LEGEND UPDATES ON KEY OIL&GAS PROJECT STATUS FROM PREVIOUS MONTH, MARCH ‘16 SUPPLHI PROJECTS DATABASE KUWAIT LNG TERMINAL LNG Onshore Regasification The scope of work includes eight 225,000-cubic-metres LNG storage tanks with docking facilities. BUL HANINE REDEV. Offshore Shallow Water The Bul Hanine redevelopment project is expected to double the field’s current production rate from 40,000 to 95,000 b/d and extend the life of the field by over 25 years.. HEYDAR ALIYEV MODERN./UPGR. Refining The overall refinery capacity will be increased from 6 to 7.5 million tons per year (MTPA). The modernization of plant will begin immediately and will be completed by late 2018. PANCEVO REFINERY Refining The project includes an extensive process-planning study for the refinery, which will evaluate how to best integrate the delayed coker with the existing cocker and hydrocracker. BRESSAY HEAVY OIL DEV. Offshore Shallow Water Statoil announced in Oct-15 that FID for the long delayed project would be undertaken by 2016. However, in Mar-16, due to excessive cost, the project was put on hold again. TRANS-ADRIATIC PIPELINE (TAP) Onshore Pipeline Contractors for the remaining sections of the pipeline will be appointed in Q2 2016. This section will be 360 km long and is expected to be completed in Jun 2018. TRANS-ADRIATIC PIPELINE (TAP) Onshore Pipeline Contractors for the remaining sections of the pipeline will be appointed in Q2 2016. This section will be 215 km long and is expected to be completed in Jun 2018. CANAPORT LNG PROJECT LNG Onshore Liquefaction plant End users decided to convert the facility from an import (regasification) terminal, into an export (liquefaction) one. The project has been put on hold due to averse market conditions. COSTA NORTE II LNG TERMINAL LNG Onshore Regasification The plant is part of Panama's Government energy diversification strategy. Completion is expected in Mar 2018 Qatar Petroleum n.a. (~$11B) FEED (EPC) Mar'16 ~$2.9B EPC Jun'16 Hyundai Engineering SOCAR ~$500M PMC Mar'16 KBR ~$20M FEED Mar'16 CB&I Statoil ~$2B EPC On Hold To be awarded TAP AG ~$1.6B EPC Jun '16 TAP AG ~$1,3B EPC Jun'16 Repsol ~$2,0B FEED On Hold To be Awarded AES Corp. ~$650M EPC Mar'16 Awarded On Hold Cancelled Contract value Award date Engineering Co./ EPC Contractor (Country of Execution) Contract type Clients SupplHi Project ID 7000152 6000028 6000252 6000096 3000269 10000396 10000400 3000267 7000153 SINGAPORE LNG TERMINAL PH. III LNG Onshore Regasification The project consists of the further expansion of the Terminal to include a 4 th LNG storage tank and additional regasification facilities to bring capacity from 6 MTPA to ~11 MTPA. SLNG ~$700M EPC Mar'16 Samsung C&T 6000216 GWF PHASE II – SUBSEA Subsea Field Development Detailed scope of work: flowline system detailed design and support the related procurement and construction processes. Production expected to start in the second half of 2019. ~$2B FEED Mar'16 4000212 FIND NEW BUSINESS OPPORTUNITIES IN THE INDUSTRIAL WORLD. CONTACT [email protected] FOR MORE INFO AL SHAHEEN FIELD DEVELOPMENT Offshore Shallow Water Field produces 300k Bpd and is operated by Maersk Oil. QP invited other Oil Co.’s to bid for the concession after Maersk's contract expires in ‘17. Field is expected to be expanded by 100k Bpd. n.a. EPC Jun’17 3000270 To be awarded LLOYDS ENERGY FLNG Floating LNG (FLNG) The location where the facility will be deployed has not been disclosed. KBR will provide integrated topsides and hull engineering design services for a nominal 2.5 MTPA FLNG. n.a. FEED Mar'16 KBR 6000255 HEJRE OIL & GAS FLD. DEV. Offshore Shallow Water Already delayed in 2015, the project has been definitively cancelled in Mar 2016. The field would have been set at 70m depth, with a capacity of 2MTPD of gas and 35,000 b/d of oil. ~$1.8B EPC Cancelled 3000034 HASSI MESSAOUD AND TIARET Refining The refineries include facilities for atmospheric distillation, LPG separation, hydrocrackers, desulphurisation, bitumen production, blending, effluents treatment, control room. n.a. ($6B) FEED (EPC) Mar'16 10000393-4-5 ABADI GAS FIELD FLNG Floating LNG (FLNG) President of Indonesia Widodo has decided against the FLNG unit for the development of Abadi field. He instead decided the field will be developed through an onshore plant (see 6000260). Inpex ~$80M FEED Cancelled 6000243 Technip BROWSE FLNG Floating LNG (FLNG) The Browse LNG project was planned for WA, a $40B FLNG export facility. Due to the “extremely challenging” market, the project was scrapped on March 22. ~$40B EPC Cancelled 6000176 MASELA GAS PROJECT LNG PLANT LNG Onshore Liquefaction plant Following presidential decision, the original plan to deploy an FLNG facility in the Masela Block was converted in an onshore LNG plant, this has led to a ~$7,5B increase in costs. ~$15B EPC Jun’18 6000260 To be awarded Technip Daewoo PROJECTS DB SAMPLE FREE MARKET REPORT, Jan ‘16

