26
1 Teekay Offshore Production - 2015 Sustainability Report Teekay Offshore Production - 2015 Sustainability Report TEEKAY OFFSHORE PRODUCTION Sustainability Report 2015 Petrojarl Banff

Teekay Offshore Production Sustainability Report 2015

Embed Size (px)

Citation preview

Page 1: Teekay Offshore Production Sustainability Report 2015

1

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

TEEKAY OFFSHORE PRODUCTIONSustainability Report 2015

Petrojarl Banff

Page 2: Teekay Offshore Production Sustainability Report 2015

2

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

CONTENT

Editing completed August 2016.

The legal name of the company is Teekay Petrojarl Production AS. Teekay Offshore Production (TOP) is the name of the business unit.

Photo: Morten Mehli (page 1, 7, 10, 17), Jørgen Westrum Thorsen (page 2, 6, 7), Cecilie Hettervik (page 4), Ole Kristian Hemnes (page 8), Priscila Rosa (page 12), Roger Buvarp (page 15), Alf H. Hansen (page 19, 26) and others.

Layout: Elisabeth Hamstad, HSEQ Department, Teekay Offshore Production.

3 PRESIDENT’S INTRODUCTION 4 FACTS AND HISTORY

6 2015 HIGHLIGHTS

8 SUSTAINABILITY IN CONTEXT Stakeholder Management Reporting Basis Scope and Boundaries

10 PEOPLE Recruitment and Growth Diversity Training and Development Health and Safety Operational Safety Case Story Asset Integrity Management Barrier Management System Project HSE Management Occupational Health Our Social Footprint Community Investments

19 PLANET Environmental Impact Emission to Air Discharge to Sea Waste Management

22 PROFIT Adapting to the «New Normal» Operational Excellence Finance Supply Chain Growth Ethics and Anti-Corruption

25 KEY FIGURES

Page 3: Teekay Offshore Production Sustainability Report 2015

3

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PRESIDENT’S INTRODUCTION

O ur goal for 2015 was to continue to deliver our core competence; operational excellence and strong Health, Safety and Environmental (HSE) results. We also aimed to maintain our tradition of safe, timely

and on-budget completions of projects.

The falling oil prices have also affected the FPSO business. We had - and will continue - to adapt to the “New Normal” - an environment with lower oil prices. One of the consequences for Teekay Offshore Production is a required shift from a growth focus to securing our existing business.

Our aim was to ensure an acceptable commercial future for our two FPSOs, Petrojarl Varg and Hummingbird Spirit, which are nearing the end of their respective contracts. At the time of publishing of this report, we know that the contract for Hummingbird Spirit is extended to Q3 2017, and Petrojarl Varg has gone off field in August 2016 and discussions are ongoing with several customers to redeploy her.

We did not achieve our HSE goals in 2015. This is naturally of great concern to us and we have initiated an Operational and Safety Journey with active engagement on all levels to turn this negative trend around. This is everyone’s responsibility. We are seeing a positive trend so far in 2016 and need to maintain the sharp focus on HSE culture and perfor-mance. Our aim is always zero accidents and injuries.

Operationally we had quite a good year with commercial uptime above target. It was by no means a perfect year, but on average across the fleet, we must be satisfied with our overall performance.

Commercially a lot of good work has been done in a very challenging market. We believe we are well positioned in 2016 and are seeing a lot of interest in our assets. The low oil price also brings opportunities for re- deployment of our assets compared to new-build projects.

Financially we were significantly helped by the foreign exchange rate, but even adjusting for that, we were able to meet our operation budgets. That is a good achievement in today's market.

In 2016 our goal is to improve our HSE performance, and to position our-selves through the turmoil in the oil and gas industry building an organiza-tion that is lean, cost effective, sustainable and successful in the long run. With this being the backdrop, there is no doubt 2016 will be a challenging year for us, but we strongly believe we will come out of this even more robust than before.

Welcome to Teekay Offshore Production’s 2015 Sustainability Report. At Teekay Offshore Production we believe that our long-term operational and commercial success is closely linked to our ability to effectively manage sustainability challenges, risks and opportunities.

Chris Brett President

Teekay Offshore Production

Page 4: Teekay Offshore Production Sustainability Report 2015

4

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

FACTS AND HISTORY

T eekay Offshore Production (TOP) is the largest operator of Floating Production, Storage and Offloading (FPSO) vessels in the North Sea. With a combined production capability of close to 600,000 barrels of

oil per day and a crude storage capacity of almost 3.5 million barrels, we have a long, proven track record in safely operating FPSO vessels in one of the harshest marine environments in the world.

