[ry Tr[nsform_r

47

Manufacture Jhansi, BHEL, India

Rating 2.5 MVA

Rated Voltage LV - 0.42 KV

HV - 6.6 KV

Rated Current LV – 3436.6 A

HV – 218.6 A

Type of Cooling ONAN

Connection

Symbol

Dyn11

Manufacture Jhansi, BHEL, India

Rating 1.6 MVA

Rated Voltage LV - 0.42 KV

HV - 6.6 KV

Rated Current LV – 2199.4 A

HV – 139.96 A

Type of Cooling ONAN

Connection

Symbol

Dyn11

Page 48: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Instrum_nt Tr[nsform_r

48

Current TransformerCT Ratio is 1200/1 for overcurrent protection and 800/1for differential protection.

Potential TransformerPT Ratio is 1200/1 for overcurrent protection and 800/1 fordifferential protection.

Page 49: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Bu]hholz R_l[y

49

Page 50: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Lightning @rr_st_r [n^ Isol[tor

50

Page 51: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Swit]hg_[r

51

Swit]hg_[r

Page 52: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Swit]hg_[r P[n_l

52

Page 53: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

@ir Br_[k Cir]uit Br_[k_r

The air at atmospherepressure is used as an arcextinguishing medium inAir Break Circuit Breakers.

53

Air Break Circuit Breakersare used in DC circuits andAC Circuits up to 12 kV.

Page 54: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

V[]uum Cir]uit Br_[k_r

A vacuum circuit breaker issuch kind of circuit breakerwhere the arc quenchingtakes place in vacuum.

54

The vacuum circuit breaker istoday recognized as mostreliable electric currentinterruption technology formedium voltage switchgear.

Page 55: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

SF6 Cir]uit Br_[k_r

A circuit breaker in which theelectric current carryingcontacts operate in sulphurhexafluoride or SF6 gas is knownas an SF6 circuit breaker.

55

Due to its high dielectricstrength and high cooling effectSF6 gas is approximately 100times more effective arcquenching media than air.

Page 56: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Tr[nsmitt_r [n^ G[ug_

Pressure transmitter is used for

measuring differential pressures with

a 4-20 mA current loop output signal.

In a level transmitter, the averaged

56

In a level transmitter, the averaged

value from the microprocessor is

converted into an analog 4 to 20 mA

signal which is linear with the liquid

level.

Pressure gauges are devices used for

measuring the pressure of a gas or

liquid.

Page 57: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Op_r[tion

57

Op_r[tion

Page 58: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

C_ntr[l Control Room

58

Page 59: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

St[rting Pro]_^ur_

� Start GBC lube oil pump.

� Start GBC cooling water pump and fan.

� Start GBC.

� Start-up Command.

� Cranking (Starting) Motor Starts with in 15-30 Second.� Cranking (Starting) Motor Starts with in 15-30 Second.

� Turning-Gear Stopped instantaneously.

� Turbine starts speed-up with the help of Torque Converter(TC).

� At 600 RPM Speed starts decreasing by TC.

� If discharge pressure is more than 23 bar then start GT. (Butfirst GT should already be running on turning gear 6 RPM)

59

Page 60: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Continu_…

�After GT start then firing take place at 450 rpmand speed rises to 3000 RPM. [FSNL – Full SpeedNo Load]

� Take permission from grid to synchronization of GT.

� Then finally synchronized. (If frequency is high, more� Then finally synchronized. (If frequency is high, morethan 50.3 Hz, then grid request to reduce thefrequency)

� After synchronization observe all the parameters. Ifparameters is ok then raise load depending on gaspressure.

60

Page 61: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Syn]hroniz[tion

61

Page 62: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Shut Down Pro]_^ur_

� Load decrease to minimum.

� Shut down command.

� Unit breaker open& RPM starts decreasing.

� At 2850 RPM:

� Auxiliary oil pump start.

62

� Auxiliary oil pump start.

� Hydraulic oil pump start.

� Lift (Jacking) oil pump start.

� IGV start closing.

� At about 100 RPM turning gear start and hold the

turbine rotor to keep on 100 RPM by TC.

� To put other lift oil pump stand-by position.

Page 63: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Som_ Working Mom_nts

63

Page 64: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

D[ily G_n_r[tion R_port

64

Page 65: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Con]lusion

65

Con]lusion

Page 66: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

Con]lusion

� From my internship I acquired practicalknowledge about power system engineering andits equipments.

� Most importantly I have gathered practical� Most importantly I have gathered practicalexperience on how electricity is generated.

� Therefore, I believe I made good achievementswith my industrial training which will help me a lotin my future.

66

Page 67: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

67

Page 68: Presentation on Siddhirganj 2×120 MW PPP of EGCB_Faujul Kabir

68