EAST SIDE COASTAL RESILIENCY PROJECT The project aims to reduce the risk to the vulnerable neighborhoods of the LES, including NYCHA campuses, and to enhance access to the waterfront.
26
FUNDED SEGMENT CONCEPT
StuyTown
ConEd
NYCHARiisHouses
NYCHAWaldHouses
NYCHALavanburgHomesNYCHA
BaruchHouses
NYCHAVladeckHouses
REBUILD BY DESIGN – BIG U
How Do You Use the Waterfront?
What Are the Options?
How Do We Combine Options?
Final Concept Design: Input and Feedback
Re-Engagement Meetings (March)
Workshops (May) Workshops (July) Community Meetings/ Workshops (October)
Background Research & Studies
Design Concept Studies & Workshops
Design Concept Reports
Stakeholder Meetings
CONCEPT DESIGN
COMPLETION
CONCEPT DESIGN START
Task Force Meetings
DECEMBER 2014
DECEMBER 2015
E A S T S I D E C O A S T A L R E S I L I E N C Y
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV
C o m m u n i t y E n g a g e m e n t M e e t i n g s
2015 PROJECT SCHEDULE
7
INPUTS: COMMUNITY PRIORITIES CITY PRIORITIES SITE CONDITIONS TECHNICAL FEASIBILITY URBAN DESIGN
CONTINUED INPUTS: REGULATORY CONSTRAINTS AGENCY COORDINATION MAINTENANCE TECHNICAL CONSIDERATIONS COMMUNITY FEEDBACK TRADE-OFFS AND BUDGET OPERATIONS AND EMERGENCY MANAGEMENT
WHAT’S NEXT? - DESIGN
19
Focused Stakeholder Meetings (starting in mid-June 2016)
• Montgomery Street Tie-Back o Safety/visibility and aesthetic design concerns
• East 25th Street Tie-Back o Safety/visibility/circulation and aesthetic design concerns
• Delancey Street/Grand Street Access o Proposed newly aligned bridge and landings
o Impacts on views
• Park Programming Scope Meetings o Murphy’s Brother’s Playground
o Asser Levy Recreation Center
WHAT’S NEXT? – COMMUNITY ENGAGEMENT
20
• Community Engagement Meetings (one set of three meetings approximately every 6 months)
o Project overview
o Review designs
o Gain community feedback on designs
o First set of engagement meetings – Fall 2016
• Task Force Meetings (quarterly and open to the public)
WHAT’S NEXT? – COMMUNITY ENGAGEMENT
21
• ULURP Application Preparation Underway
• EIS Draft Scope of Work (DSOW) Issued on 10/30/15
• Draft EIS Preparation Underway
• 3 Alternatives in DSOW o Alternative 1 – No Action
o Alternative 2 – Baseline Flood Protection System
o Alternative 3 – Flood Protection System with Park and Neighborhood Connection Improvements
• 2 Additional Alternatives since DSOW o Alternative 4 – Flood Protection System with Integrated Park
Facility Resiliency Measures
o Alternative 5 – Flood Protection Alignment East of FDR Drive with Flyover Bridge Alternative
WHAT’S NEXT? – ULURP and EIS
22