TOP currently operates nine FPSOs – two on the Norwegian Continental Shelf, four on the UK Continental Shelf and three offshore Brazil of which one is jointly owned with Odebrecht Oil and Gas. In addition, Petrojarl I is currently at yard in Rotterdam, Netherlands, and is planned to start up operations for Atlanta offshore Brazil in the beginning of 2017. FPSO Pioneiro de Libra is undergoing conversion in Singapore, with planned start-up of operations for our Odebrecht Oil and Gas/Teekay joint venture in Brazil in 2017.

All production units were under contracts producing for oil and gas companies in 2015. The Petrojarl Varg FPSO contract is terminated by Repsol due to the oilfield being at its end of life, and the FPSO is planned to lay-up in August 2016 awaiting new contracts.

TOP’s hub for FPSO is in Trondheim, Norway and we have operations offices in Norway, Scotland and Brazil. Our more than 1100 employees - offshore and onshore, permanent and temporary - are professionals with a unique blend of operational and engineering expertise.

TOP is part of Teekay Offshore.

Petrojarl Varg

Page 5: Teekay Offshore Production Sustainability Report 2015

5

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

FACTS AND HISTORY

T eekay Offshore is part of Teekay Corporation. Established in 1973, Teekay has developed from a re-

gional shipping company into one of the world’s largest marine energy transporta-tion, storage and production companies. Over the last 20 years, Teekay Offshore have grown tenfold in assets, created four publicly traded companies, establis-hed numerous joint ventures and built an enviable reputation and brand for operational excellence.

Teekay remains committed to the highest level of health, safety, environment and quality (HSEQ), maximizing the return on invested capital (ROIC) for our share- holders and delivering innovative tech- nological and commercial solutions in new and emerging market segments.

Our vision is to bring energy to the world with Teekay Spirit. Our core values of SAFETY and SUSTAINABILITY, PASSION, INTEGRITY, RELIABILITY, INNOVATION and TEAMWORK guide us in all that we have done and will do.

Our commitment to Safety and Sustainability means we put safety first. No compromises. We look after each other and make sure everyone gets home safely. We consider people, planet and profit in all of our decisions and actions. We contribute to a sustainable business, environment and community.

Page 6: Teekay Offshore Production Sustainability Report 2015

6

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

2015 HIGHLIGHTS

IN NOVEMBER IT WAS finally con-firmed that Petrojarl Varg will be leaving the Varg field in 2016, meaning this reliable lady will be open for new possibilities.

Both a de-commissioning team and a dedicated FEED team were for-med to ensure we leave the field in a good manner, and prepare Petro-jarl Varg for new opportunities.

32.63 MILLION BARRELS of equiva-lent (boe) produced in 2015, which is an all-time high for TOP. If we include the production from our joint venture operated FPSO Cidade de Itajai, the production reached 72.15 Mboe.

HUMMINGBIRD SPIRIT achieved in February six years without Lost Time Injuries (LTI).

This demonstrates - supportet by the client Centrica Energy - the visible commitment to get everyone home safely, doing the right thing in line with our core values and lifesaving rules.

PETROJARL KNARR achieved first oil and started producing offshore Norway in March 2015 and is now on hire with BG Norway on the Knarr field.

Page 7: Teekay Offshore Production Sustainability Report 2015

7

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

2015 HIGHLIGHTS

ARNT NILSEN FROM Petrojarl Varg won the first President’s HSE Award for Q4 – 2015 for his honest and invaluable contribution to the safety film «Why didn’t we stop the job». The TOP President’s HSE Award’s objective is to motivate to pro- active actions, attitude and be-haviour above and beyond what is expected, and will be awarded on quarterly basis.

IN AUGUST, CHRIS BRETT was appointed as President of TOP. Chris is a native Australian who held the position of VP Legal in Teekay Petrojarl for five years before taking on the challenge of heading up the company.

THE 30TH OF SEPTEMBER marked one year since contract signing for the Libra project and we’re happy to report we have achieved this mi-lestone without injury. Total man-hours are now in excess of 2.7 million, with the statistics including four shipyards, over 30 different sub-contractors and our OOGTK manpower.

OUR STAFF SPENT a record of 11415 days training in 2015. This is a reflection of the importance of competency in our organisation.

The picture is showing TOO, TOP and BG Management on Major Accident training at Spadeadams, UK.

Page 8: Teekay Offshore Production Sustainability Report 2015

8

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

SUSTAINABILITY IN CONTEXT

T eekay Offshore Production’s annual sustainability reporting is one of the means of which we examine and elaborate on our targets, performance and initiatives within the area of sustainability. We have

since 1998, as a part of our ISO 14001 environmental certification, issued an annual Environmental Report which in 2006 was extended into a Sustainability Report. This report describes our impacts on and approach to sustainability and associated challenges and opportunities.

