Page 2: My project work

2.1 need of project - - - - - - - - - - - - - - - - - - - - - - - 42.2 project scope and disadvantages - - - - - - - - - - 62.3 Profile of organization chart - - - - - - - - - - - - - 82.4 exiting system - - - - - - - - - - - - - - - - - - - - - - - - 102.5 advantages and disadvantages of exiting - - - - 12

System2.6 organization chart - - - - - - - - - - - - - - - - - - - - - 132.7 Function decomposition chart - - - - - - - - - - - - 142.8 Proposed system - - - - - - - - - - - - - - - - - - - - - - 152.9 Feasibility study - - - - - - - - - - - - - - - - - - - - - - - 17

3. Building a project plane for scratch3.1 introduction(definition)3.2 Planning activity.3.3 Designing calendar

4. System requirement specification - - - - - - - - - - - - - - - - - - 18 5. Data flow diagram of system - - - - - - - - - - - - - - - - - - - - - - 21

5.1 context level - - - - - - - - - - - - - - - - - - - - - - - - - - 215.2 1st level - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 235.3 2nd level - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24

6. Entity relationship diagram - - - - - - - - - - - - - - - - - - - - - - - 267. Data dictionary - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 278. Cost estimation, schedule and assigning resources

(Phase-2)

Group introduction :-2

Page 3: My project work

Group no :- 16No

Roll no

Name

1 123 Parmar Bhavesh

2 105 Dodha Ketan3 168 Pathan

Shahnavaj4 162 Prajapati

Yogesh

3

Page 4: My project work

Need of system :-

In hospital management patient management and its data is more important. In this data arrange and store in proper way for long time. Its some needs are as under.

This program is developed to make easy the routine work.

Easy to find data or information.

Save lot of manpower and time.

System covers large number of people and try minimize data redundancy.

In this system process of summary report is main part, using the computerized system.

4

Page 5: My project work

This process is become simple and small; you can immediately getting the report for the query.

This system provides interaction user friendliness and also less paper work.

Project scope and limitation :-

Project scope :-

Patient management of general O.P.D. in the general hospital, Gandhinagar.

In this you also stored patient’s report and you study on the specific disease.

We manage pharmacy department, general O.P.D. , and patient management system. Combine we will that three department through the server connection that use for without paperwork we done every process easily.

Project limitation :-

Data store 25 years only.

In this system patient id is more impotent and without it can’t manage this system.

5

Page 6: My project work

Note : patient data store for 25 years only.

Profile :-

Name : General hospital management,Gandhinagar.

Address : sector – 12,

Opp. Pathikashram,

Pin-382016

Phone number : 079-232221931-32

2321913

Fax : 079-23222733

Email id : [email protected]

Slogan : we accept high risk obstetric patient at this hospital.

6

Page 7: My project work

Mission : -

We shall enhance the patient quality life through providing specialized medical treatment at free and affordable rates to the poor and the needy and preventive healthcare.

Vision : -

To be the part of network of finest public healthcare institution in the state of Gujarat, providing quality medical care services with the state of art technology with easy accessibility, affordability and equity to the people of Gujarat and beyond.

7

Page 8: My project work

Exiting system :-

The existing system is computerized system. It is not fully computerized system.

Most allies are done manually in Hospital Management system.

All reports are done manually.

Information about patient is recorded computerized but in that many problems.

Data redundancy is more and data and information are not arranges in proper structure and way.

All information is difficult to remember to doctor about patients.

Manually reports or other document are not save long time.

Work load is more.

Report and data searching problems.

8

Page 9: My project work

In use more manpower and time.

Advantages of exiting system :-

Error will be less.

It is comfortable with patient.

Disadvantages of exiting system :-

Work load is more.

Waste time, money, manpower.

Many problems in find proper data or information.

In many chances lost information and reports.

9

Page 10: My project work

Organization chart :-

10

Page 11: My project work

Function decomposition chart :-

11

Page 12: My project work

Proposed system :-

In this hospital computerized system running. Therefore we give them proposal to convert it into fully computerized system that use for searching data. In this we manage three department Registration systems, General

12

Page 13: My project work

O.P.D. , and Pharmacy department we combine that three department through the server. Without paper work we have done every process. So it is very speedily and easy to reporting.

In this proposed system we connecting receptionist and doctor with help of server.

Patients first go for case registration and registration his info and take one token.

Then patient take doctor treatment and prescription.

Patient will take all prescription.

That after patient takes some medicine and all reports.

Feasibility study :-

There are four types of feasibility .operational feasibility, technical feasibility, economical feasibility, schedule feasibility. New system feasibility given below:

13

Page 14: My project work

1. operational feasibility:-

The new system aim is save manpower with minimize data redundancy and data arrange in proper way. Proposed system is useful to searching data so, it is user friendly. System will not require any training. If you need any help related system then we will provided guidance and help only. The system will be comfortable for both user and patients.

