71
NBI © 2014 Staying Ahead of Advancing Energy Codes with the Advanced Buildings New Construction Guide

Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construction Guide

Embed Size (px)

Citation preview

NBI © 2014

Staying Ahead of Advancing

Energy Codes with the

Advanced Buildings New

Construction Guide

Agenda

Introduction • Introduction to Advanced Buildings

Codes Landscape • The link between Advanced Buildings and energy codes

• Recent stringency advancements in energy code

The New Construction

Guide

• Structure

• Tier 1

• Tier 2

• Tier 3

Wrap Up • Q&A

NBI © 2014

Advanced Buildings New Construction Guide

NBI’s prescriptive solution for

achieving high performance in

new commercial construction

and major renovation projects

NBI © 2014

Advanced Buildings

New Construction Guide

Commercial Buildings up to 100,000 sf • Office

• Retail

• Schools

• Town Halls, Fire & Police Stations

• Warehouses Core Performance Building: Tremont Yard Building

Lowell, MA. Photo credit: National Grid

NBI © 2014

NBI © 2014

Uh, Building Energy Simulation

Forum

NBI © 2014

http://www.innovationlabs.org.uk/2013/03/21/iterative-design-works/

NBI © 2014

Advanced Buildings Program Partners

NBI © 2014

2003

Guide Evolution

2006

2009

2014

90.1-1999

16-26%

25-35%

20-30%

NBI © 2014

MA Stretch Code

American Clean Energy and Security Act (Waxman-Markey)

30%

NBI © 2014

-15%

NBI © 2014

Questions?

NBI © 2014

NBI © 2014

NBI © 2014

AB Energy Performance Tiers

Tier 1

Tier 2 Tier 3

Tier 1

Tier 2 Tier 3

Tier 1

Tier 2 Tier 3

IECC “2009+”

Tier 1

Tier 2 Tier 3

NBI © 2014

Energy Savings by Tier

NBI © 2014

newsoffice.mit.edu/2013/renovation-plans-offer-mit-opportunities-to-save-energy-improve-design

NBI © 2014

NBI © 2014

theairbarrier.com/services/air-barrier-testing/

NBI © 2014

0.40 CFM/sf of envelope area

• Blower Door Testing

• Prescriptive Checklist

NBI © 2014

0.40 CFM/sf of envelope area

• Blower Door Testing – 0.4 CFM/sf

• Prescriptive Checklist

NBI © 2014

0.40 CFM/sf of envelope area

• Blower Door Testing – 0.4 CFM/sf

• Prescriptive Checklist – 1.0 CFM/sf

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

www.us-duct.com/portals/0/usd-images/gored-segmented-duct-elbows.jpg www.dryer-ell.com/images/elbow_comparison.jpg

www.ideal-air.com/media/9379/semirigid%20ducting.png

ecx.images-amazon.com/images/I/51sFNF1YIQL.jpg

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

Pick One

NBI © 2014

NBI © 2014

CC

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

NBI © 2014

Questions?

NBI © 2014

Tier 4: Operations

NBI © 2014

Sensitivity Analysis Comparing the Impact of Design, Operation, and Tenant Behavior on Building Energy Performance

NBI © 2014

• Resource Conservation Manager

• Computing Policy

• Procurement Policy

• Scheduling Policy

• Plug Load Policy

• Energy Feedback / Continuous Benchmarking

• Continuous Commissioning

• Etc.

Tier 4: Operations

NBI © 2014

Questions?

This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written

permission of the speaker is prohibited.

© New Buildings Institute 2014

Copyright Materials