Upload
brendan-oconnor
View
163
Download
0
Embed Size (px)
Citation preview
78
28
25
28
1
9
1817
18
19
32
9
29
20
17
10
11
12
15
3
2
1011
12
6
7
5
8
21
1415
16
1317
16
21 500
Exit
Exit
81Exit
81A
536ORLOVISTA
Pop. 185,951
Pop. 1,901
Fairvilla
ORLANDO
EXECUTIVE
AIRPORT
C 188
ORLANDO
HillsPine
Exit 86
Exit 85
84
Exit
Conway
Mann
Clear L.
Holden
L.
Lancaster
Lake
L.
Barber
Fairview
Little
L.
Lake
L.
Rock L.
L.
L.
Ivanhoe
L.
Mizell
Lake
Virginia
L. Berry
Baldwin
L.
Susannah
L.
L.
Underhill
Lake
Little Lake
Conway
L. Sue
Silver
Wekiva
Lawne
Barton
LakeCatherine
L.
Giles
Arnold
L.
L. Porter
L.Gatlin
Bass L.
L.
Exit
9
Exit
11
Exit13
East West Expressway Exit14
Exit87
Exit 84
Exit 82
Exit 79
15506
50
15
552
15
15527
TOLL
408
526
423
426
92
17
527
441
416
438
523
17
92
EDGEWOOD
500
4
526526
424A
424
15
400
DEPARTMENT OF PUBLIC WORKS
CITY OF ORLANDO
CI
TY
O
FORLANDO,
F
LO
RI
DA
"T
HE
CITY BEAU
T
IF
UL
"
CITY COUNCIL OF ORLANDO
DISTRICT 2
MAYOR BUDDY DYER
DISTRICT 5
DISTRICT 4
DISTRICT 6
R-
29-
E
R-
30-
E
LOCATION MAPN.T.S.
NOTE: THE SCALE OF THESE PLANS MAY
HAVE CHANGED DUE TO REPRODUCTION.
TO BE SUBMITTED TO:
1
SHEET NO.SHEET NO. DESCRIPTION
KEY SHEET
TYPICAL SECTIONS
DISTRICT 3
FROM CONCORD AVE. TO ORANGE AVE.
FINANCIAL PROJECT ID 434915-1-58-01
FAN 8886-572 A
DISTRICT 1
COMMISSIONER JIM GRAY
COMMISSIONER TONY ORTIZ
COMMISSIONER ROBERT STUART
PREPARED BY :
COMMISSIONER SAMUEL B. INGS
Maitland, Florida 32751
Phone: 407.644.7755
2603 Maitland Center Parkway, Suite B
Certificate of Authorization No.: 00009544
Fax: 407.644.7855Scott P. Seck, P.E. 53215
FAX: 407-644-7855
PHONE: 407-644-7755
MAITLAND, FL 32751
2603 MAITLAND CENTER PKWY, STE B
HORIZON ENGINEERING GROUP, INC.
SCOTT SECK, P.E.
FEBRUARY 2016
PROJECT MANAGER, JOHN ROGERS, P.E.
DEPUTY DIRECTOR OF PUBLIC WORKS, CHARLES RAMDATT, P.E.
DIRECTOR OF PUBLIC WORKS, RICK HOWARD, P.E.
PROJECT NO: TSP0036P
STA 100+00.00
BEGIN PROJECT
COMMISSIONER REGINA HILL
COMMISSIONER PATTY SHEEHAN
(COLONIAL DRIVE OVERPASS)
ORLANDO URBAN TRAIL
2-5
SHOP DRAWINGS
T-22-S
T-23-S
STA 215+10.92
END PROJECT
B1-01 - B1-03 BRIDGE PLANS
RP-01
CCTV PLANSTV-1 - TV-3
RP-02 SIGNING & PAVEMENT MARKINGS, LANDSCAPE /
PLAN & PROFILES, CROSS SECTIONS
SHEET NO. DESCRIPTION
INDEX OF ROLL PLOTS
INDEX OF 11x17 DRAWINGS
R-1 - R-3
6-9
HARDSCAPE PLAN, LIGHTING PLAN
SPECIAL SIGN DETAILS
RENDERINGS- DAYTIME, EVENING & SKYLINE
3/22/2016 3:04:15 PM X:\7030715_SR50_Ped_DB\43491515801\roadway\TYPSRD01.DGNmdschwartz
BY:DATE:
DATE:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
SURVEYED BY:
DESCRIPTION
REVISION
ENGINEER'S CERTIFICATION
date for the City Of Orlando Public Works Department.
