INTEGRATED INFRASTRUCTURE – AN INNOVATIVE SOLUTION FOR WATER QUALITY AND FLOOD CONTROL Randy Thomas, PE South Regional Engineer ACF Environmental [email protected] www.acfenvironmental.com

Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Embed Size (px)

Citation preview

Page 1: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

INTEGRATED INFRASTRUCTURE – AN INNOVATIVE SOLUTION FOR WATER QUALITY AND

FLOOD CONTROLRandy Thomas, PE

South Regional EngineerACF Environmental

[email protected]

Page 2: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

• Integrated Infrastructure Components • P-ACB/M Pavement - Permeable Articulating

Concrete Block / Mats (PaveDrain)• MPSS - Modular Plastic Stormwater Storage (R-

Tank)• HPMBS - High Performance Modular Biofiltration

System (FocalPoint)• Design and Research• Case Studies

Integrated Infrastructure

Page 3: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure• New BMPs (Best Management Practices) that

Work with Nature• BMPs that Stand Alone as Integrated

Systems to Accomplish Multiple Needs• BMPs that Work Together to Better Manage

Stormwater: Integration

The Infrastructure of Tomorrow

Page 4: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure

Page 5: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB: Permeable Articulating Concrete BlockConcrete P-ACB with 3 Functions

• Pavement – Handles Traffic Loads with 6000 psi Concrete• Drains – Open Joints Move Water Without Inlets• Stores & Infiltrates – Stores 1” of Water

Page 6: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

DETAIL A

DETAIL A

P-ACB: Unit Details

Page 7: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB: System Design

Increase rock base or add void space for additional water storage

Open Gap ~1/4”

Storage above base

Page 8: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACBWhy Use P-ACB?

• HS20/HS25 Load Rated• High Flow – 2000 in/hr• ADA Compliant• Aesthetically Pleasing

Page 9: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACBP-ACB has 10X the Infiltration Rate of Newly Installed Conventional Permeable Pavements

Newly Installed Permeable Pavement:

50-150 in/hourNewly Installed P-ACB:

Guaranteed 2,000 in/hour

Page 10: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB: 10X The Flow Rate – How?

PaveDrain Blocks DO NOT Require Filler1

47 Pound Block

2 3

4

56

Page 11: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB: 10X The Flow Rate –What does that look like?

PaveDrain Blocks DO NOT Require Filler

47 Pound Block

1

2 3

4

56

• 1 year old• Permeable Pavers• Pervious Concrete• Pervious Asphalt

• 2 year old• P-ACB

Page 12: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

700 Gallons drained in less than one minute

Ft Lauderdale – P-ACB Installation Firetruck Demonstration

P-ACB: 10X The Flow Rate –What does that look like?

Page 13: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB: Ease of Maintenance

Whirlwind

Page 14: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Installation: Mats

Page 15: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Installation: Hand-Placed

Page 16: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: City Streets Across USA

Page 17: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: City Streets Across USA

Page 18: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Secondary Roads

Page 19: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Residential Streets

Page 20: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Parking Lots

Page 21: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Entry Roundabouts

Page 22: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Alleyways/Street Parking

Page 23: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Parking Stalls

Page 24: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Applications: Road Shoulders

Page 25: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure

Page 26: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: Modular Plastic Stormwater Storage

Page 27: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Single ModuleSize:(W) 16.06”(L) 26.97”(H) 17.72”Volume: 33.031 gallons

Double ModuleSize:(W) 16.06”(L) 26.97”(H) 34.65”Volume: 65.085 gallons

Triple ModuleSize:(W) 16.06”(L) 26.97”(H) 51.57”Volume: 88.135 gallons

• 95% Sustainable Void Space• High Compressive Strength

• (33.4 PSI – ASTM D 2412 / D 2418)• Multiple Heights• H20 Loading – Minimum 20” Cover

MPSS: HD- Heavy Duty Tank

Page 28: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

• 95% Sustainable Void Space• Higher Compressive Strength

• (42.9 PSI – ASTM D 2412 / D 2418)• 9.5” High• H20 Loading – Minimum 18” Cover

MPSS: SD- Super Duty Tank

Page 29: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

• 90% Sustainable Void Space• Highest Compressive Strength (320 PSI)• 2” Height Increments