At TOP, we strive to consider people, planet and profit in all of our decisi-ons and actions. Sustainability is a core value in Teekay and ensures the long-term health and success of our people, our business and the sur- roundings we work in.

This report is meant for you as our stakeholders, whether you are a current or future employee, existing or potential business partner, shareholder, regulator, or simply someone with a keen interest in what we do.

We welcome your comments or input and if you would like to share any thoughts, please get in touch on: [email protected], marking the e-mail “Sustainability Report 2015”.

PEOPLE• Diversity• Recruitment and Growth• Health and Safety• Corporate Social Responsibility

PLANET• Energy• Discharge to sea• Emission to air• Climate change

PROFIT• Bussiness and commercial development• Operational exellence• Supply chain• Transparency and Ethics• Project management

SUSTAINABILITY IN TEEKAY OFFSHORE PRODUCTION

Petrojarl Foinaven

Page 9: Teekay Offshore Production Sustainability Report 2015

9

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

SUSTAINABILITY IN CONTEXT

Stakeholder ManagementIn Teekay Offshore Production we acknowledge that our business doesn’t exist in isolation, and that what we do and how we operate have an influ-ence on both our own employees and others. We identify our stakeholders by identifying who is impacted, directly or indirectly by how we perform. Our sustainability reporting is one of the ways by which we aim to respond to key topics and concerns raised by our stakeholders.

We consider employees, shareholders and customers as our key stake- holders, followed by authorities and regulators, local communities and partners.

TOP strives for internal and external stakeholder engagement. In 2015 we have reinforced our internal Town Hall sessions where employees can inter-act and learn about our priorities, objectives and strategy. The Town Hall sessions are held regularly, and are also filmed and shared internally to ensure all employees have the opportunity to be kept informed, indepen-dent of their location. We have daily interactions with our customers, and also involve them in important sessions such as annual HSE goal settings. In addition, we engage with customers, shareholders, peers, suppliers and others through a variety of methods, such as meetings, interviews, confe-rences, surveys and investor roadshows. We aim to use these interactions as a way of understanding our stakeholders’ expectations, identifying areas for improvement and creating long term relationships.

Reporting BasisThis report contains Standard Disclosures from the Global Reporting Initi-ative, GRI Sustainability Reporting Guidelines. The GRI guidelines are the most commonly used guidelines for sustainability reporting.

The GRI disclosure table can be found at www.teekay.com/sustainability. It indicates where you find our response to the various disclosures and performance indicators requested by the GRI G4 guidelines.

The report is not verified externally.

Scope And BoundariesOur report covers all of Teekay Offshore Production’s activities in 2015, both on- and offshore.

Our HSE statistics follow the reporting principle of “Operational control”, meaning that FPSO Cidade de Itajai (owned by the Odebrecth Oil and Gas/Teekay Offshore joint venture), Hummingbird Spirit (owned by TOP, but operated by Wood Group) and yard HSE statistics are not included in this report.

SUSTAINABILITY IS A CORE VALUE IN TEEKAY AND ENSURES THE LONG-TERM HEALTH AND SUCCESS FOR OUR PEOPLE, OUR BUSINESS AND THE ENVIRONMENT WE WORK IN.

Page 10: Teekay Offshore Production Sustainability Report 2015

10

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

A t the end of 2015, Teekay Offshore Production (TOP) had 1069 permanent employees located in different parts of the world, with offices in Norway, Scotland and Brazil as well as a project office in the Netherlands and Singapore (Joint Venture). In addition

we had 102 contractors, consultants and part-time employees working for us in 2015.

In a knowledge and experience-based industry, good people are the key to our success. TOP has always given priority to, and is very proud of, the flexibility of its workforce. 2015 was yet another year where the flexibility of the organisation was crucial. The start-up of Petrojarl Knarr, the preparation for the decommissioning of Petrojarl Varg, and the ongoing projects Petrojarl I for Atlanta and FPSO Pioneiro de Libra, all contributed to organisational changes needed to ensure the continued sustainability of the TOP organisation.

The well-being of our personnel is essential to maintain our operational track record. In this section, we elaborate on the people in our organization; how we work to ensure that we maintain our employe-es’ health and safety, welfare for employees and on how we give something back to the communities in which we have set up offices or operate FPSOs.

Petrojarl Banff

Page 11: Teekay Offshore Production Sustainability Report 2015

11

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

DiversityThe offshore industry is traditionally male dominated, and this is also the reality in Teekay Offshore Production. The percentage of female employees offshore is still low (but increasing), at 4.15 %. In terms of total number of permanent employees, we see a relatively stable gender composition, with 37 % female and 63 % male workforce. Among our management positi-ons, the female presence is 7.2 %. All of our female supervisors work in our onshore organisation, comprising 17.2 % of our onshore workforce.

