Mark Rannel Reynosa Gamayo – Project Portfolio Page 1
Project Portfolio
Position: Project Leader Electrical Engineer -Mineral Metal Group (Lao PDR)- July 2012 to present
www.mmg.com
Mining area and Gold /Copper Process area
• BASF Flocculant Mixing Plant 100T EconoPak Powder Hopper ($ 200K Capex)
• Spintek filter instrumentation monitoring system for solvent extraction ($ 250K Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 2
• Sitewide Lightining wave siren alarm system ($ 150K Capex)
• Pyrite repulping screen for floatation ($ 1.5M Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 3
• 350meter cubic per day Nano filtration plant ($750K Capex)
• Acid unloading and distribution line upgrade for Leach solution area ($ 300K Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 4
• Sepon Copper sustain - new scrubber plant (detail design and procurement stage) ($20M
Capex)
• New Poly ferric Sulphide facilities for surge tank ($500K Capex)
• New Pregnant leach solution pond installation ($ 500K Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 5
• Edge strip pusher stripping copper machine ($150K Capex)
• Khanong primary copper plant refurbishment of Gold process to copper circuit ($800K
Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 6
• Counter current decantation instrumentation, installation of gamma ray density meters and
bed level instruments Hawk Orca. ($400K Capex)
• 63KA Rectiformer installation for electrowinning process ($6M Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 7
• 6MW high pressure Boiler system for POX ($1.3M Capex)
• Pyrite and Screen Belt pumps and motor upgrade ($ 50K capex)
• 22kV transmission lines diversion and construction for Mining areas ($ 800K Capex)
• Stage 2 Hinsom Residential 1500 bed accommodation Camps (feasibility)
• Sepon LXML MMG Rural Airport upgrading ($ 150K Capex)
• 2 Sty 2000sqm Building for Mining explorations and administration offices. ($ 5M Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 8
• Cementation process plant and 2nd cone upgrade for iron exchange ($5M Capex)
• Raw water Lamella clarifier plant for gold process facility service. ($ 1M Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 9
• Gold Desorption process line rebuild due to fire damage ($1.2M Capex)
• Hydrated repulping mixing Lime Transmin plant ($800k Capex)
• Copper and gold corrosion mitigation works ($ 150k Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 10
• 22kv overhead line autorecloser 4 sets installation ($250K Capex)
• CCTV site wide upgrade for Camps, Plants . ($ 150K capex)
• Padan Mess hall 1500 seats Ventilation and air-condition system ($500K Capex)
• Relocation of 2 Sets of 1.5MVA substation for decant pump line facilities ($ 300K Capex)
Mark Rannel Reynosa Gamayo – Project Portfolio Page 11
Position: Executive Electrical Engineer at Beca (Singapore) - Oct 2007 to June 2012 www.beca.com
COMMERCIAL
• NUS UNIVERSITY TOWN- Discipline leader Engineer for Electrical Design, ELV system,Public
address and Infrastructure electrical interfacing, design for main wire centre and sub wire
centre with IT/Data infrastructure for offices and student bedroom use. For 2 blocks of 19th
storey Residential Hostel and Teaching facilities. Capital overall cost $101M
• NUS UNIVERSITY TOWN BRIDGE- Discipline leader Engineer for Electrical Design, ELV
system, and Infrastructure. Capital overall cost $50M
Mark Rannel Reynosa Gamayo – Project Portfolio Page 12
• CHANGI BUSINESS PARK RETAIL MALL-Discipline leader Engineer for Design and Build of 3
block of 3rd Storey Retail Mall building electrical,high tension reticulation and ELV services at
Changi rd (Singapore).
• CHANGI BUSINESS PARK HOTEL- Discipline leader Engineer for Design and Build of 1 block of
12th Storey 5 Star Hotel building electrical and ELV services at Changi rd (Singapore).
• MAPLE TREE ANSON ONE – Discipline leader Engineer for Design and Build of building
electrical services for 19TH storey high end office building at Anson Rd(Singapore).
Mark Rannel Reynosa Gamayo – Project Portfolio Page 13
• MARINA KEPPEL BAY WET BERTH - Discipline leader Engineer for Design and Build Major
Addition and Alteration for redevelopment of Marina Wet Berth Plot 5(Singapore).
• CONRAD (Dubai)- Support engineer for HT/ LV distribution layout and computations for
Hotel,Podium facilities.
Mark Rannel Reynosa Gamayo – Project Portfolio Page 14
• SENTOSA RESORTS WORLD- MARITIME MUSEUM – Support Engineer for Design of electrical
building services deliverables(Singapore) for theme park design.
• SENTOSA RESORTS WORLD –UNIVERSAL STUDIO SINGAPORE (MUMMY REVENGE) Support
Engineer for Design of electrical building services deliverables for theme park design.
Mark Rannel Reynosa Gamayo – Project Portfolio Page 15
RESIDENTIAL
• THE LUXURIE KEPPEL HOMES SENGKANG - Discipline leader Engineer for Design and Build
of 10 blocks of 15th Storey building electrical services high end-condominium at
Sengkang/Compass Vale (Singapore).
• SKY VILLE DAWSON C1 HOUSING DEVELOPMENT BUIDLING- Discipline leader Engineer for
Design and Build of 3 blocks of 47th Storey building electrical services high end-condominium
at Dawson rd (Singapore).
Mark Rannel Reynosa Gamayo – Project Portfolio Page 16
• SOLEIL@ SINARAN DRIVE- Discipline leader Engineer for Design and Build of 2 blocks of 36th
Storey building electrical services high end-condominium at Sinaran Drive Rd (Singapore).
• MADISON RESIDENCE – Discipline leader Engineer for Design and Build of building electrical
services for 19TH storey high end condominium at Bukit Timah Rd(Singapore).
Mark Rannel Reynosa Gamayo – Project Portfolio Page 17
• THE TRILLIUM - Discipline leader Engineer for Design and Build of building electrical services
for 3 blocks of 28TH storey high end condominium at Kim Seng Rd (Singapore)..
Mark Rannel Reynosa Gamayo – Project Portfolio Page 18
Position:Project Electrical Engineer at Solutions Group International (Philippines)
www.sgiworldwide.com
Projects involved and handled:
� AMERPHIL INC- Design and estimate of Electrical, Intercom, Fire alarm, Wireless
connection ,CATV systems of Proposed 5 story 4 star Hotel in Coron Palawan Philippines
� CHILDREN CHANCE FOR TOMMORROW FOUNDATION INC.
HTTP://WWW.CCFTFOUNDATION.ORG/MODEL_FACILITY.HTML
� Design and build for upgrade of primary power to 300KVA loading Upgrading of 7.6KV
single phase line to 13.2KV 3phase transmission line (Small Grid Coron Palawan)
� As built design and rectification supervision of electrical works
� Design,Build and Construction implementation of Electrical System for 2 Swimming pool ,
School foundation (Resort)
� Design of 100 sets of roadway lighting for 7 Hectare vicinity
� Rectification and upgrade Children chance for Tomorrow Inc 7 hectare orphanage vicinity
Coron Palwan Philippines
Mark Rannel Reynosa Gamayo – Project Portfolio Page 19
Position:Project Electrical Engineer at Solutions
Design coordinates incorporated www.dci.com.ph
Projects involved and handled:
� WEST PARC CONDOMINIUMS(3 BLOCKS OF CLUSTERED TYPE 15 STOREY BUILDING)-
Construction Project Engineer for electrical building services
• SERENDRA CONDOMINIUM PHASE 1A (6 BLOCKS OF CLUSTERED TYPE 9 STOREY BUILDING) -
Construction Project Engineer for electrical building services