45
STATION ACCESSIBILITY PLAN STUDY AREA - VIJAYNAGAR, BENGALURU, KARNATAKA SUMMER INTERNSHIP 2015 Mentors : Yougal Tak Sonal Kulkarni Ragini Nagisetty Project Team: Ramkrishna J Shivuprasad G Srinivas B V Keerthi G B

Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Embed Size (px)

Citation preview

Page 1: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

STATION ACCESSIBILITY PLANSTUDY AREA - VIJAYNAGAR, BENGALURU, KARNATAKA

SUMMER INTERNSHIP 2015

Mentors : Yougal Tak Sonal Kulkarni Ragini Nagisetty

Project Team: Ramkrishna J Shivuprasad G Srinivas B V Keerthi G B

Page 2: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

SAP is to be prepared within the overall framework of the National Urban Transport Policy (2006).

PRIME FOCUS – • equitable allocation of road space with

people, rather than vehicles• encourage greater use of public transport

and non-motorized modes. • Safe access to station.

ABOUT STATION ACCESSIBILITY PLAN – PROJECT BREIF

AIM -• To encourage sustainable modes of transport

by integrating walking, bicycling, public transport and intermediate public transport (IPT).

OBJECTIVES -• Ensure seamless connectivity between the

metro and other modes of transport • Improve non-motorized access to the metro

station & surrounding areas• Propose DCR to facilitate TOD and non-

motorized accessWhy is Safe Access important? What does it cover?

• Pedestrian & Bicyclists- NMT Prioritization• Multimodal Integration • First and Last mile connectivity• Minimize Traffic conflicts- pedestrian & vehicular• Upgraded infrastructure facilities

VIJAYNAGAR METRO STATION ENTRANCE

BANGLORE METRO RAIL ALIGNMENT – PHASE I

BMRCL is working on Phase-I which is divided into 4 reaches. Our Project comes under Reach-2 (Mysore Road- Magadi Road).

Page 3: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

GLIMPSES OF VIJAYNAGAR METRO STATION

Page 4: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

LOCATION AND CONTEXT ANALYSISPopulation of Bangalore city - 5.67 million (2001)

8.6 million (2011)Vijaynagar metro station is located on Magadi Chord Road on western part of the city. It is mainly surrounded by residential area including institutions, health centers, commercial centers and Vijaynagar TTMC.

Project area is accessed by only one arterial road i.e. Magadi Chord Road. Other major roads are:• 1st Main Rd.• 5 th Main Rd.• 22nd Main Rd.• Marenahalli Road

Study Area includes 7 wards namely 104, 105, 123, 124, 125, 126, 133.POPULATION OF STUDY AREA - 84034TOTAL STUDY AREA - 2sq.km

Page 5: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

METHODOLOGY

Station area delineation and data collection

•Building heights•Built use•Road Character•Street furniture

Digitisation of land use map & related data

•Softwares- GIS, AutoCAD

Existing condition analysis via maps and sample size estimation for HH& opinion surveyPopulation EstimationPassenger B/A Data for Metro Station

H.H Survey•OD & Trip purpose•Mode choice•Waiting time•Income /expenditure•Vehicle ownership•Accessibility Issue

Data analysis & preliminary recommendation

• Enforcement• Management• Planning

Detailed designs

Software's- SketchUP, AutoCAD

Documentation of report

•Softwares- Microsoft WordMicrosoft Power pointAdobe Illustrator

OD & Trip purpose

Opinion Survey

•Pedestrian Cyclist

Page 6: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

STUDY AREA DELINEATION

Page 7: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: EXISTING ROAD SECTION (40M)

Arterial Road Section-40m road (near Bus Stand)

Page 8: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: EXISTING ROAD SECTION 12M

Collector Road Section- 12m road (with on street parking)

Page 9: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: EXISTING ROAD SECTION 12M

Collector Road Section- 12m road (with on street parking and encroachment)

Page 10: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: EXISTING ROAD SECTIONS

Local Road Section- 9m and 6m road (with on street parking and encroachment)

Page 11: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR 2015: ISSUES (COLLECTOR ROAD):12mROW

•UNPAVED/BROKEN FOOTPATHS

•HINDRANCES IN THE FOOTPATHS

•ILLEGAL ONSTREET PARKING AND ENCROACHMENTS

Page 12: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR 2015: ISSUES (SERVICE ROAD A SERVICE ROAD: 8m ROW

•ENCROACHMENTS RESULTING IN REDUCING THE ACTUAL ROW

•ILLEGAL ON STREET PARKING

•BROKEN, UNPAVED, DISCONTINUOUS FOOTPATHS

8.0

6.0

Page 13: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR 2015: ISSUES (LOCAL ROAD):8mROW