We have a conscious approach to hiring local employees. At the same time, we use existing personnel from our fleet and offices in order to ensure valuable experience transfer. Our workforce still consists mostly of Norwegians (down from 44 % in 2014 to 42 % in 2015), while UK (26 %) and Brazil (22 %) comprise a large part of our employee base. Our Polish employees represent 4 % of the workforce.

Recruitment And GrowthDespite the current market situation, our employee base remained stable throughout 2015, with a total number of 1,184 employees (incl. temporary employees), which is a slight increase from 1,171 in 2014. This is mainly due to the start-up of Petrojarl Knarr and the manning of the Libra and Atlanta projects. Teekay Offshore Production recruited a total of 31 people onshore and 44 people offshore in 2015. The majority of these new hires were in Brazil.

We saw a turnover rate of offshore staff of only 1.83 % in 2015. Onshore our turnover rate was 5.19 %, which was slightly above target for the year.

TEEKAY OFFSHORE PRODUCTION SUPPORTS EQUAL OPPORTUNITY FOR EMPLOYEES, REGARDLESS OF

THEIR GENDER OR NATIONALITY.

Pet

roja

rl Va

rg

Page 12: Teekay Offshore Production Sustainability Report 2015

12

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

continuous improvement activities, are in place to support and improve our safety performance. There are annual activities like safety campaigns,gathering of safety representatives and HSE seminars for all vessels. Transparent HSE reporting is also an important part of our culture. People are encouraged to report not only incidents and hazardous conditions, but ideas and suggestions for improvements as well.

Health and SafetyEnsuring the health and safety of our people is our licence to operate, and our core values clearly state that we always put safety first. In Teekay Offshore Production, HSE management is an integral part of our manage-ment system and transcends organisational boundaries.

The safety of our people on FPSOs and in offices and sites around the world is a top priority and our objective is zero harm to personnel, environment and equipment. Extensive procedures and tools, as well as training and

Training and DevelopmentContinuous training and development of our staff is important to ensure that we at all times are up to date with operational procedures, technical equipment, legal requirements and internal requirements. Our procedures and system for training and development ensure that knowledge and training are kept up to date.

Each operating unit’s competency matrix is updated annually. In 2015, we started a project to further strengthen this process by reviewing the content of the existing competence matrices for all TOP FPSOs, and reviewing the existing system of how we identify competence requirements. The aim of the project is to prepare a proposal for how TOP can ensure quality-assured matrices in the future in a cost-effective way.

Our employees spent a total of 11,415 days in job-related courses in 2015, which is a 37 % increase from 2014. This development is mainly due to the crew training related to the start-up of Petrojarl Knarr.

Piranema Spirit

Page 13: Teekay Offshore Production Sustainability Report 2015

13

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

1,069 PERMANENT EMPLOYEES

MEN 87%WOMEN 13%

NU

MBE

R OF

EM

PLOY

EES

IN C

OUN

TRY

NU

MBE

R OF

EM

PLOY

EES

OFFS

HOR

E / O

NSH

ORE

NU

MBE

R OF

EM

PLOY

EES

BY N

ATIO

NAL

ITY

(not

div

ided

by

gend

er)

Men

Woman

SUPE

RVIS

ORS

BY G

ENDE

R

72 20 43

336

307291

Norway UK Brazil Norway UK Brazil Poland Other

444 283 239 43 60

Onshore Offshore

6411 100

76333

171

102Onshore Offshore

Page 14: Teekay Offshore Production Sustainability Report 2015

14

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

Operational SafetyOur safety performance was not satisfactory in 2015. We had eight lost time injuries and nine high potential incidents.

Definition: MTI - Medical Treatment Injuries: Injuries to per-sonell requiring medical treatment.LTI - Lost time injuries: Injuries to personnel where the person was not able to do his/her normal work the following day. TRIF - Total Recordable Injury Frequency: Number of MTI’s and LTI’s per million hours worked.

Our target in 2015 was a TRIF rate of <3.5. Unfortunately, we experienced several injuries to our personnel in 2015, bringing the TRIF to 7.5. This is unacceptable, and we are working hard to find out how we can turn this trend around.

The two most serious personnel injuries in 2015 were a steam leakage, causing injury to an operator on Petrojarl Cidade de Rio das Ostras in January, and a serious injury during crane operation on Voyageur Spirit in February. The rest of the LTI and MTI incidents were of less serious nature as hand and finger injuries, debris in eyes, «slip, trips and falls» etc.

Definition: Number of high potential HSE incidents (HSE incidents with serious potential consequences) in the fleet.

Our 2015 target was high potential frequency rate of < 3.0. However, we experienced too many high potential incidents in 2015, bringing the frequency up to 4.22.