compliance with the design standards and criteria in effect on this
I hereby certify that the attached plans and design are in general
"T
HE
CITYBEAUT
IFU
L"
CIT
YOF
ORLANDO,FLO
RID
A
DATESIGN OFF
CLIENT
PM/CM
BC
PM/CMDM
PM
CM
OTHERS Professional Engineer No. 53215
PROJECT MANAGER
NO.
SHEET
MDS
MDS
SPSSCOTT SECK, P.E. Maitland, Florida 32751
Phone: 407.644.7755Certificate of Authorization No.: 00009544
Fax: 407.644.7855SCOTT P. SECK, P.E. NO. 53215
2603 Maitland Center Pkwy., Suite B
FEBRUARY/2016
TYPICAL SECTION
TRAIL PAVEMENT DESIGN
I-4 ULTIMATE POND P-15
FDOT PROPERTY
12'
11'
STANDARD CLEARING
AND GRUBBING
SODSODVARIES
2' SHLDR
0.020.04
2' SHLDR
VARIES
NATURAL GROUND
PROPOSED GRADEPOND P-15 I-4 ULTIMATE
XXXXXX
VA
RIE
S
VA
RIE
S
PGL
0.02
12'
11'
AND GRUBBING
STANDARD CLEARING
I-4 ULTIMATE POND P-15
FDOT PROPERTY
NATURAL GROUND
PROPOSED GRADEPOND P-15 I-4 ULTIMATE
SOD
5'VARIES
SOD
VARIES
100 SERIES
{ CONSTRUCTION200 SERIES
{ CONSTRUCTION
12'
STABILIZATION LBR 40
TYPE B
AND W/3'x3' SCORE PATTERN
WITH 6x6 2.1 WWF (TYP.)
4" THICK CLASS 1 CONCRETE
TRAIL PAVEMENT DESIGN
FOR TRAIL SLAB ON WALL
SEE STRUCTURAL PLANS
100 SERIES
{ CONSTRUCTION
STA 200+92.22 TO STA 203+82.22
STA 101+32.22 TO STA 105+72.16
TYPICAL SECTION NO. 2
FOR DETAILSSEE STRUCTURAL PLANS
EXIS
T
R/
W
EXIS
T
R/
W
STA 105+72.16 TO STA 107+15.88
STA 100+00.00 TO STA 101+32.22
TYPICAL SECTION NO. 1
2
PGL
PGL
3/22/2016 3:04:16 PM X:\7030715_SR50_Ped_DB\43491515801\roadway\TYPSRD01.DGNmdschwartz
BY:DATE:
DATE:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
SURVEYED BY:
DESCRIPTION
REVISION
ENGINEER'S CERTIFICATION
date for the City Of Orlando Public Works Department.
compliance with the design standards and criteria in effect on this
I hereby certify that the attached plans and design are in general
"T
HE
CITYBEAUT
IFU
L"
CIT
YOF
ORLANDO,FLO
RID
A
DATESIGN OFF
CLIENT
PM/CM
BC
PM/CMDM
PM
CM
OTHERS Professional Engineer No. 53215
PROJECT MANAGER
NO.