•ON STREET PARKING•SOLID WASTE DUMPING ON THE ROADS

•NO FOOTPATHS AND UNCOVERED DRAINAGE

•NO PROPER SURFACE BITUMEN COURSE

Page 14: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

WARD NO. % OF AREA104 60105 5123 33124 50125 80126 30133 25

VIJAYNAGAR: WARD DISTRIBUTION

Page 15: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: SAMPLE SELECTION TOTLAL POPULATION OF STUDY AREA- 84034 NO OF WARDS-7

SAMPLE SIZE- 3% of total population (2500 samples)

Considering the population of the respective wards in the study area (CENSUS2011) further distribution of samples for each ward have been taken.

WARD NO

% DISTRIBUTION

TOTAL NO OF SAMPLES

NO OF SAMPLES (HIG)

NO OF SAMPLES (MIG)

NO OF SAMPLES (LIG)

NO OF SAMPLES (EWG)

104 19 480 134 195 125 7

105 2 50 21 21 7 0

123 16 400 123 162 89 2

124 22 550 199 224 102 2

125 20 500 152 234 105 4

126 11 275 91 116 57 3

133 10 250 75 105 60 0

PASSENGER PERCEPTION SURVEY SAMPLING

DAILY BOARDING/ALIGHTING PASSENGERS FOR VIJAYNAGAR(2021) [DPR phase1]

69050 ppl

PER HOUR BOARDING/ALIGHTING PASSENGERS

2877ppl

CONSIDERING 5% SAMPLE SIZE 200 SAMPLES

104

123

124

133

125

126

105

PEDESTRIAN PERCEPTION SAMPLING

Pedestrian 800

Cyclist 200

Page 16: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

2500 SAMPLES1000 SAMPLES

VIJAYNAGAR: SURVEY CLASSSIFICATION

HOUSEHOLD SURVEYS OPINION SURVEYS

800 SAMPLES 200

SAMPLESpedestrians

cyclists

Safety

Accessibility

Mode choice

Convenience

Modal Split

Satis

fact

ion

Leve

lAff

orda

ble Inclusivenes

s

Road Condition

Street Furniture

Signages

Comfort

Feasibility

User Friendly

Page 17: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: FORM SAMPLES( OPINION/ PERCEPTION)

SOURCE- DULT

Page 18: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: FORM SAMPLES( HOUSEHOLD)

SOURCE- DULT

Page 19: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS(2500 SAMPLES)

41% 23% 18% 1% Source- primary survey

44% MIG Max Travel Distance- 120km

1%

23%

44%

33%

Monthly Income

EWGLIGMIGHIG

< 5000

5000 - 25000

25000 - 50000

> 50000

AVG. TRIP LENGTH DISTANCE

WORK TRIP 10.6 kmEDUCATION TRIP 5.3 kmSHOPPING TRIP 5.9 km

40%

23%

37%

Trip distribution

work

education

social/shopping

16% 1%

Page 20: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS (2500 SAMPLES)

M F0%

10%

20%

30%

40%

50%

60%

55%45%

Gender

17%

28%44%

11%

Age group distribution

0-1818-3030-60 Above 60Dominant age group is 30-60

Page 21: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS (2500 SAMPLES)

unpaved broken discontinuous levels undulating0%5%

10%15%20%25%30%35%

18%25% 28% 29%

Bad condition of footpath

construction material

Parking Hawkers Garbage0%

10%20%30%40%50%60%70%

12%

59%

3% 26%

Blocking of footpath

Since, all the parameters of condition of footpath are almost in the same range. So, there is a need of equal improvement of all parameters.

The blocking of footpath is mainly due to parking. So, there is a need of on street parking (i.e., parallel on street parking). Since, other type of parking will take more carriageway width.) • 30° parking - 4.66m• 45° parking - 5.31m

Page 22: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS(2500 SAMPLES)

Bike

Car

bus

walk

auto

0% 10% 20% 30% 40% 50% 60%

49%

22%

18%

10%

2%

15%

0%

37%

42%

5%

29%

31%

12%

25%

3%

Social/ShoppingEducationWork

Page 23: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS (2500 Samples)

Dominant age group-30-60(44%)

Dominant income group-MIG(44%)

Source- primary survey

17%

28%44%

11%

Age group distribution

0-1818-3030-60 Above 60

1%

23%

44%

33%

Income group distribution

EWG <5000LIG 5000 - 25000MIG 25000 - 50000HIG >50000

Page 24: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS(2500 SAMPLES) ISSUES WITH FOOTPATH

