1. Welcomeandintroductions- Ghana&London2. Updateonresilience.ioprogrammeandforwardplans
forJune- StephenPassmore3. AimsandnextstepsfortheGAMATechnicalGroup–
CatherineAllinson,FutureEarthLtd4. Earlyuse-casefindingsandprototypedevelopment–
RembrandtKoppelaar ICL&IIER5. Financingresilientinfrastructure(WASH)– Christoph
vonWaldersee6. Guestspeakers7. AOB8. NextstepsandClose
http://ecosequestrust.org/GAMA
Agenda
resilience.ioprogrammeà July● DFID Annual Review process – the funders. Beginning to
discuss next steps which could include a graphical userinterface, another sector, more WASH use cases
● Engagementwithministries, assemblies, TV and Radio
• June 13th – 22nd Debut events - Objectives• Evidence prototype is functional and benefits• Municipal interest in using WASH findings to inform
decision making• Interest to continue to develop resilience.io - WASH,
other sectors• Positive news stories on resilient city innovation
resilience.ioprogrammeà July● June 2016
• 13th – 22nd June interactive modelworkshops• Ministries – MLGRD &MWRWH, NDPC &MESTI• Academia – ILGS, UoG, KNUST• MMDAs, Cities, Community• Private sector
• Agendas – for discussion• Welcome and introductions – host• Introduction to resilience.io prototype• Host presentation on value of resilience.io• Introduction to the 3 Use Cases
• Findings and discussions• Interactive model run sessions (alter scenarios,
parameters, assumptions)• Summarise findings• Discuss next steps and identify expert user(s)
Aims and next steps
1. Collaboratory grows to cover all sectors with user friendly access points and nominated lead for each. It takes responsibility for M&E, reporting and dissemination of results from the resilience.io model.
2. Links to and between academic institutions are strengthened to build and share collaborative intelligence.
3. Professional networks are engaged especially with regard to project financing, apps and sustainable technologies which can be brought to GAMA
4. Use of data and information for vertical and horizontal engagement with communities and decision-makers and for creating business cases is achieved
Collaboratory is seen as forum for collaborative intelligence for planning and investment decisions
SUPPORT THE DEBUT WITH YOUR VOICE AND FEET15TH – 24TH JUNE 2016
Resilience.IO Results for meeting Water Demand in Ghana
Harry Triantafyllidis, Xiaonan Wang, Rembrandt Koppelaar and Koen H. van Dam
Department of Chemical Engineering, Imperial College London, UKIIER – Institute for Integrated Economic Research
12 May 2016
Resilience.IO platform
Results – Use Case 1 “On-going projects”
10
Simulated Values 2010 2025Population 3,882,567 5,678,121Water Demand (no leaks) 346,938 m3/day 518,000 m3/dayWater Losses (leaks)* 153,438 m3/day 260,983 m3/day
*Assumed 27% leakage in pipe transport in 2010 & 2025
2025 : New infrastructure to meet 100% improved water demands
12
n On-going / completed projects 2010 - 2025:¨ Kpong China Gezhouba (186,000 m3/day)¨ Kpong Tahal (28,000 m3/day)¨ Teshie Desalination plant (60,000 m3/day)¨ GAMA additional boreholes (21,000 m3/day)
n Model outcome à suggested:¨ Expansion source water treatment Lake Weija (175,000 m3/day)
n Potential alternative – already planned:¨ Asutuare project at Volta River (200,000 m3/day)
Results – Use Case 1 “On-going projects”
15
Simulated Values 2010 2025Investment cost (USD)* / 954 millionOperational cost (USD) 42.6 million 81.3 millionOf which simulated:
- Electricity cost (USD) 1.86 million 8.7 million- Labour cost (USD) 12.8 million 17.0 million
*on top of current investments in on-going projects
To be continued…..