SHEET
MDS
MDS
SPSSCOTT SECK, P.E. Maitland, Florida 32751
Phone: 407.644.7755Certificate of Authorization No.: 00009544
Fax: 407.644.7855SCOTT P. SECK, P.E. NO. 53215
2603 Maitland Center Pkwy., Suite B
FEBRUARY/2016
3
TYPICAL SECTION
SIDEWALK PAVEMENT DESIGN
4" THICK CLASS 1 CONCRETE
EXIS
T
EA
SE
ME
NT
EXIS
T
EA
SE
ME
NT12'
200 SERIES
{ CONSTRUCTION
STANDARD CLEARING
AND GRUBBING
6'
300 SERIES
{ CONSTRUCTION
18.33'
SOD
NATURAL GROUND
25'
EASEMENT
RAILROAD R/W STEELHOUSE PROPERTY
1'
LEVEL
1:4 TYPICAL
1:2 TYPICAL
1.5'
12" DEEP SWALE
STA 300+00.00 TO STA 302+49.25
STA 206+78.47 TO STA 208+96.69
TYPICAL SECTION NO. 4
FOR DETAILSSEE STRUCTURAL PLANS
200 SERIES
{ CONSTRUCTION
12'
STA 203+82.22 TO STA 206+78.47
TYPICAL SECTION NO. 3
FOR DETAILSSEE STRUCTURAL PLANS
PGL
PGL
PGL
CLEARANCE OVER RR TRACKS 24'-3" VERTICAL
3/22/2016 3:04:17 PM X:\7030715_SR50_Ped_DB\43491515801\roadway\TYPSRD01.DGNmdschwartz
BY:DATE:
DATE:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
SURVEYED BY:
DESCRIPTION
REVISION
ENGINEER'S CERTIFICATION
date for the City Of Orlando Public Works Department.
compliance with the design standards and criteria in effect on this
I hereby certify that the attached plans and design are in general
"T
HE
CITYBEAUT
IFU
L"
CIT
YOF
ORLANDO,FLO
RID
A
DATESIGN OFF
CLIENT
PM/CM
BC
PM/CMDM
PM
CM
OTHERS Professional Engineer No. 53215
PROJECT MANAGER
NO.
SHEET
MDS
MDS
SPSSCOTT SECK, P.E. Maitland, Florida 32751
Phone: 407.644.7755Certificate of Authorization No.: 00009544
Fax: 407.644.7855SCOTT P. SECK, P.E. NO. 53215
2603 Maitland Center Pkwy., Suite B
FEBRUARY/2016
25'
EASEMENT
RAILROAD R/W STEELHOUSE PROPERTY
12'
200 SERIES
{ CONSTRUCTION
6'
300 SERIES
{ CONSTRUCTION
1.5'
1:2 TYPICAL
1:4 TYPICAL
12" DEEP SWALE
STANDARD CLEARING
AND GRUBBING
FOR DETAILSSEE STRUCTURAL PLANS
999
81
82999
351
354999
121
122999
151
152999
501
504
STANDARD CLEARING
AND GRUBBING
12'
0.02
200 SERIES
{ CONSTRUCTION
EASEMENT
STEELHOUSE PROPERTY
FOR DETAILSSEE STRUCTURAL PLANS
STA 210+54.50 TO STA 212+60.00
TYPICAL SECTION NO. 6
99982999354999122999152999504
EXIS
T
EA
SE
ME
NT
EXIS
T
EA
SE
ME
NT
EXIS
T
EA
SE
ME
NT
EXIS
T
EA
SE
ME
NT
TYPICAL SECTION 4
SYSTEM TO REMAINEXIST EXFILTRATION
SOD SOD
SOD
20'
PGL
PGL
PGL
STA 302+49.25 TO STA 304+08.62
STA 208+96.69 TO STA 210+54.50
TYPICAL SECTION NO. 5
3/22/2016 3:04:17 PM X:\7030715_SR50_Ped_DB\43491515801\roadway\TYPSRD01.DGNmdschwartz
BY:DATE:
DATE:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
SURVEYED BY:
DESCRIPTION
REVISION
ENGINEER'S CERTIFICATION
date for the City Of Orlando Public Works Department.
compliance with the design standards and criteria in effect on this
I hereby certify that the attached plans and design are in general
"T
HE
CITYBEAUT
IFU
L"
CIT
YOF
ORLANDO,FLO
RID
A
DATESIGN OFF
CLIENT
PM/CM
BC
PM/CMDM
PM
CM
OTHERS Professional Engineer No. 53215
PROJECT MANAGER
NO.
SHEET
MDS
MDS
SPSSCOTT SECK, P.E. Maitland, Florida 32751
Phone: 407.644.7755Certificate of Authorization No.: 00009544
Fax: 407.644.7855SCOTT P. SECK, P.E. NO. 53215
2603 Maitland Center Pkwy., Suite B
FEBRUARY/2016
5
AND W/3'x3' SCORE PATTERN
WITH 6x6 2.1 WWF (TYP.)