MPSS: XD- Extreme Duty Tank

Page 30: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

• 90% Sustainable Void Space• Highest Compressive Strength (320 PSI)• 2” Height Increments• H20 Loading - Minimum 6” Cover

MPSS: XD- Extreme Duty Tank

Page 31: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: Assembly

Page 32: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Typical MPSS Design

Page 33: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

First Installation In the US in 2003Retention/Infiltration Tank – Arlington, VA

Page 34: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Retention/Infiltration Tank – Arlington, VA

Page 35: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Retention/Infiltration Tank – Arlington, VA

Page 36: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Retention/Infiltration Tank – Arlington, VA

Tank is backfilled ready for driveway construction on top.

Page 37: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Retention/Infiltration Tank – Arlington, VA

Overflow to Curb

Page 38: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: Characteristics• 95% Void Space = Smaller Footprint for Water Storage

– Less disturbance of site– Smaller excavations– Avoid underground utilities

• Modular Versatility– Allows Engineer Incredible Flexibility and Creativity with Design– Offers the Contractor Numerous Possibilities to Overcome Problems

• Easily Handles HS20 and HS25 Loads

Page 39: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Arched Chamber + GravelVs

MPSSLowe’s Home Improvement Warehouse

Orange Park FL

Case Study: Reduced Footprint

Page 40: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Case Study: Reduced Footprint

Arched Chamber footprint - 40’ x 500’ x 9.5’ (7,037 cy)Double Tank footprint - 30’ x 401’ x 5’ (2,228 cy)

Existing sewer line saved

Triple Tank footprint - 30’ X 291’ x 6.5’ (2,102 cy)

Page 41: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: Characteristics• 95% Void Space = Smaller Footprint for Water Storage

– Less disturbance of site– Smaller excavations– Avoid underground utilities

• Modular Versatility– Allows Engineer Incredible Flexibility and Creativity with Design– Offers the Contractor Numerous Possibilities to Overcome Problems

• Easily Handles HS20 and HS25 Loads

Page 42: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Design Flexibility: Field AdjustmentsOak Hammock Condo’sFt. Lauderdale, FL

Page 43: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Design Flexibility: Complex Shapes

CVS PharmacyRichmond, VA

Kimley-Horn

Page 44: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Design Flexibility: Adjust Top of MPSS

.511.522.53

4

Route 1 Widening - NJDOTEdison, NJ

Finished Grade Falls Diagonally Across Site

Page 45: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Design Flexibility: Adjust Bottom of MPSS

Page 46: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: Characteristics• 95% Void Space = Smaller Footprint for Water Storage

– Less disturbance of site– Smaller excavations– Avoid underground utilities

• Modular Versatility– Allows Engineer Incredible Flexibility and Creativity with Design– Offers the Contractor Numerous Possibilities to Overcome Problems

• Easily Handles HS20 and HS25 Loads

Page 47: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Compressive Strength Testing at Independent Laboratories

33.4 psi vs 14.64 psi = SAFETY FACTOR OF 2.28

Page 48: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Compressive Strength: Field VerificationUnpaved Trucking Terminal Paved Truck Stop

Paved Commercial Grass Fire Lane

Page 49: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: ApplicationsTank Applications

RetentionInfiltration / Dry WellHarvesting / Recycling

DetentionLinear Applications

Bio Swale Infiltration Trench Bioretention

Page 50: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Tank Application: Arlington Toyota, Jacksonville, FL

Page 51: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Tank Application: Arlington Toyota, Jacksonville, FL

Page 52: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Tank Application: Arlington Toyota, Jacksonville, FL

Page 53: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: ApplicationsTank Applications

Linear Applications

Page 54: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

Water running off the road and down an embankment flows downhill and across road, leading to Major Road Repair.

VDOT built this project with their Maintenance Crew in

Fall, 2004.

Page 55: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

The area hadn’t seen rain in four days, but water bled into the excavation from the road and

embankment right away.

Page 56: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

Backfilled with Sand, R-Tanks drained through two - 6” pipes.

Page 57: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

The Sand was Compacted and Seeded, and an Erosion Control Blanket was Installed.

Page 58: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

Page 59: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

Hurricane Gaston Dropped 14” of Rain in Less than 24 Hours on this site within weeks of installation. The swale worked perfectly and with no damage.