The two personnel injuries described were the most serious high potential incidents in 2015.

In March 2015, a fire was reported in the HVAC system serving the forward machinery spaces on board Petrojarl Knarr. There was no injury to personnel and no environmental damage. The incident was investigated both internally and externally, and lessons learned were implemented and shared to avoid similar events happening again.

INJU

RIES

HIG

H P

OTEN

TIAL

INCI

DEN

TSGA

S LE

AKS

Definition: Number of gas leakages classified as high potential (>10 kg) in the fleet.

We experienced two gas leakages classified as serious in 2015. The first on Voyageur Spirit in June leading to release of 37 kg gas, and the second on Piranema Spirit in October releasing 29 kg gas.

MTI

LTI

4 4

5

8

82013 2014 2015

4 4 92013 2014 2015

2 202013 2014 2015

Page 15: Teekay Offshore Production Sustainability Report 2015

15

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

CASE STORY - “WHY DIDN’T WE STOP THE JOB?”

As a response to the high injury rate in the fleet over the last couple of years, a series of initiatives have been taken to turn this trend around through a TOP Operational and Safety Journey. One of these measures has been to focus on the actual people behind the HSE statistics sharing their personal refelctions on what actually went wrong.

In 2014, we had a serious injury on Petrojarl Varg, involving our very experienced Deck Foreman with over 25 years’ offshore experience within Teekay. In 2015, we asked him to share his story in a film, so that we all can learn and reflect on what we must do to avoid injuries, individually and together. In this case, there were several factors which led to his foot being crushed under a generator during a lifting job, all of which, in hindsight, was easy to see. That the job should have been stopped and risk reasses-sed before continuing the task.

We strongly believe that we all have a lot to learn from this story, independent of where we work. The film is therefore shared with companies and organisations we work with within the Oil and Gas Industry worldwide, and the feedback has been very positive.

Watch the film by following this link: teekay.com/hseq-videos/

Asset Integrity ManagementIn order to ensure safe and reliable operations, it is vital that we secure and maintain the integrity of our assets.

Teekay Offshore Production strives to ensure good design and maintenance of our facilities. This includes setting standards and acceptable risk criteria in design, as well as managing risks of major accidents through activities like monitoring, testing, measurements, inspections and repairs, and ensuring that adequate maintenance programs are established to maintain barriers.

One of our main asset integrity focus areas in 2015 was the revised mana-gement of change process to improve the way our units maintain technical integrity by a structured process of review and approval of changes.

Petrojarl Knarr

Page 16: Teekay Offshore Production Sustainability Report 2015

16

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Barrier Management SystemA new Barrier Management System was implemented on our two vessels on the Norwegian shelf, Petrojarl Varg and Petrojarl Knarr. This system is established to ensure that we have control of the integrity of the vessel, and is an important part in meeting Norwegian Petroleum Safety Authority (PSA) regulations and requirements for management of major accident risk.

The development of the new system is also a great demonstration of Teekay SPIRIT values as it is an in-house development, saving cost and utilizing the people and talent within our organisation.

PEOPLE

Project HSE ManagementHSE management is an integral part of our project management when executing projects. A specific project HSSE plan (Health, Safety, Security and Sustainability) is developed for each site during the construction phase. In 2015 we had two projects in this phase, the Atlanta project in the Net-herlands and the Libra project in Singapore (OOGTK - Odebrecht Oil and Gas/Teekay Joint Venture).

Whereas we are not directly responsible for the day-to-day HSE manage-ment during project execution, we aim to influence the HSE standards in the shipyard by working with the shipyard personnel in developing the project HSSE Plan, by encouraging HSE reporting and by site audits that are continuously carried out throughout the project.

Pira

nem

a S

pirit

Page 17: Teekay Offshore Production Sustainability Report 2015

17

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

Occupational HealthWe believe that a healthy workplace, safe work environment and satisfied employees contribute to a robust workplace which attracts good employees, and this is reflected in our occupational health management system. We strive to involve the crew in all stages of the management process, and welcome their initiatives in improving and developing their own workplace. We aim to take proactive and reactive measures to reduce the occupational health risk in our fleet. We have identified noise, chemical exposure, and heavy and repetitive manual work as the main occupational health risks.

Teekay Offshore Production is certified against OHSAS 18001 (international standard for health and safety).

In 2015, the focus in occupational health was to further reduce sick leave for each FPSO in the fleet, through a series of proactive and reactive measures.

Our Social FootprintIn Teekay Offshore Production, we acknowledge that our business doesn't exist in isolation, nor is it simply a way of making money. We operate in different parts of the world where our employees, our customers, suppliers and the local community will be affected by our operations and activities and depend on us being a responsible, long-term oriented company.

Definition: Short-term, long-term and restricted work sick leave. For offshore crew only.