4" THICK CLASS 1 CONCRETE
TRAIL PAVEMENT DESIGN
61
99982999354
352
999122
171
999152999504
502
99982999354999122999152999504
STANDARD CLEARING
AND GRUBBING
12'
200 SERIES
{ CONSTRUCTION
EASEMENT
STEELHOUSE PROPERTY
0.02
FOR DETAILSSEE STRUCTURAL PLANS
EXIS
T
EA
SE
ME
NT
EXIS
T
EA
SE
ME
NT
STA 212+60.00 TO STA 214+50.00
TYPICAL SECTION NO. 7
2' SHLDR
61
99982999354
352
999122
171
999152999504
502
99982999354999122999152999504
STANDARD CLEARING
AND GRUBBING
12'
200 SERIES
{ CONSTRUCTION
EASEMENT
STEELHOUSE PROPERTY
0.02
EXIS
T
EA
SE
ME
NT
EXIS
T
EA
SE
ME
NT
STA 214+50.00 TO STA 215+10.92
TYPICAL SECTION NO. 8
2' SHLDR
0.04X X X X X X
TYPICAL SECTION
20'
SYSTEM TO REMAINEXIST EXFILTRATION
SYSTEM TO REMAINEXIST EXFILTRATION
SOD
SOD SOD SOD
2' SHLDR
0.04
20'
PGL PGL
202201
103
104
105
203
SL 1-16
HORIZON ENGINEERING GROUP, INC.
2603 Maitland Center Parkway, Suite B
Maitland, Florida 32751
Phone: 407-644-7755
H. SIMON HAGEDOORN, P.E. NO. 53162
Certificate of Authorization No.: 00009544
HSH 1-16
FMV 1-16
FMV 1-16
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
TRE0003-G 434915-1-58-01
shagedoorn 3/9/2016 4:26:32 PM X:\7030715_SR50_Ped_DB\43491515801\struct\B01PlanElev01_R1.dgn
CITY OF ORLANDO
CITY PROJECT NO.
ELEVATION
STATION 200+92.22
PLAN
54" BICYCLE RAILING (TYP)
MA
TC
H LIN
E S
TA.
203
+54.7
2
ELEV.
120
110
100
130
140
90
80
150
BOTTOM OF PROPOSED POND (TYP)
(TYP SOUTH APPROACH PIERS)
PPCP SUPPORTED FOOTING
STA. 203+24.72STA. 202+89.72STA. 202+54.72STA. 202+19.72STA. 201+84.72STA. 204+49.72
STA. 201+14.72
¡ PIER 1
¡ PIER 2 ¡ PIER 3 ¡ PIER 4 ¡ PIER 5 ¡ PIER 6 ¡ PIER 7
12'-
0" (C
LE
AR T
RAIL)
13'-
6" (O
UT-T
O-
OU
T)
EXISTING GROUNDLINEELEV.
120
110
100
130
140
90
80
150MSE WALL SUPPORTED TRAIL
BEGIN SOUTH APPROACH RAMP
STATION 200+92.22
BEGIN SOUTH APPROACH RAMP
(SPAN 1)
22'-6"
(SPAN 2)
35'-0"
(SPAN 3)
35'-0"
(SPAN 4)
35'-0"
(SPAN 5)
35'-0"
(RAMP 6)
35'-0"
(RAMP 7)
35'-0"
(RAMP 8)
35'-0"
98.0
97.9
95.0
91.5
PT S
TA.
200
+72.1
8
PC S
TA.
202
+89.6
8
MATC
H LIN
E S
TA. 203+54.7
2
290'-0" (OVERALL SOUTH APPROACH RAMP - MEASURED AT THE ¡ CONST.)
RR R/W
R/W
SR 50 - CITY OF ORLANDO OVERPASS
PLAN AND ELEVATION (1 OF 3)
B1-01
204 205 206 207
SL 1-16
HORIZON ENGINEERING GROUP, INC.
2603 Maitland Center Parkway, Suite B
Maitland, Florida 32751
Phone: 407-644-7755
H. SIMON HAGEDOORN, P.E. NO. 53162
Certificate of Authorization No.: 00009544
HSH 1-16
FMV 1-16
FMV 1-16
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
TRE0003-G 434915-1-58-01
fmuro 3/22/2016 2:55:36 PM X:\7030715_SR50_Ped_DB\43491515801\struct\B01PlanElev02_R2.dgn
CITY OF ORLANDO
CITY PROJECT NO.