SupplHi Projects Database Main Updates - March

  • Upload
    supplhi

  • View
    172

  • Download
    7

Embed Size (px)

Citation preview

Page 1: SupplHi Projects Database Main Updates - March

LEGEND

UPDATES ON KEY OIL&GAS PROJECT STATUS FROM PREVIOUS MONTH, MARCH ‘16SUPPLHI PROJECTS DATABASE

KUWAIT LNG TERMINALLNG Onshore RegasificationThe scope of work includes eight 225,000-cubic-metres LNG

storage tanks with docking facilities.

BUL HANINE REDEV.Offshore Shallow WaterThe Bul Hanine redevelopment project is expected to double

the field’s current production rate from 40,000 to 95,000 b/d

and extend the life of the field by over 25 years..

HEYDAR ALIYEV MODERN./UPGR. RefiningThe overall refinery capacity will be increased from 6 to 7.5

million tons per year (MTPA). The modernization of plant will

begin immediately and will be completed by late 2018.

PANCEVO REFINERYRefiningThe project includes an extensive process-planning study for

the refinery, which will evaluate how to best integrate the

delayed coker with the existing cocker and hydrocracker.

BRESSAY HEAVY OIL DEV.Offshore Shallow WaterStatoil announced in Oct-15 that FID for the long delayed

project would be undertaken by 2016. However, in Mar-16,

due to excessive cost, the project was put on hold again.

TRANS-ADRIATIC PIPELINE (TAP) Onshore PipelineContractors for the remaining sections of the pipeline will be

appointed in Q2 2016. This section will be 360 km long and is

expected to be completed in Jun 2018.

TRANS-ADRIATIC PIPELINE (TAP) Onshore PipelineContractors for the remaining sections of the pipeline will be

appointed in Q2 2016. This section will be 215 km long and is

expected to be completed in Jun 2018.

CANAPORT LNG PROJECTLNG Onshore Liquefaction plantEnd users decided to convert the facility from an import

(regasification) terminal, into an export (liquefaction) one. The

project has been put on hold due to averse market conditions.