Page 60: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Linear Application: VDOT Route 10, Hopewell, VA

No Maintenance by VDOTFunctioning as Designed

June, 2006

Page 61: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS: Maintenance

Page 62: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Maintenance: Critical Design Feature- Pre-TreatmentTrash Guard PLUS

Page 63: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSS Maintenance: Maintenance Ports / Backflushing

Pump out MPSS to remove Sediment

Back-flushing can be achieved through Maintenance Port

Page 64: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure

Page 65: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Rain Gardens Have Been In Use Since the Late 1980’s as the Cornerstone of Low Impact Development (LID)

HPMBS: High Performance Modular Biofiltration System

Page 66: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Filters Stormwater Using thePhysical, Chemical andBiological Mechanisms of aSoil, Plant and MicrobeComplex to RemovePollutants Typically Found inUrban Runoff.

HIGH PERFORMANCE

MODULAR BIOFILTRATION

SYSTEM(HPMBS)

What is HPMBS?

HPMBS: High Performance Modular Biofiltration System

Page 67: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

High Performance Biofiltration Media

Modular High Performance Underdrain/Storage

Open Mesh SeparatorClean, Bridging Stone

Clean, Shredded Hardwood Mulch

Planting

Geotextile or Liner Envelope

What is HPMBS?

High Performance Biofiltation Media

HPMBS: High Performance Modular Biofiltration System

Page 68: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

• Viewed as a high rate Rain Garden/Biofiltration System

• High rate allows footprint to be significantly smaller than traditional Bioretention.

What is HPMBS?

HPMBS: High Performance Modular Biofiltration System

Page 69: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Pre-Approved Nutrient Removal Efficiencies

Pollutant % Removal

TSS > 80%Total

Phosphorus ≥ 60%Total

Nitrogen ≥ 48%

Nutrient Removal

Page 70: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

To facilitate the adoption of effective technologies for pollutant source control and remediation, the Department has created a standardized process through which consultants, businesses and organizations can request an agency review of a proposed strategy. Proposals receiving a favorable review will be included in a library of accepted technologies that will be published on the Department's website. It should be noted that Departmental acceptance suggests that Agency experts believe a proposed technology has the potential to be effective in a specific application but does not imply commercial endorsement or recommendation for use.

Lee Marchman, P.E.State Stormwater EngineerEngineering, Hydrology and Geology Program2600 Blair Stone Road, MS3566Tallahassee, FL 32399850-245-8520

HPMBS: FDEP Acceptance

Page 71: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Why Do Biofiltration Systems Fail?1. Low-Flow Soils (5 in/hour)2. Poorly Blended Soils (Mixed On-Site)3. Mismatched Components in Soil

Blend4. Bridging Stone Not Paired with Soils5. Geotextiles in Cross-Section6. Construction Contamination7. Lack of Maintenance

FocalPoint Resolution:1. High-Flow Soils (100 in/hour)2. Double-Blended @ Plant3. Consistent Components –

Shipped in SuperSacks4. Pre-Analyzed Bridging Stone5. Mesh Replaces Geotextiles6. Protected Until Commissioned7. First Year of Maintenance

Included

HPMBS: Comparison to Conventional Raingardens

Page 72: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Performance Specification

Page 73: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Performance SpecificationIn-Situ Hydraulic Conductivity Testing

Page 74: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Applications

Page 75: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Applications

Page 76: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Applications

Page 77: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Applications

Page 78: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Case StudySettler’s Market

Williamsburg Virginia

Page 79: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: Pre-TreatmentRain Guardian

• Developed by Anoka County Conservation District

• Traps Trash & Debris Above Grate• Runoff Drops Through Grate and Passes

Through Filter, Into Bioretention Cell• Overflows Pass Through Grate BEHIND

Filter or Overtop Weir• Maintenance is Easy.