BEGIN MAINSPAN BRIDGE FFBW
STATION 203+82.22
65’-3" (SPAN 10)
296’-3" (OVERALL MAINSPAN BRIDGE)
STATION 206+78.47
ELEVATION
PLAN
END MAINSPAN BRIDGE FFBW
STAY CABLE (TYP)
ARCHITECTURAL PYLON
BOTTOM OF PROPOSED POND (TYP)
(SOUTH MAINSPAN PIER)
PPCP SUPPORTED FOOTING
ENCLOSED HSS TRUSS
24’-
3"
(UNDER EAST TRUSS CHORD)
TOP OF OUTSIDE RAIL (MVC-1)
(UNDER WEST TRUSS CHORD)
TOP OF OUTSIDE RAIL (MVC-2)
MVC-2
MVC-1
(MAINSPAN PYLON)
PPCP SUPPORTED FOOTING
(TYP NORTH APPROACH PIERS)
SPREAD FOOTING
MA
TC
H LIN
E S
TA.
203
+54.7
2
MA
TC
H LIN
E S
TA.
207
+30.0
0
PROPOSED GROUNDLINE
EXISTING GROUNDLINE
15’-
0" (O
UT-T
O-
OU
T)
12’-
0" (C
LE
AR T
RAIL)
STAIRS
ELEV.
120
110
100
130
140
90
80
150
160
170
180
190
120
110
100
130
140
90
80
150
160
170
180
190
ELEV.
RR R/
W
RR R/
W
STA. 203+59.72
¡ PIER 8
SPAN 8)
(RAMP
35’-0"
STA. 204+47.47
¡ PIER 10
231’-0" (SPAN 11)
(SPAN 13)
35’-0"
¡ PIER 9 STA. 206+77.72
¡ PIER 11
STA. 207+12.00
¡ PIER 12
" (OVERALL NORTH APPROACH RAMP)41376’-0
91.5
95.0
97.9
98.0
1:4
1:4
RR R/
W
RR R/
W
MA
TC
H LIN
E S
TA.
203+54.7
2
203+82.97
STA.
SPAN 9)
(RAMP
22’-6"
END APPROACH RAMP BEGIN APPROACH RAMP
(STAIR LANDINGS)
SPREAD FOOTING (TYP)
PT S
TA.
203
+78.8
1
APPROACH RAMP)
290’-0" (OVERALL SOUTH
PC S
TA.
207
+15.2
1
MA
TC
H LIN
E S
TA.
207+30.0
0
(SPAN 12)
"4133’-6
24’-
3"
WALL
CRASH
MIN.
18’-0" WALL
CRASH
(NORTH MAINSPAN PIER)
SPREAD FOOTING
54" BICYCLE RAILING (TYP)
8’ DECORATIVE FENCE
STA. 207+15.00
SR 50 - CITY OF ORLANDO OVERPASS
PLAN AND ELEVATION (2 OF 3)
B1-02
5.0
’
20.0
’
25.0
’
208 209
210
SL 1-16
HORIZON ENGINEERING GROUP, INC.
2603 Maitland Center Parkway, Suite B
Maitland, Florida 32751
Phone: 407-644-7755
H. SIMON HAGEDOORN, P.E. NO. 53162
Certificate of Authorization No.: 00009544
HSH 1-16
FMV 1-16
FMV 1-16
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
TRE0003-G 434915-1-58-01
fmuro 3/22/2016 2:45:31 PM X:\7030715_SR50_Ped_DB\43491515801\struct\B01PlanElev03_R2.dgn
CITY OF ORLANDO
CITY PROJECT NO.
ELEVATION
54" BICYCLE RAILING (TYP)
(TYP NORTH APPROACH PIERS)
SPREAD FOOTING
STATION 210+54.50
PLAN
MA
TC
H LIN
E S
TA.
207
+30.0
0
ELEV.
120
110
100
130
140
90
80
150
EXISTING GROUNDLINEELEV.
