6
Caprock 10 Proposed Multi Family Development

Caprock 10 Multi-Family Development

Embed Size (px)

Citation preview

Page 1: Caprock 10 Multi-Family Development

Caprock 10Proposed Multi Family Development

Page 2: Caprock 10 Multi-Family Development

Site Location

Page 3: Caprock 10 Multi-Family Development

Site Plan

Page 4: Caprock 10 Multi-Family Development

Building Elevations

Page 5: Caprock 10 Multi-Family Development

Traffic Impact AnalysisExisting Traffic Patterns of future development ‘generated’

10% Annual Growth 2016-2024

Trips: General Commercial - 524.50 Trips (50 Trips/AC)Multi-Family - 195.11 Trips (18.6 Trips/AC)Caprock 10 – 150.04 Trips (242 Units, 0.62 Trips / unit)

Project opens Summer 2019 – Two future egress points, Greens Prairie / Arrington Intersection Signal

Page 6: Caprock 10 Multi-Family Development

Future Egress