Target was to reduce sick leave by minimum 10% compared to last year per FPSO. Unfortunately, this target was not reached. The year started with a high sick leave in the fleet in general, but from the last two quarters of 2015 the sick leave have showed a declining trend.

SICK

LEA

VE

FPS

O C

idad

e de

Itaj

5.4 4.3 4.32013 2014 2015

Page 18: Teekay Offshore Production Sustainability Report 2015

18

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PEOPLE

Community InvestmentsIn spite of the tough times in the oil industry worldwide, Teekay Offshore Production (TOP), decided in 2015 to donate funds normally allocated to Christmas gifts for both onshore and offshore employees, to the Save the Children Fund, in particular the “Children are Freezing” Christmas cam-paign for refugees, in the amount of NOK 500,000.

In addition, through private donations from Teekay Offshore (TOO) employees to the “Teekay Offshore Cares” Campaign on the Save the Children web site, we managed to raise NOK 109,115. In total then, TOO donated to the Save the Children Fund in 2015, NOK 609,115.

In addition to this, before the above-mentioned campaigns started, TOPs Social Footprints Fund had already donated to the following charities in the countries in which we operate our FPSOs:

TOP, also through its Social Footprints Funds, supports sports and / or cultural activities in which all TOP permanent employees (both onshore and offshore) and / or their children, are eligible to participate. A draw is held annually, based on applications which have come in from the employees for support for said activities. A total of 10 names are drawn by the Social Footprints Committee for a maximum support of NOK 10,000 per winner. Total amount of support is NOK 100,000.

Norway:

• NOK 20,000 to the Child Cancer Association, Trøndelag County• NOK 15,000 to the St. Olav’s Hospital Clowns• NOK 10,000 to The Church City Mission in Norway – Trøndelag Div.

UK:

• NOK 20,000 to The Lewis Moody Foundation• NOK 15,000 to Bounce Higher (social outreach programme)

Brazil:

• NOK 20,000 to “SAME” & Creche do Almir do Picolé (a local Aracaju charity for needy children and needy elderly on outskirts of Aracaju, Brazil) "Bounce Higher", a Children and Family Work Programme running out of St. Andrews

Church in Borrowstounness in Scotland, was one of the winners of NOK 10,000 from the Social Footprints Found in 2015.

Page 19: Teekay Offshore Production Sustainability Report 2015

19

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PLANET

Our FPSOs operate in some of the harshest and most challenging climates on earth. We also work in an industry with significant effects on the natural environment. We therefore have a responsibility to constantly focus on the environmental effects of our daily operations, and to avoid accidents that might have consequences for the environment, people and/or equipment.

O n behalf of our clients, we produce energy for consumption and work to meet the increasing energy demand of the world market. At the same time, the aim is to continuously improve our environmental performance. Teekay Offshore Production’s environmental vision is no damage to the environment,

which in practical terms means working actively to minimise any negative influence our work has on the environment. Our goal is to make environmental responsibility an integral part of all our tasks and activities.

Our commitment to environmental responsibility is integrated in our systems and procedures, and all of our vessels as well as our main office, are ISO14001-certified.

This chapter explores our environmental performance in 2015.

Page 20: Teekay Offshore Production Sustainability Report 2015

20

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PLANET

Environmental ImpactIn general, we are satisfied with the awareness throughout our fleet of operating in a manner that influences the environment as little as possible. However, we see challenges related to operating in mature fields requiring more energy input to sustain oil production. This will necessarily have an impact on our environmental results. The same will apply to the production start-up of a new field such as the Knarr field, as flaring is neccessary for safety purposes, but contribues to emissions to air.

Definition: Greenhouse gas emissions (CO2, CH4 and nmVOC) in CO2 equivalents from TOP operations in thousand tonnes.

*) Emission figures from the two tankers, Petronordic and Petroatlantic were included in 2013 data. These vessels are no longer in operation for TOP.

Definition: Average specific GHG emission (kg CO2 equivalents per liquid treated). ”Liquid treated” includes both oil equivalents produced and produced water handled.

Although the total GHG Emissions to air have increased from 2014 to 2015, has specific GHG emissions decreased due to new production (Petrojarl Knarr).

SPEC

IFIC

GH

G EM

ISSI

ONS

GHG

EMIS

SION

S

Emissions to Air

Our GHG emissions have increased substantially from 2014 to 2015. This is mainly due to the fact that Petrojarl Knarr came into operation in 2015, with a large amount of flaring in the start-up phase. With Petrojarl Banff back in full operation, this also contributes to the increase in GHG emissions.

In 2015, the UK Government introduced the Energy Savings Opportunity Scheme (ESOS). This new legislation is mandatory for all UK companies which employ over 250 people and meet certain financial criteria. We were pleased that compliance for our UK operations was achieved well before the deadline.