Source- primary survey

Major Problems

DIRTY FOOTPATHSUNEVEN FOOTPATHS ABSENCE OF FOOTPATHS

Lack of street lighting

High risk of accidents

High risk of thefts/assaults

Drainage and sanitation

0% 10% 20% 30% 40% 50% 60% 70%

6%

13%

17%

28%

50%

57%

57%

38%

44%

29%

26%

34%

Not respondedNOYES

Page 25: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: ISSUES ON STREET

CnD WASTE ON FOOTPATH

Page 26: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: ISSUES ON STREET

ONSTREET PARKING

OPEN DRAINAGE AND ABSENCE OF FOOTPATHS

SOLID WASTE DUMPING CREATING NUISANCE

Page 27: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: ISSUES ON STREET

CnD WASTE

PARKING ON FOOTPATH

BARRIERS ON WALKWAY

Page 28: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: MAJOR ISSUES......

Page 29: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

34%

57%

8% 1%

Nearest Bus Stop

< 250 m250 m -500 m500 - 750 m>750m

VIJAYNAGAR: TRANSIT USER SURVEY ANALYSIS(25 SAMPLES)

31%

42%

19%

8%

Waiting time at Bus stop

< 5 min5 - 10 min10 - 15 mins> 15 mins

23%

39%

18%

8%

11%

Frequency of Bus Usage

Daily2 or 3 times a week Once in 15 daysOnce a monthRarely

18%

Dominant user group

Page 30: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: IPT USER (HH SURVEY ANALYSIS)

1%

83%

10%6%

Nearest Bus stop

<250m250m-500m500m-750m>750m

27%

69%

0%5%

Nearest Auto stop

<250m250m-500m500m-750m>750m

Page 31: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

42%

58%

Absence of footpath

YesNo

Yes No0

10

20

30

40

50

60

70

80

90

77.75

22.25

Unsaafe road crossing

VIJAYNAGAR: IPT USER (Opinion SURVEY ANALYSIS)

Page 32: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

1%

24%

44%

32%

Footpath condition in neighbourhood

very goodGoodOkayBadVery bad

very good

Good Okay Bad Very bad0

5

10

15

20

25

30

35

40

45

50

0

24

46

26

4

Opinion of the footpath

VIJAYNAGAR: IPT USER (Opinion SURVEY ANALYSIS)

Page 33: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Proposal -1 for 1st main road

VIJAYNAGAR: Proposal for 1st main road

Page 34: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Cross section of 1st main road

Cross section of Cross road

Cross section of Service road

VIJAYNAGAR: Proposal for 1st main road

Page 35: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Proposal -2 for 1st main road

VIJAYNAGAR: Proposal for 1st main road

Page 36: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Cross section of 1st main road

VIJAYNAGAR: Proposal for 1st main road

Page 37: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Vijayanagar: Proposal for 5th main road

BOLLARDS PROVIDED TO RESTRICT ENTRY OF TWO WHEELERS

STREET FURNITURE

VIJAYNAGAR: Proposal for 5th main road

Page 38: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYNAGAR: Proposal for 5th main road

Page 39: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYANAGAR: Proposal for 5th main road

Page 40: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

VIJAYANAGAR: Proposal for Cycle lane on main roads Proposed Cycle Lane for 4 main roads

Page 41: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

A FEW STEPS TOWARDS SAFE ACCESSIBILITY

Page 42: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

PEDESTRIAN WALKABILITY INDEX

WHAT IS IT?

SAFETY AND SECURITY

POLICY SUPPORT

CONVEINIENCE/ AESTHETICS •Safety measures at

intersections•Feeing of being safe

•Pedestrian planning programs•City plans – Pedestrian networks

•Length of the Road to cross•Coverage from weather Elements (Tree canopy)•Footpath blocks( parked trees or poles can be obstruction)

Page 43: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

TO FULFILL THE NEED, TAKE THE LEAD•Assign small

management tasks to the residents and in return recognise them for their work.

•This would reduce enforcement issues and ease out the pressure from local civic authorities.

•Community participation is the need of the hour, as all the issues cannot be solved by the local authorities as well as planners.

•To develop a sense of awareness and responsibility among the residents of Vijayanagar, towards the betterment of their locality.

Page 44: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

OTHER RECOMMENDATIONS

ENFORCEMENT MANAGEMENT PLANNING•Street Vending Act 2014 should be implemented in certain areas (Informal Markets)

•Levy taxes on On- street parking.

• Implementation of building bylaws (setbacks).

•Signal synchronization at major intersections

• Provision of dedicated cycle tracks, parking spaces, pedestrian walkways.

•Provision of ramps on footpath to ensure accessibility to the vulnerable groups.

•After every 500m there should be a dustbin.

•Encouraging community participation.

Page 45: Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

Thank you