2. technical feasibility :-

Patient data and information is important in any hospital. Hospital is easy to purchase entire system requirements. The system will be operationally comfortable for the company.

3. economical feasibility :-

The company is capable to requirement of proposed system. It‘s advantages is more and helpful in improve profit. The system will be economical feasible for the company.

4. schedule feasibility :-

Time is the most effective factor while making a project or system. The project should be finished within the assigned time.

14

Page 15: My project work

System requirement Specification :-

Hardware :-

15

Page 16: My project work

Developers requirement :-

RAM 1 GB, Processor Intel i3 core, Hard disk 160 GB,

User requirement :-

Processor Intel i7 core, Hard disk 320 GB, RAM 3 GB,

Software :-

Operating system : windows XP professional version 2002, Service pack 2

Ms Visualstudio.NET

Data base : Microsoft ACCESS XP

Data flow chart :-

16

Page 17: My project work

Data flow Diagram :-

17

Page 18: My project work

Context level DFD

18

Page 19: My project work

19

Page 20: My project work

1ST LEVEL DFD

20

Page 21: My project work

2ND LEVEL DFD

3RD LEVEL DFD

21

Page 22: My project work

22

Page 23: My project work

23

Page 24: My project work

Data dictionary :-

A data dictionary is a central storehouse of information of about the system’s data. An analyst uses data dictionary to collect, document and organize specific fact about system, including the contents of data flow, data stores, entities and process.

1) Patient case :-

Filed name Type Size Constraint DescriptionP_id Number 10 Primary key Patient keyCase_no Number 10 Not null Case noDate Date and

time- Not null Date

P_name Text Not null Patient nameP_add Text 50 Not null Patient addressP_age Number 2 Not null Patient ageGender Yes\no - Not null Patient sexCity Text 20 Not null Patient cityPhone Number 10 Allow null Patient phone noMobile Number 10 Allow null Patient mobile no

2) Patient history :-

Filed name Type Size Constraint DescriptionP_id number 10 Foreign key Patient keyDiseases Text 100 Not null Patient diseasesReport Text 256 Not null ReportsPrescription Text 256 Not null Prescription

24

Page 25: My project work

3) Doctor details :-

Filed name Type size Constraint DescriptionD_ id number 10 Primary key Doctor id noD_name Text 20 Not null Doctor nameVisit_date Date &

time - Not null Doctor visit date

Degree Text 15 Not null DegreeD_address Text 56 Not null AddressD_phone number 10 Not null Doctor contact no

4) Pharmacy :-

Filed name Type size Constraint DescriptionM_name Text 20 Not null Medicine nameM_code number 15 Pk Medicine codeE_date date Not null Expire dateM_stock Number 20 Not null StockM_price Number 10 Not null Price

5) Bill :-

Filed name Type size Constraint DescriptionB_no Number 10 Pk Bill noTotal Number 10 Not null Cost(bill)P_name Text 20 Not null Patient nameP_id Number 10 Fk Patient id no

25

Page 26: My project work

6) Diagnosis :-

Filed name Type size Constraint DescriptionD_name Text 20 Not null Disease nameD_study Text 256 About that

informationD_work Text 256 Use for doctor

26

Page 27: My project work

Activity table :-

Activity

Description Precedence

Duration

Resources Optimistic

Most likely

Pessimistic

Remarks

A Select project -B Identify project

scope- 1 week Project

manager1 week 1 week 1week

C System planning B 1 week Analyst, pro. Leader

1 week 1 week 1 week

D System analysis C 3 week Analyst, magazine

3 week 3 week 4 week

E information gathering

4 Analyst

F User requirements E 2 AnalystG Problem

identificationF 3 Analyst

H Proposed system C, G 4 Analyst, project manager

I Feasibility study H 5 AnalystJ Data process

modelingD 2 week Data base

designer1 week 1 week 1week

K Data flow AnalysisL Relationship

diagram K Data base

designerM Data dictionary L Analysis,

Data base designer

N Requirements specification

2 week Analyst, h/w, s/w

2 week 2 week 2 week

O select hardware & software

N Printer, modem,Computer,Server card

P Recruitment staff 3 week HR, 2 week 2 week 3 weekQ System design 4 week Designer,

programmer4 week 4 week 5 week

27

Page 28: My project work

R Module design Design, programmer

S Program design R DesignerT Coding Q 5 week Programmer 3 week 3 week 4 weekU Module coding ProgrammerV Sub module

codingU Programmer

W Testing T 1 week Programmer, 1 week 1 week 1 weekX Implementation W 1 week Computer,

modem, preprogram, project manager

1 week 1 week 1 week

Y User training X, P 1 week Project manager, programmer

1 week 1 week 1 week

28

Page 29: My project work

29

Page 30: My project work

30

Page 31: My project work

31