• Remove Grate• Shovel Sediment out of Unit• Brush Film from Filter

• Very Inexpensive• $1500 with Pedestrian Grate• $1750 with H-10 Grate

Page 80: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS: MaintenanceSimple Maintenance

FocalPoint Media•Perform Infiltration Testing Yearly•Will IMPROVE with Time & Plant Growth

Mulch:•Acts as a Pre-Treatment Mechanism•Traps Trash, Sediments & Particulates•Remove & Replace Mulch Every 6-12 Months•Schedule will Depend on Site Characteristics•Cut Back Plants & Replace Dead Ones

Page 81: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Traditional Systems Are Expensive to Maintain…Costs:•Jet Vac Truck

•Typical Costs = $250/Hour•Four Hour Minimum

•Cartridges Must Be Replaced Yearly•Typical Costs = $250 - $750/ea

Virtually All Systems Have a Bypass•How do Property Owners KNOW They Need Maintenance?

HPMBS: Maintenance

Page 82: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

HPMBS Maintenance•Like All Bioretention Systems, HPMBS Systems Talk to Their Owners•Maintain System When Holds Water for More Than 24 Hours•Remove Mulch & Replace•Cut Back Plants•Replace Dead Plants•Costs are VERY Manageable

HPMBS: Maintenance

Page 83: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure

Page 84: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB

MPSS

Flow

Integrated Infrastructure: P-ACB + MPSS System Design

Page 85: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSSXD

P-ACB + MPSSXD > MPSSHD

Integrated Infrastructure: P-ACB + MPSS-XD >> MPSS-HD System Design

MPSSHD

Page 86: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

MPSSXD

P-ACB + MPSSXD > HPMBS

HPMBS

Integrated Infrastructure: P-ACB + MPSS-XD >> HPMBS System Design

Page 87: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSSXD > HPMBSIntegrated Infrastructure: P-ACB + MPSS-XD >> HPMBS System Design

Page 88: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Design

• Replace conventional stormwaterinlets

P-ACB + MPSS Stormwater Inlet

Page 89: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

UCF Stormwater Academy• 4 Test Sections• Integrated

Infrastructure• ERIK devices used to

measure permeability• Clogged with Sandy

and Silty Soils• Measure rejuvenation

capability

Page 90: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

UCF Stormwater Academy

P-ACB / Geotextile / 6” gravel / Geotextile

P-ACB / 6” gravel / Geotextile P-ACB / 6” gravel / Geotextile / MPSSXD / Geotextile

P-ACB / 6” gravel / Geogrid / 12” Gravel / Geotextile / MPSSSD / Geotextile

Page 91: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

UCF Stormwater Academy

Page 92: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

UCF Stormwater Academy

Page 93: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

Stormwater Academy at UCF, Orlando

Page 94: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

UCF Stormwater Academy

Short ERIK Test Results

From 11,021 in/hrto

13,602 in/hr

Page 95: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: System Research

UCF – Sediment Loading and Regeneration

Average Short ERIK Values60% to 78% Regenerated

Typical Regenerated Infiltration of 7000 to 8900 in/hr

Page 96: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

UCF Stormwater Management Academy – Design Tools

• Pervious Pavement Design Aid• Determine CN and C

• BMPTRAINS• Comprehensive Stormwater

Design ToolAvailable for download at:

http://stormwater.ucf.edu/computer-programs/

Page 97: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure

Page 98: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

• Engineer: E-Sciences, Orlando• E.O.R.: Ryan Mitchell, PE• Runoff Area: 1.4 Acres• PaveDrain Area: 8,868 SF• Parking Lot Cross-section

• 5.6” PaveDrain• 6” AASHTO #57 (crushed

granite)• 3.5’ AASHTO #2 open gravel• FDOT Index 199, Type D2

geotextile envelope• Stormwater Runoff Retention: 2.5”• Stormwater Quality

Improvements:• Reduce TSS by 95%• Reduce Nitrogen by 95%• Reduce Phosphorous by 95%

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 99: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Layout Drawings

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 100: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Layout Drawings

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 101: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Layout Drawings

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 102: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Original Limerock Parking Lot Excavation of Gravel Reservoir

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 103: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Placement of 4 Foot Thick Gravel Reservoir

Compaction of #57 Stone Subbase

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 104: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Starting in NE Corner with End Blocks and Half Blocks

Colored Blocks Installed Throughout

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 105: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Installation P-ACB Installation

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 106: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Overview of P-ACB Installation

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 107: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Cut P-ACB Blocks Marking Cuts on P-ACB

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 108: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Completed P-ACB Installation

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 109: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB Case Study: Highland Avenue Parking Lot, Melbourne, FL

Cross Section

• 4 Ft of Gravel• 4 Ft – 6 In of Undercut• Integrated Infrastructure??