COSTA NORTE II LNG TERMINALLNG Onshore RegasificationThe plant is part of Panama's Government energy

diversification strategy. Completion is expected in Mar 2018

Qatar Petroleum n.a. (~$11B)

FEED (EPC) Mar'16

WorleyParso

ns

KNPC ~$2.9B

EPC Jun'16

Hyundai Engineering

Hyundai E&C

Kogas

SOCAR ~$500M

PMC Mar'16

KBRNaftna Industrija

Srbije (NIS) ~$20M

FEED Mar'16

CB&IStatoil ~$2B

EPC On HoldTo be awarded

TAP AG ~$1.6B

EPC Jun '16

Bonatti

J&P AVAX

TAP AG ~$1,3B

EPC Jun'16

SPIECAPAG

Repsol ~$2,0B

FEED On HoldTo be Awarded

AES Corp. ~$650M

EPC Mar'16

Posco

Awarded On Hold Cancelled

Contract value

Award date

Engineering Co./

EPC Contractor(Country of Execution)Contract type

Clients

SupplHi Project ID

7000152

6000028

6000252

6000096

3000269

100003961000040030002677000153

SINGAPORE LNG TERMINAL PH. IIILNG Onshore RegasificationThe project consists of the further expansion of the Terminal to

include a 4th LNG storage tank and additional regasification

facilities to bring capacity from 6 MTPA to ~11 MTPA.

SLNG ~$700M

EPC Mar'16

Samsung C&T

6000216

GWF PHASE II – SUBSEASubsea Field DevelopmentDetailed scope of work: flowline system detailed design and

support the related procurement and construction processes.

Production expected to start in the second half of 2019.

Woodside ~$2B

FEED Mar'16

Wood Group

4000212

FIND NEW BUSINESS OPPORTUNITIES IN THE INDUSTRIAL WORLD. CONTACT [email protected] FOR MORE INFO

AL SHAHEEN FIELD DEVELOPMENTOffshore Shallow WaterField produces 300k Bpd and is operated by Maersk Oil. QP

invited other Oil Co.’s to bid for the concession after Maersk's

contract expires in ‘17. Field is expected to be expanded by 100k Bpd.

Qatar Petroleum n.a.

EPC Jun’17

3000270

To be awarded

LLOYDS ENERGY FLNG Floating LNG (FLNG)The location where the facility will be deployed has not been

disclosed. KBR will provide integrated topsides and hull

engineering design services for a nominal 2.5 MTPA FLNG.

Lloyds Energy n.a.

FEED Mar'16

KBR

6000255

HEJRE OIL & GAS FLD. DEV.Offshore Shallow WaterAlready delayed in 2015, the project has been definitively

cancelled in Mar 2016. The field would have been set at 70m

depth, with a capacity of 2MTPD of gas and 35,000 b/d of oil.

DONG Energy

Bayerngas Norge ~$1.8B

EPC Cancelled

3000034

HASSI MESSAOUD AND TIARETRefiningThe refineries include facilities for atmospheric distillation, LPG

separation, hydrocrackers, desulphurisation, bitumen

production, blending, effluents treatment, control room.

Sonatrach n.a. ($6B)

FEED (EPC) Mar'16

10000393-4-5

BonattiAmec

Foster

Wheeler

ABADI GAS FIELD FLNGFloating LNG (FLNG)President of Indonesia Widodo has decided against the FLNG

unit for the development of Abadi field. He instead decided the

field will be developed through an onshore plant (see 6000260).

Inpex ~$80M

FEED Cancelled

6000243

Technip

BROWSE FLNGFloating LNG (FLNG)The Browse LNG project was planned for WA, a $40B FLNG

export facility. Due to the “extremely challenging” market, the

project was scrapped on March 22.

Woodside ~$40B

EPC Cancelled

6000176

Technip

Samsung Eng

MASELA GAS PROJECT LNG PLANTLNG Onshore Liquefaction plantFollowing presidential decision, the original plan to deploy an

FLNG facility in the Masela Block was converted in an onshore

LNG plant, this has led to a ~$7,5B increase in costs.

Inpex Shell ~$15B

EPC Jun’18

6000260

To be awarded

Technip

Daewoo