16
C270 (HK BIODIESEL PLANT) Safety Report C270 Monthly Safety Report – June 2013

Monthly Safety Report 2013 06_Jun

Embed Size (px)

Citation preview

Page 1: Monthly Safety Report 2013 06_Jun

C270 (HK BIODIESEL PLANT) Safety Report

C270 Monthly Safety Report – June 2013

Page 2: Monthly Safety Report 2013 06_Jun

Safety :Contribution from All Level ( Top to Shop )

SAFETY STATISTICS

May 2013 Jun 2013

Accumulated Man-hour 672,864 724,254

Days worked from Commencement

569 599

Accumulated Man-day Lost 1297 1357

Cumulative Accident Frequency Rate

0.74 0.69

C270 Monthly Safety Report – June 2013

Page 3: Monthly Safety Report 2013 06_Jun

SAFETY INSPECTION / MEETINGPhysical site safety walks

C270 Monthly Safety Report – June 2013

Page 4: Monthly Safety Report 2013 06_Jun

SAFETY INSPECTION / MEETING

Weekly Safety Meetings with Safety Representatives of Subcontractors

C270 Monthly Safety Report – June 2013

Page 5: Monthly Safety Report 2013 06_Jun

AREA NEED IMPROVEMENT

ACCESS and EGRESS– Unsafe temporary access

PROMPT RECTIFICATION

Improvement – Safe temporary access with

hand railing

C270 Monthly Safety Report – June 2013

Page 6: Monthly Safety Report 2013 06_Jun

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Floor edge fenced by rigid

barriers and conspicuous netting

FALL FROM HEIGHT– Floor edge should be fenced

by barriers

C270 Monthly Safety Report – June 2013

Page 7: Monthly Safety Report 2013 06_Jun

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Works area kept tidy and

clean

TIDNESS and CLEANLINESS– Works area should be kept

tidy and clean

C270 Monthly Safety Report – June 2013

Page 8: Monthly Safety Report 2013 06_Jun

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

C270 Monthly Safety Report – June 2013

TIDNESS and CLEANLINESS– Works area should be kept

tidy and clean

Improvement – Works area kept tidy and

clean

Page 9: Monthly Safety Report 2013 06_Jun

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

Improvement – Haul road maintained free of

obstruction

ACCESS and EGRESS– Obstruction on haul road

should be removed

C270 Monthly Safety Report – June 2013

Page 10: Monthly Safety Report 2013 06_Jun

POSITIVE SAFETY ATTITUDE

PRE-WORK MEETING

Installation of Chimney Support Frame – Site Specific Safety Meeting prior to lifting operation

C270 Monthly Safety Report – June 2013

Page 11: Monthly Safety Report 2013 06_Jun

POSITIVE SAFETY ATTITUDE

WELFARE PROMOTION – Drinking Water

C270 Monthly Safety Report – June 2013

Page 12: Monthly Safety Report 2013 06_Jun

POSITIVE SAFETY ATTITUDE

Inspection by Building Department

QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department

C270 Monthly Safety Report – June 2013

Page 13: Monthly Safety Report 2013 06_Jun

SAFETY TRAINING

Site Specific Safety Induction

Current MonthAccumulate (Oct 2011 –

May 2013)

No. of class 23 429

No. of Attendee 63 1835

INDUCTIONTRAINING

C270 Monthly Safety Report – June 2013

Page 14: Monthly Safety Report 2013 06_Jun

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Safety Lifting safety 10Env Waste management 62

Safety Safe use of ladder 62Safety Fire prevention 62Health Prevention of heatstroke 62

Current Month Total 258 nos.

Accumulated Total :6,380 nos.

C270 Monthly Safety Report – June 2013

Page 15: Monthly Safety Report 2013 06_Jun

SAFETY Promotion

8 nos. Very Hot Weather Warning

6 nos. Thunderstorm Warning

1 no. Tropical Cyclone Warning

3 nos. Safety News Sharing

13 nos. Safety & Health Warning

8 nos. Safety & Health Interface – BDI

3 nos. Updated Safety & Health Advice

1 no. EC claim communication

3 nos. Communication with CHEC Safety

Safety Circulation

C270 Monthly Safety Report – June 2013

Page 16: Monthly Safety Report 2013 06_Jun