120
110
100
130
140
90
80
150
STA. 207+47.00
(SPAN 13)
35’-0"
(SPAN 14)
35’-0"
¡ PIER 13
(SPAN 15)
35’-0"
(SPAN 16)
35’-0"
(SPAN 17)
35’-0"
(SPAN 18)
35’-0"
(SPAN 19)
35’-0"
(SPAN 20)
35’-0"
(SPAN 21)
35’-0"
(SPAN 22)
27’-6"
STA. 207+82.00
¡ PIER 14
STA. 208+17.00
¡ PIER 15
STA. 208+52.00
¡ PIER 16
STA. 208+87.00
¡ PIER 17
STA. 209+22.00
¡ PIER 18
STA. 209+57.00
¡ PIER 19
STA. 209+92.00
¡ PIER 20
STA. 210+27.00
¡ PIER 21
" (OVERALL NORTH APPROACH RAMP - MEASURED AT THE ¡ CONST.)41376’-0
SUPPORTED TRAIL
MSE WALL
END NORTH APPROACH RAMP
STATION 304+08.54
END SIDEWALK RAMP (FAR SIDE)
STATION 302+82.75
BEGIN SIDEWALK RAMP (FAR SIDE)
(SPAN S1)
27’-6"
STATION 302+82.75
BEGIN SIDEWALK RAMP
STATION 304+08.54
END SIDEWALK RAMP
(SPAN S2)
"2135’-3
(SPAN S3)
"2135’-3
(SPAN S4)
"4327’-8
(MEASURED AT THE ¡ SIDEWALK)
" (OVERALL SIDEWALK RAMP - FAR SIDE) 43125’-9
STATION 210+54.50
END NORTH APPROACH RAMP
12’-
0" (C
LE
AR T
RAIL)
13’-
6" (O
UT-T
O-
OU
T)
7’-
6" (O
UT-T
O-
OU
T)
6’-
0" (C
LE
AR S/
W)
12’-0" (CLEAR TRAIL)
13’-6" (OUT-TO-OUT)
(MSE WALL SUPPORTED TRAIL)
(BEGIN SIDEWALK RAMP)
SPREAD FOOTING
(END NORTH APPROACH RAMP)
SPREAD FOOTING
MA
TC
H LIN
E S
TA.
207+30.0
0
PT S
TA.
207
+43.2
1
RR R/W
R/W
PC S
TA.
208
+87.0
08’ DECORATIVE FENCE
STA. 209+20.00
STA. 210+20.00
SR 50 - CITY OF ORLANDO OVERPASS
PLAN AND ELEVATION (3 OF 3)
B1-03
3/21/2016 11:42:53 AM X:\7030715_SR50_Ped_DB\43491515801\roadway\RENDERINGS.DGNmdschwartz
NO.
SH
EE
T
SR
50
CO
LO
NI
AL P
ED
ES
TRI
AN O
VE
RP
AS
S
& S
KY
LI
NE
RE
ND
ERI
NG
S -
DA
YTI
ME,
EV
ENI
NG
R-1
3/21/2016 11:43:43 AM X:\7030715_SR50_Ped_DB\43491515801\roadway\RENDERINGS.DGNmdschwartz
NO.
SH
EE
T
SR
50
CO
LO
NI
AL P
ED
ES
TRI
AN O
VE
RP
AS
S
& S
KY
LI
NE
RE
ND
ERI
NG
S -
DA
YTI
ME,
EV
ENI
NG
R-2
3/21/2016 11:44:04 AM X:\7030715_SR50_Ped_DB\43491515801\roadway\RENDERINGS.DGNmdschwartz
NO.