16
• Use Case Report in the works – detailed results• June Demonstration Workshops in Accra• Prototype executable
UrbanResilienceAndTheNeedOfFinance
FinancingResilientInfrastructureAndRiskManagement
WebinarforGhana,May12th,2016
By:Christoph Waldersee,TheEcologicalSequestrationTrust
Pleasefollowmeonmyjourneytoabetterwayofstrengtheningclimateresiliencewithafocusonhowtofinanceit:
1. Tacklechangingdisasterrisks&uncertainties2. Enhanceadaptivecapacity3. Addresspoverty&vulnerabilityandtheirstructuralcauses
1.0.
1.1 Infrastructure as the growth engine of the near future?
Bloomberg,27February2016:“G-20SeeksInfrastructurePushtoHelpBoostGlobalEconomy”http://www.bloomberg.com/news/articles/2016-02-27/g-20-seeks-infrastructure-push-to-help-shore -up-global-economy
o “GlobalfinancechiefsaresteppinguptheircallfordevelopmentlenderssuchastheWorldBanktohelpsupporteconomicgrowthbyfurtheropeningtheinfrastructuretaps”
o “G-20financeministersandcentralbankersalsosaidinthedraftobtainedbyBloombergNewsthatthey’recommittedtoadvancinginvestmentbyfocusing"oninfrastructurebothintermsofquantityandqualityaspects“.”
1.2 Infrastructure is a “Public Good”
Safewater,cleanair,goodhealth,basiceducation,greenspaceetc.cannotbereplaced.Makingitstable,disasterproof&resilient,whilestill running&financingitfollowsthe
patternofanyotherhumanactivity:Incentiveswillreachmore!
Urbaninfrastructuremustberesilient &sustainableaspublicserviceisapublicgood.Buthowtofinanceit?
Thepolitical levelissettingtherules Theservice level
supplies, runs,maintainsit,andhastofinance it.Supply canbeeitherapublic,aprivate&oracommunity task
Citizensaredependingonthesupplyofsuchservicesandtheyarereadytopaybutonly inatransparentsystemallowingthemtoseeiftheycanafforditWearetalkingaboutastandard ofSustainablePublic&SocialWell-Being
Citizensneedto&wanttobesuppliedaccordingtoagreedstandards
ThefinancesectorneedtobeinvolvedwhensettingRESILIENT standardstofinancethisIncentivizing thefinancesectorthroughbankableprojectstotakethisup isessentialItneedstobecomepartofasystemthatisputting RESILIENT as its benchmark
Whoeverrunstheutilityhasprincipally agreedtothispublic&socialwell-beingstandardthecosts&potentialgainsbalancingoverall social wellbeing &economic profit (corporateornot)regardingtheinclusiveness, theresilient quality &affordable price ofthepublicservice
Thisisthepractical&legalbaseforanycostbenefitanalysis aswellasanintegralduediligenceallowinganyonetocalculatetherelatedfinancialcostInotherwords:Thisisthewaytomobilisefinance& investmentturning itinto bankableprojectsThose canbeofferedtothefinancialmarkets
Whicheverownership,publicorprivatesector,whicheversourceoffinance,theutilitysupplieristobejudgedby:KPIs madeevidentthrough dataread&interpretedbyalocal“Collaboratory” e.g.DataCloud
2.1 Infrastructure & Risk Management (2)
Infrastructureisunique andhastofollowitsspecificsetofrules.Todotherespectiveriskmanagementitneedstoincludeotherfactorsthanwhatacorporateriskanalysisassesses:
Ø Infrastructure fundamentallydealswithsocialwellbeingandinclusiveness
Ø Atthesametimeitstillbindslikeanyotherinvestmentamounts ofmonetarymeansturnedintofixed or hard-to-moveassets
2.2 Infrastructure & Risk Management (3)
Identifying,analyzingandeitheracceptingormitigatinguncertaintyintheinvestmentdecision-makingprocessalways directly dealswiththeriskofsocialwellbeing,ofinclusiveness anditsconsequencesforhumanbeings
