48
ECO Snow Sport Dome 11/25/2015 1 www.snowpalaceinternational.nl

Spi presentation 2015 issc

Embed Size (px)

Citation preview

ECO Snow Sport Dome

11/25/2015 1 www.snowpalaceinternational.nl

Solar

Geothermic

LED Lightning

Steel

Wind

Build-materials

Water

Recycling

Concrete

On board

Footprint Snow Cruiser

• Length start with 400m (1312ft) > 1.200m (3937ft)

• Wide start with 70m (229ft) > 120m (229ft)

• Height start with 75m (246t) > 160m (524ft)

• Land-plot minimum 10 hectare ( 21 acre ) incl. emergency/service area surrounding the indoor 50m (164ft)

• Build period 14 > 24 months

• Slope angle is 12 - 14 degrees Blue slope

• Slope angle 14 – 18 degrees Red

• Slope Black possible depending the planned facilities under the dome

• Slope hall temp. 0 C / +2 C

www.snowpalaceinternational.nl 7 11/25/2015

www.snowpalaceinternational.nl 8

Indoor technical details • No Chemicals used in snowmaking • Patented Thermal Storage to reduce Capital and Running Costs • Environmentally Friendly • Low Carbon Footprint • Patented In Flight Snow gun System • Proven over 25 years and Fully Automatic • Selection of different snow flake types • Fresh Snow can be made daily for less than $ 1.00 per Cubic Meter • Snow Density adjustable for Different Slopes • Thermal Storage spreads cooling over 24 hours • Fresh Snowflake Falling System available for Snow Play Area • Snow Melting System Recovers Energy for HVAC Re-Use in other areas • Water Purification plant 80.000 liter per day ( pet bottle line ) • Thin Film Solar laminate ( Solar depending size indoor and country ( aprox 9 Mgwat ) -LED lightning systems -Bio-fuel diesels as back up electric power systems -Geothermal power pack • Cradle to Cradle • Sustainable construction systems

11/25/2015

Solar cell energy plant target 9 Megawatt

11/25/2015 9 www.snowpalaceinternational.nl

Indoor Energy consume aproxximently 6 Megawatt delivery to grid 3 Megawatt

Geothermic system in the basement

11/25/2015 10 www.snowpalaceinternational.nl

Warm water will be used for snow & ice making, and interior heating .

11/25/2015 11 www.snowpalaceinternational.nl

Integrated Wind venture turbine energy

11/25/2015 12 www.snowpalaceinternational.nl

Water purification unit in the basement

Water PET bottle filling station

Recycling & Solid waste energy in the basement

11/25/2015 13 www.snowpalaceinternational.nl

11/25/2015 14 www.snowpalaceinternational.nl

(a) (b)

Color’s LED show technology

11/25/2015 15 www.snowpalaceinternational.nl

Modular steel construction

11/25/2015 16 www.snowpalaceinternational.nl

Basic sizes

50.000 sqm

22-25.000 sqm

40.000 sqm

35.000 sqm

Not basic

Not basic

11/25/2015 17 www.snowpalaceinternational.nl

11/25/2015 18 www.snowpalaceinternational.nl

Slope Geometry 380 meter – 1.400 meter long

11/25/2015 19 www.snowpalaceinternational.nl

11/25/2015 20 www.snowpalaceinternational.nl

Floors

11/25/2015 21 www.snowpalaceinternational.nl

The concept

11/25/2015 22 www.snowpalaceinternational.nl

11/25/2015 www.snowpalaceinternational.nl 23

Snow complex

11/25/2015 www.snowpalaceinternational.nl 24

Top sport accommodations and facilities

11/25/2015 www.snowpalaceinternational.nl 25

11/25/2015 www.snowpalaceinternational.nl 26

Ski Academy

11/25/2015 www.snowpalaceinternational.nl 27

Option: Langlauf Biathlon track in the basement 2 km

11/25/2015 www.snowpalaceinternational.nl 28

Outdoor track

Indoor track

11/25/2015 29 www.snowpalaceinternational.nl

Interior snow area 500 meter top level

11/25/2015 www.snowpalaceinternational.nl 30

Interior snow 250 meter level

11/25/2015 www.snowpalaceinternational.nl 31

Interior snow area ground level

11/25/2015 32 www.snowpalaceinternational.nl

Interior snow area ground level eleveators

11/25/2015 www.snowpalaceinternational.nl 33

Falling snow Interior snow area kids zone

11/25/2015 www.snowpalaceinternational.nl 34

Short track / Ice hockey rink

Ground level cold area

11/25/2015 www.snowpalaceinternational.nl 35

Kids snow & ice playgrounds

11/25/2015 36 www.snowpalaceinternational.nl

Interior snow area kids zone

11/25/2015 37 www.snowpalaceinternational.nl

Interior snow area kids zone

11/25/2015 38 www.snowpalaceinternational.nl

Interior snow area kids zone facade

39 www.snowpalaceinternational.nl

Electric Ice Go Kart cold area

11/25/2015

Entertainment

11/25/2015 40 www.snowpalaceinternational.nl

11/25/2015 41 www.snowpalaceinternational.nl

www.snowpalaceinternational.nl 42 11/25/2015

The Brewery

43 www.snowpalaceinternational.nl

.

11/25/2015

44 www.snowpalaceinternational.nl 11/25/2015

11/25/2015 45 www.snowpalaceinternational.nl

Hotel ( option )

11/25/2015 www.snowpalaceinternational.nl 46

Apartments ( option )

Hybrid bus lines between city’s, train stations, airports

Car parking

48 www.snowpalaceinternational.nl 11/25/2015

ECO Fuel filling ports