We are happy to see that the positive trend with regards to accidental spills continues in 2015.

All environmental data are consolidated based on the principle of operational control, i.e. includes data from units operated by TOP.

1.153.4707.9737.3

2013 2014 2015 2013 2014 2015

181 218 208*)

Page 21: Teekay Offshore Production Sustainability Report 2015

21

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PLANET

Discharges to Sea

PROD

UCE

D W

ATER

OIL

CO

NTE

NT

(OIW

)

Definition: Average produced water oil content (mg/l).

We see a slight decrease in the average OiW from 2014 to 2015. The average is still high due to issues with the de- oilifier on Petrojarl Foinaven. Two of our FPSOs do not have produced water, and are therefore not included in produced water figures.

TOTA

L OI

L IN

WAT

ER

We see a substantial increase in the amount of oil to water through produced water. This increase is mainly due to two factors, the first being more produced water being released to sea from Petrojarl Foinaven in 2015, and late life issues on the Varg Field, increasing the amount of produced water.

Definition: Weight of oil discharged to water through produced water in tonnes.

While our vision is zero spills to sea, our target for 2015 was to maintain frequency of spills below <5.0. With a frequency of 1.41, this target was well met. We had a total of three spills to sea in 2015: A diesel fuel overflow from minute tank (estimated to 400 l); a water injection minimum flow valve passing produced water overboard (estimated to 350 l); and a spill to sea of calcium nitrate due to burst hose (100 l).

Definition: Total number of accidental discharges of oil and chemicals to sea.

Waste Management

ACCI

DEN

TAL

SPIL

LSW

ASTE

PRO

DUCT

ION

We see an increase in the amount of waste produced on board our FPSOs from 2014 to 2015. The main reason for this increase is normal variations due to activities, e.g. where a major turnaround has been performed, the amount of waste increases.

Definition: Total waste (hazardous and general waste) produced on our FPSOs.

WAS

TE S

EGRE

GATI

ONThe waste segregation rate remains high and stable, with an average of 80 % of the general waste being segregated on board.

Definition: Average percentage of general waste segregated onboard our FPSOs.

*) Waste figures from the two tankers Petronordic and Petroatlantic were included in 2013 data. These vessels are no longer in operation for TOP.

20.2 24.8 22.8

2013 2014 2015

32.5 17 61.2

2013 2014 2015

692 480 5662013 2014 2015

76 80 802013 2014 2015

6

1

13

32013 2014 2015

Authory reported

Non-reportable

*)

*)

Page 22: Teekay Offshore Production Sustainability Report 2015

22

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PROFIT

Running a profitable business is a goal shared by all trading companies. Arguably, from the perspective of sustainability, profit is the most critical part of the triple bottom line. In the current oil and gas market situation, the importance of this aspect has become even more evident, with companies looking at organisational and financial efficiencies to ensure the long-term sustainability of their businesses.

I n this chapter, we take a closer look at the operational performance, international development and financial highlights of 2015.

Pet

roja

rl C

idad

e de

Rio

das

Ost

ras

Page 23: Teekay Offshore Production Sustainability Report 2015

23

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PROFIT

Adapting to the “New Normal”With oil prices plummeting more rapidly and to lower levels than any ana-lyst could have predicted, 2015 was for TOP, as for all other players in the industry, a year for coming to term with and adapting to the “New Normal”.

In December, Teekay Offshore Partners (NYSE: TOO) announced that it will temporarily cut its quarterly dividends paid to shareholders and rea- locate this cash to finance its existing growth projects. This is a significant change to the way we have financed the growth of our businesses over the last decade and is a reflection of the market situation of 2015.

Another reflection of the New Normal is the shift from growth focus to securing our existing business while finding efficiency improvement. Several initiatives were started in 2015 focusing both on reducing cost and improving the organisational efficiency of TOP.

TOTAL OIL PRODUCTION

32.56 MILL. BARRELS

REVENUES:

809 MILLION $US

ASSET VALUE:

3.4 BILLION $US

Supply ChainTeekay Offshore Production’s suppliers are ranging from large strategic suppliers of services and goods to smaller suppliers of specialised equip-ment, systems etc. Our suppliers are located around the world and supply our operations, offices and projects worldwide.

We are committed to using suppliers that maintain high standards of inte-grity, HSE focus and quality, and our expectations are raised and followed up throughout the process from pre-qualification onwards, to continuous monitoring and reevaluation of strategic suppliers.

We strive to use local suppliers in our countries of operations. Excluding our projects, we purchased goods and services for over 478 million USD in 2015. Of these, purchases in Norway accounted for approximately 215 MUSD (77 % local content), UK for over 246 MUSD (88 % local content) and Brazil for over 17.5 MUSD (78 % local content).

