del2infinity Energy Consulting Pvt. Ltd. (An accurate solution for Wind Power & Solar Power Forecasting & Scheduling) [email protected] / [email protected] www.del2infinity.xyz Delhi || Kolkata || Bangalore Karnataka Electricity Regulatory Commission has notified the “Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation Sources) Regulation 2015 (KERC/CT/1/15 dated 31 May 2016. Karnataka is the first state to release the Forecasting & Scheduling regulation in the country. Executive Summary of “Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation Sources) Regulation 2015 Applicability of Regulations (Section 3.2) All wind generators having combined installed capacity of 10 MW and above at the pooling station (Section 3.2 (a)). All wind generators having combined installed capacity of 5 MW and above at the pooling station (Section 3.2 (b)). Existing wind and solar generators needs to comply with the regulation within six months from the date of publication of the regulations in the official gazette (Section 4.1). All the new wind and solar generators which shall be commissioned after six months from the effective date of the regulation shall comply these norms before commissioning of the project and connecting with the state grid (Section 4.2). Virtual Pool (Section 4.8) The wind & solar generators either by themselves or through the Aggregator/QCA may opt for aggregation of Forecasting and Scheduling of different pooling stations to enable larger geographical integration and furnish scheduling of Integrated pools at 15 minutes time block to SLDC and in such case any pooling and depooling of the DSM charges shall be done only at their level. Computation of Error (Section 2(j) & 7.1) Computation of error quantity The following formula shall be adopted for this purpose: % Error (deviation) = ((Actual Generation – Scheduled Generation)X 100) / ((Available Capacity (AvC)) F&S at Inter- State level (Section 7.4) The energy charges shall be paid to the generators i. As per the actual energy supplied irrespective of the Schedule quantum of energy for the generators for intra-State Transactions ii. As per the Schedule energy for the inter-State transmission which are governed by the CERC regulations. Frequency of Revision (Sec 4.9) Deviations will be calculated on the basis of Available Capacity (AvC). 16 revisions allowed during the intraday with each revision effective from 4th time block.

Executive Summary of “Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation Sources) Regulation 2015

Embed Size (px)

Citation preview

Page 1: Executive Summary of “Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation Sources) Regulation 2015

del2infinity Energy Consulting Pvt. Ltd. (An accurate solution for Wind Power &

Solar Power Forecasting & Scheduling) [email protected] / [email protected]

www.del2infinity.xyz

Delhi || Kolkata || Bangalore

Karnataka Electricity Regulatory Commission has notified the “Forecasting, Scheduling, Deviation

settlement and related matters for Wind and Solar Generation Sources) Regulation 2015

(KERC/CT/1/15 dated 31 May 2016.

Karnataka is the first state to release the Forecasting & Scheduling regulation in the country.

Executive Summary of “Forecasting, Scheduling, Deviation settlement and related matters for Wind

and Solar Generation Sources) Regulation 2015

Applicability of Regulations (Section 3.2)

All wind generators having combined installed capacity of 10 MW and above at the pooling

station (Section 3.2 (a)).

All wind generators having combined installed capacity of 5 MW and above at the pooling station

(Section 3.2 (b)).

Existing wind and solar generators needs to comply with the regulation within six months from

the date of publication of the regulations in the official gazette (Section 4.1).

All the new wind and solar generators which shall be commissioned after six months from the

effective date of the regulation shall comply these norms before commissioning of the project

and connecting with the state grid (Section 4.2).

Virtual Pool (Section 4.8)

The wind & solar generators either by themselves or through the Aggregator/QCA may opt for

aggregation of Forecasting and Scheduling of different pooling stations to enable larger

geographical integration and furnish scheduling of Integrated pools at 15 minutes time block to

SLDC and in such case any pooling and depooling of the DSM charges shall be done only at

their level.

Computation of Error (Section 2(j) & 7.1)

Computation of error quantity

The following formula shall be adopted for this purpose:

% Error (deviation) = ((Actual Generation – Scheduled Generation)X 100) / ((Available

Capacity (AvC))

F&S at Inter- State level (Section 7.4)

The energy charges shall be paid to the generators

i. As per the actual energy supplied irrespective of the Schedule quantum of energy for the

generators for intra-State Transactions

ii. As per the Schedule energy for the inter-State transmission which are governed by the

CERC regulations.

Frequency of Revision (Sec 4.9)

Deviations will be calculated on the basis of Available Capacity (AvC). 16 revisions allowed during the

intraday with each revision effective from 4th time block.

Page 2: Executive Summary of “Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation Sources) Regulation 2015

del2infinity Energy Consulting Pvt. Ltd. (An accurate solution for Wind Power &

Solar Power Forecasting & Scheduling) [email protected] / [email protected]

www.del2infinity.xyz

Delhi || Kolkata || Bangalore

Tolerance limits and deviation bands (Sec 7.3)

The permissible deviation for all the wind and solar generators shall be (+/-) 15% beyond which penalty

is applicable.

Sl

No

Particulars Deviation range Payment to DSM account by

generators

1 For Wind and Solar

generators having

PPAs with ESCOMs

and / or supplying

power to consumers

availing open access

facilities for wheeling

the power within

State

>±15% ≤±25% Rs 0.50 per kWh for the quantum of

short fall or excess energy beyond

±15% and upto ±25% of deviation from

the schedule (i.e. ±10% above tolerable

limits of ±15%

>±25% ≤±25% Rs. 0.50 Ps per kWh up to ±25%

deviation + Rs 1.0. per kWh for the

remaining quantum of short fall or

excess of energy for deviation from

schedule beyond ±25% up to ±35%.

More than

>±35%

Rs. 0.50 Ps per kWh up to ±25%

deviation + Rs 1.0. per kWh for the

remaining quantum of short fall or

excess of energy from deviation to

schedule beyond ±25% up to ±35% +

Rs 1.50 per KWh for the quantum of

short fall or excess of energy beyond

±35% deviation from schedule .

------------------------------------------------------------------------------------------------------------- Del2infinity Energy Consulting (P) Ltd. provides solution for Accurate Wind Energy & Solar Forecasting and Scheduling, Load Forecasting & Qualifying Coordinating Agency (QCA). del2infinity works with some marquee names across industries.

del2infinity Wind Energy Forecasting and Scheduling Solution has achieved efficiency with unprecedented accuracy of 87%

time-blocks is under +/-10% error margin depending on the accuracy of real time data.

del2infinity Solar Energy Forecasting & scheduling solution has achieved efficiency with unprecedented accuracy of 98%+

time-blocks is under +/- 5% error margin depending on the accuracy of real time data. Del2infinity is the only accurate Solar Energy Forecasting Solution provider at the moment. Feel Free to mail us for any query or updates.

We are offering a limited Free Trials, please let us know if you are interested for the same.