16
DAIRY FARM AHMER KHAN 16102 OSAMA AHMED ANSARI 16103

Dairy farm

Embed Size (px)

Citation preview

Page 1: Dairy farm

DAIRY FARM

AHMER KHAN 16102OSAMA AHMED ANSARI 16103

Page 2: Dairy farm

INTRODUCTION

• Dairy production is an all-inclusive activity, related to animal care, reproduction, feeding, and management. It is defined as all those aspects and activities relating to rising of dairy animals during their various phases of life to get wholesome milk. The proposed project is to be in the vicinity of Karachi. Livestock production is an integral part of Pakistan's agriculture sector and plays a vital role in the national economy.

Page 3: Dairy farm

PROJECT CHARTER

Page 4: Dairy farm
Page 5: Dairy farm

PROJECT SCOPE MANAGEMENT

• The total cost of the project is Rs.40,000,000 for purchasing the animals, constructing the farm and installation of machines and equipments.

• In machinery, 10 water pumps are needed for water need and 50 milking machine for milking animals.

Page 6: Dairy farm

STAKEHOLDERS

• Owner• Labor• Gawalas• Milk contractors• Vaccinators• Silage supplier• Concrete feed (ingredients ) supplier

Page 7: Dairy farm

WORK BREAKDOWN STRUCTUREdairy farm

planning

procurement

controlling

communication

risk manangment

schedule

purchasig

animals

machinery

feed

establishing

building

machinery installation

controlling

animal housing

deceases control

Page 8: Dairy farm

ACTIVITY TABLE

Page 9: Dairy farm

GANTT CHART

Page 10: Dairy farm

NETWORK DIAGRAM

B-F-G-J-K-L-M-N-O= 12+4+25+70+21+14+10+4+9= 169 Days

Page 11: Dairy farm

PROJECT COST

Page 12: Dairy farm
Page 13: Dairy farm

PROJECT PROCUREMENT

• The suppliers will be selected on the following criteria:

• Low cost• Quality of the materials• Timely delivery• Reputation in the market

Page 14: Dairy farm

PROJECT QUALITY MANAGEMENT• Customer satisfaction is our main aim. So we are very much Quality Conscious.

The Quality of the project are checked against the set standards of the ISO. A.O Farms (Pvt.) Ltd will carry forward its own quality management plan which is as follows:

• Project Schedule baseline has been set and sent to all the related departments in the company so that project will be completed on time and standard work hours have also been mentioned.

• Quality Manager and Site Civil Engineer will be present on site and monitor all the work along with the construction team lead and weekly reporting will be done to the Project Manager.

• Construction will be done as per the given approved structural diagrams. • Animals Purchased for the Farm will of good quality and as per the given

standards and they will be purchased in the presence of a Veterinary doctor which will be hired for the Farm in the last phase of completion of the farm.

Page 15: Dairy farm

PROJECT RISK MANAGEMENT

Page 16: Dairy farm

CONCLUSION

• Profitable Dairy Business moves around the management. Dairying gives huge profit if it is well managed while mismanagement leads to huge loss as well. So, the implementation of the project should be under the supervision of a professionally skilled person. A competent farm manager or consultant is never expensive. A skilled professional should be hired for establishing and running a profitable dairy farm.