FinanceOur financial performance in 2015 has been solid, with figures for revenue and income increasing from 2014 to 2015. An overview of our key financial results for 2015 can be found under «Key Figures» on page 25.

Operational Excellence Ensuring high regularity of production, excellent HSE results and streamli-ned cooperation with our customers is key to maintaining our standing in the market. The process plant uptime on our FPSOs, indicating our ability to provide reliable production and operation to our clients. With a Produ-ction Utilization Factor (PUF) of 93.3%, we were slightly below our goal for 2015 of 94.5%.

Page 24: Teekay Offshore Production Sustainability Report 2015

24

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

PROFIT

Growth Teekay Offshore Production’s strategy in the past few years has been to expand its operations. With the new market situation, the strategy is shif-ting towards ensuring the efficiency of our operations and executing on the projects already in our portfolio.

One of our main achievements in 2015 was bringing Petrojarl Knarr into operation in March 2015. Our Petrojarl I for Atlanta project in Rotterdam and the Libra project in Singapore (for Joint Venture OOGTK) are ongoing.

Ethics and Anti-CorruptionAt Teekay, we acknowledge that it is not enough to do the right things; it is also important to do them the right way. We are aware of and strictly obey the laws and regulations that govern the management of our business. We are responsible for understanding these laws and regulations as they apply to our jobs and for preventing, detecting and reporting instances of non-compliance to the Company’s Chief Compliance Officer. It is our policy to conduct all of our business with integrity. We take a zero-tolerance app- roach to bribery and corruption and are committed to acting professionally,

fairly and in an honest and ethical manner in all our business dealings and relationships, wherever we operate or propose to operate, and to imple-menting and enforcing effective systems to counter bribery and corruption. We will uphold all laws relevant to countering bribery and corruption in all the jurisdictions in which we operate, including the UK Bribery Act 2010 (the “Bribery Act”) and the United States Foreign Corrupt Practices Act of 1977, as amended (the “FCPA”) and any other applicable laws, statutes, regulations or codes of other countries relating to anti-bribery or anti-corruption.

The Standards of Business Conduct (SBC) reflect our continued commit-ment to ethical business practices and regulatory compliance. In order to ensure knowledge of the policy and specifically anti-corruption legislation, all onshore employees are required to participate in anti-corruption training annually.

All Teekay Offshore Production employees can submit confidential con-cerns regarding accounting, fraud or financial auditing matters through the Business Conduct Reporting Tool, or by contacting an externally operated toll-free hotline.

Petrojarl I

Page 25: Teekay Offshore Production Sustainability Report 2015

25

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

KEY FIGURES

2013 2014 2015

PEOPLE

Health and Safety

Total recordable injury frequency1 2.4 5.07 7.4

Lost time injuries 0 4 8

High potential incident frequency2 2.4 2.25 4.22

Sick leave (%)3 5.4 4.3 4.3

Fatalities 0 0 0

HSE ideas registered4 2646 2800 2866

Human Resources

Proportion of female employees (%) 12.4 10.9 13.7

Turnover rate % (onshore/oppshore) 7.8 / 9 2.6 / 4.2 5.19 / 1.8

PLANET

Total GHG (Green House Gases) emissions (CO2 equivalent, thousand tons)

737.3 708 1,153

Flaring (MSm3) 86.4 85.3 163.3

Accidental discharges (number of)5 1 3 3

Oil discharged with produced water (tons) 32.5 17 61.2

Waste produced offhore (tons) 692 480 566

Waste segregation (%) 76 80 80

PROFIT

Production

Combined oil production (million barrels)6 20.7 22.1 32.

Production utilization factor, PUF (vol % of oil production against production target)

>94.5 94.7 >94.5

Finance (number in thousand US dollars)7

Revenues 567,620 614,463 809,396

Income (loss) from vessel operations (1,918) 31,022 124,926

Total asset of operating segments at year end 2,836,998 3,442,109 3,427,726

1 Lost time injuries plus medical treatment injuries per million man-hours worked2 Reported high-potential incidents per million man hours worked3 Offshore crew only4 HSE ideas = all health, safety, environment and security ideas, including performance improvement ideas and positive observation reports5 Authority-reported oil and chemical spills6 Incl. Hummingbird Spirit7 For further details see the segment reporting part of the financial statements from Teekay Corporation. These can be found on www.teekay.com.

Page 26: Teekay Offshore Production Sustainability Report 2015

26

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

Teek

ay O

ffsho

re P

rodu

ctio

n -

2015

Sus

tain

abili

ty R

epor

t

BRINGING ENERGY TO THE WORLD WITH TEEKAY SPIRIT

Petrojarl Varg