My Steam Turbine Overhaul Project at Bandar-Abbas Refinary Overhaul 2013 Old rotor

Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

Embed Size (px)

Citation preview

Page 1: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

My Steam Turbine Overhaul Project at Bandar-Abbas Refinary Overhaul 2013

Old rotor

Page 2: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

NDE Bearing Housing Cover – OS Trip Mechanism is now exposed

Diffuser Rings (Lower) :Deposit caused by water impurities, Also wear caused by inter stage steam passing

Page 3: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

Old Rotor

Page 4: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

Last stage blades – Damage to the blade tip

Old Rotor Removal

Page 5: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

Mounting New Rotor

New Rotor in place – Labyrinth Covers and HP-LP Nozzle Cover mounted

Page 6: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

Final Works on upper Casing

Mounting Main Cover

Page 7: Steam Turbine Major Overhaul - Bandar Abbas Oil Refinary

Job Finalization!

- Job Duration:15 days

- Team Members (6 Persons):

H. Ghasempour

A. Nasrpour

M. Karimi

A .Teimori

M. Salmani Nejad

H. Azimi