Page 110: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: P-ACB + MPSS-SD

Cross Section – Equivalent Retention Volume

• 18 In of Gravel• 9.5 In MPSS-SD

• 21.5 In Less Undercutting• 30 In Less Gravel

MPSS-SD

6”12”

9.5”

Page 111: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: P-ACB + MPSS-XD

Cross Section – Equivalent Retention Volume

• 6 In of Gravel• 14 In MPSS-XD

• 28 In Less Undercutting• 42 In Less Gravel

MPSS-XD (7 Layers)6”14”

Page 112: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS Case Study: 72 Bishop Street, Portland, ME

• In Design• Q4, 2016 Construction• Redevelopment project design

• Design for stormwater collection and detention• Elevated storage behind lined retaining wall• Stormwater detention design with pipe outfall

• 2000 SF P-ACB• 2500 CF MPSS

Page 113: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS Case Study: Route 54 Sidewalk Project, Fenwick Island, DE

• In Design• Q4, 2016 Construction• Design for High GWT, Flood Control and Pedestrian Safety• DelDot rejected Porous Concrete due to maintenance concerns• P-ACB Sidewalk and Pavement Shoulder Drain

• Both drain to underlying MPSS-SD drain/reservoir• 2000 LF of Pavement treated

• 18,000 SF P-ACB• 6,200 CF MPSS

Page 114: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS Case Study: Upgrades to Central Advanced WWTP, Ft. Myers, FL

• Designer: AECOM, Fort Myers• Christian Colarusso, EI• Donovan Bramlett, PE

• In Design• 2017 Construction• Conversion of Detention Basin to

P-ACB Pavement and MPSS• +/- 17,000 CF of Storage

Page 115: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS Case Study: Upgrades to Central Advanced WWTP, Ft. Myers, FL

• P-ACB Finish Grade - EL 6.0• Top of MPSS - EL 4.12• 25 Year Peak Flood - EL 3.0• MPSS Invert - EL 1.3• SHGWT - EL 0.0

Page 116: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS Case Study: Upgrades to Central Advanced WWTP, Ft. Myers, FL

• 5300 SF P-ACB Pavement• 8100 CF MPSS-HD – “Doubles”• MPSS enveloped in 8 oz/sy NW Geotextile• Void space in open gravel backfill, base and cover used for storage

• 30% Void Space• Woven monofilament (10 % open area) geotextile filter/separator

between open gravel and subgrade

Page 117: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS + HPMBS Case Study: 7th Street Parking Improvements, Haines City, FL

• 5000 SF Lot• SHGWT = - 3 FT• Provide 1” Treatment• Infiltration Rate = 6”/Hr• Integrated Infrastructure Solution

1. 5000 SF P-ACB2. 20 SF HPMBS (Low Profile)3. 58 CF MPSS-SD

Page 118: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS + HPMBS Case Study: 7th Street Parking Improvements, Haines City, FL

• Design Concept Presented• Summer 2016 Construction

Page 119: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS + HPMBS Case Study: 7th Street Parking Improvements, Haines City, FL

1. Cover entire lot with P-ACB

Page 120: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS + HPMBS Case Study: 7th Street Parking Improvements, Haines City, FL

2. 2’ X 10’ Low Profile HPMBS• Accommodate shallow

water table• Small footprint• Minimal capital cost• Minimal maintenance

costs

Page 121: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

P-ACB + MPSS + HPMBS Case Study: 7th Street Parking Improvements, Haines City, FL

3. 58 CF MPSS• Overflow from low

profile HPMBS

Page 122: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control

Integrated Infrastructure: Summary• P-ACB Pavements

• High flow – 2000 in/hr guaranteed• 1” Storage in P-ACB• Maintainable• ADA-Compliant

• MPSS• High Void Ratio – 90%–95%• Modular flexibility• Carry traffic loads

• HPMBS• Green Infrastructure• High flow – 100 in/hr guaranteed• FDEP-Approved removal efficiencies

• Integrated Infrastructure BMPs researched at UCF

Page 123: Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovative solution for water quality and flood control