Ø Allthisneedstobecountedinwhenquantifyingpotentiallossandweighingitwiththeintendedinvestmentobjectivesanditsoverallcost,thenassessingtheresultinginherentrisktolerance
Ø Inadequateriskmanagementwillcauseconsequencesforhumanbeings,forsocietyingeneral,fornatureorevenfortheplanetaryhealth
Givethecitizenawordinit,notonlyasavoter
3.2 Financing “Resilient” Infrastructure (3)
Moody’sstated&estimates:o “GreenBonds”worthUS$50billionareexpectedtobe
issuedin2016o In2015 greenbondsworthUS$42.4billionwereissuedo India &China were expectedtoleadgreenbondsissuanceso 105issuersraisedUS$42.4billionin197transactionsin
2015,average fundspertransactionaroundUS$215million,largestissuerraisingUS$17billion
4.0 Action Plan (1)
Whatweneedtodonow:
o Startanintegrated planningprocessbetweencity &potentialinvestor
o WorkingontheDevelopmentFinanceInstitutionstointegratetheagreedKPIsintotheirprojectfinanceandmakethemcompulsorywiththeaddressees (municipalities,regions,nations)
o Turntheagreed KPIs into“Green” and“Resilient”standardsfortheduediligenceforany privatesectorfinance,inparticularinfrastructure
o Workingoninstitutionalinvestorsand privateequityproviderswhoareconstantlyseekingnewinvestments astheyallovertheworldstartdisinvestingfromfossilfuelsandotherunsustainableventures
Municipalityand/orUrbanDevelopment
Agency
Policies
Thosearethesocietalneedsforhard&softinfrastructureineachdistrict,
municipality, citye.g. Goal:Integratedstrategicassessment,planning
&evidence
Privateinvestmente.g.loans, equity, etc.
Thosearetheinvestmentneeds
UrbanDevelopment
andInvestmentFund (UDIF)
Backed bye.g.GCF,AfDB,and/orbyinstitutionalinvestors&
otherinvestors
Projectpipeline (couldbeaPPP, orapublic,oraprivateproject,plus anyinnovative
finance)
Public investmente.g.fiscal,land,
bondsInvestmentincashandkind
Greenspaces
Culture
Infrastructure
• Oneprimeloantypetokeepcostslow• Coversfull andincrementalcostsofprojects• Longorshorttermfinancepossible• Assessments, data,modelling andM&Eare
bundledwithfunds
Results:Governance&technicalcapacitywillbemuchincreased!
Eligibility:• “Transformationalchange”
(e.g.accordingtoGCFrequirements)
• Carboncyclemanagement&overallGHGreduction
• Overallutility reductionunderanyaspectofresourceefficiency
• Innovation, adaptation&mitigationaccordingtoresilience.io standards
Thetool:UrbanDevelopment&Investment
Fund(UDIF)
4.2 Action Plan, Toolkit “Urban Development & Investment Fund”
1. Fund structure[amountspaid-in&management]canbepublic,privateormixed[noneedtoprescribeastructure]
2. Fundrevolves foranunlimitedtimeperiod3. [2-3%]Administrationfee,fromwhichmanagementcost,royalties/fees,etc.arepaid4. Oneprimaryloantype[advisable,butnotnecessarilyso],eitheratpreferentialinterestrateor
marketconditions5. Loancoversfullorincrementalcost[“LifeCycleCostingCalculator”acc.to“Harvardmodel”]6. Softcost/feasibility,enhanceddatamapping,modeling&meteringresultsbundledwithloan7. Primarycategoriesdeterminingeligibilityforaloan:
i. TransformationalchangeinregardtoGCFrequirementsii. Carboncyclemanagement/GHGreductioniii. Overallutility reductionunderaspectsofresourceefficiencyiv. Innovation, adaptation&mitigationaccordingtoTEST/resilience.io standards
8. Loans&structuredfinance[possibly includingequity]upto[xx]US$Millionwillbeconsidered9. Projectsrequirefullfeasibilitystudy,preferablyincludingacasestudyandawebstory10. FundReviewCommitteemeetsregularly[quarterlyorsimilar]11. Fundpolicy&governancereviewedregularly[everyXth year]