SH
EE
T
SR
50
CO
LO
NI
AL P
ED
ES
TRI
AN O
VE
RP
AS
S
& S
KY
LI
NE
RE
ND
ERI
NG
S -
DA
YTI
ME,
EV
ENI
NG
R-3
SSD
48" RCP
15"
RC
P
15"
RC
P
48" RCP
6"
PV
C
WATER
WATER
SB
UM
R
R
R
R
R
R
R
UM
UM
UM
R
UM
UM VT
SB
CK
UM
]
EOI
WATER
WATER
WATER
WATERWATER
WATER
WATER
WATER
WATER
GAS
WATER
ELEC
SAN
WATER
107
205
206
207
208
300
301
C
PROVIDE:
N
10 40
Feet
0
SR 50 (COLONIAL DRIVE)
SR 50 (COLONIAL DRIVE)
R/W LINE
R/W LINE
R/W LINE
PROPOSED CCTV CAMERA
DIRECTIONAL BORE CONDUIT
POE INJECTOR
FIBER OPTIC PATCH CORD
PRETERMINATED CONNECTOR ASSEMBLY
PRETERMINATED PATCH PANEL
SPLICES
SPLICE TRAY
12 SM FIBER OPTIC CABLE
ELECTRICAL SERVICE WIRE
MANAGED FIELD ETHERNET SWITCH
24"X36" PULL BOXES
CCTV CAMERAS
POLE MOUNTED CABINET
DEVICE PER INDEX 18113
69' CCTV POLE WITH LOWERING
3/21/2016kcarey Z:\Marketing\Orlando Colonial Drive Pedestrian Overpass\roadway\PLANIT01.dgn7:35:25 PM
TV-1 434915-1-58-01 ORANGE 50
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
CCTV LAYOUT
258 SOUTHHALL LANE, SUITE 210
MAITLAND, FL 32751
CERTIFICATE OF AUTHORIZATION 5864
KEVIN R. CAREY, P.E.
P.E. LICENSE NUMBER 61635
FALLER, DAVIS & ASSOCIATES, INC.
SS
SS
SS
SS
SS
SD
SD
WA
TE
R
WATER
ELEC
WATER
WATER
WATER
TEL
TEL
SAN
SAN
WATER
GAS
WATER
WATER
GAS
WATER
WATER
WATER
WATER
SANSAN
SAN
ELEC
ELEC
SAN
WATER
N
10 40
Feet
0
SR 50 (COLONIAL DRIVE)
SR 50 (COLONIAL DRIVE)
SR 527 (O
RA
NG
E
AV
EN
UE)
R/W LINE
R/W LINE
R/W LINE
R/W LINE
140'
PROVIDE:
DIRECTIONAL BORE CONDUIT
FIBER OPTIC PATCH CORD
PRETERMINATED CONNECTOR ASSEMBLY
PRETERMINATED PATCH PANEL
SPLICES
SPLICE TRAY
12 SM FIBER OPTIC CABLE
ELECTRICAL SERVICE WIRE
MANAGED FIELD ETHERNET SWITCH
24"X36" PULL BOX
OBTAINED FROM EXISTING HUB POWER SUPPLY.ORLANDO FIBER OPTIC NETWORK. POWER TO BEFIELD ETHERNET SWITCH AND CONNECT TO EXISTINGPROPOSED PATCH PANEL. INSTALL NEW MANAGED12 SM CABLE INTO CABINET AND CONNECT TOEXISTING ORLANDO HUB 5 - ROUTE PROPOSED
3/21/2016kcarey Z:\Marketing\Orlando Colonial Drive Pedestrian Overpass\roadway\PLANIT02.dgn7:35:26 PM
TV-2 434915-1-58-01 ORANGE 50
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
CCTV LAYOUT
258 SOUTHHALL LANE, SUITE 210
MAITLAND, FL 32751
CERTIFICATE OF AUTHORIZATION 5864
KEVIN R. CAREY, P.E.
P.E. LICENSE NUMBER 61635
FALLER, DAVIS & ASSOCIATES, INC.
3/21/2016kcarey Z:\Marketing\Orlando Colonial Drive Pedestrian Overpass\roadway\PLANIT03.dgn7:35:26 PM
TV-3 434915-1-58-01 ORANGE 50
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
CCTV MOUNTING DETAILS
OVERPASS
PEDESTRIAN
PROPOSED
CCTV CAMERA
55'
20'
CCTV MOUNTING DETAIL
NTS
258 SOUTHHALL LANE, SUITE 210
MAITLAND, FL 32751
CERTIFICATE OF AUTHORIZATION 5864
KEVIN R. CAREY, P.E.
P.E. LICENSE NUMBER 61635
FALLER, DAVIS & ASSOCIATES, INC.
CCTV CAMERA
I-4/PEDESTRIAN OVERPASS
EAST AND WEST UNDER
PROVIDED FOR VIEWING
I-4/PEDESTRIAN OVERPASS
EAST AND WEST OVER
PROVIDED FOR VIEWING