Smith, V.S. 2014. FP7 Funded RI Project experiences: some overly honest tips from a project coordinator, EC Horizon 2020 Research Infrastructures Information Day in at the Natural History Museum London, U.K. 18 June 2014.
Citation preview
Vince Smith, NHM, London
EC Horizon 2020 Research Infrastructures Information Day, 18 June 2014
FP7 Funded RI Project experiences some overly honest tips from a project coordinator
My research background
Circa 5,000 spp. Mammals & birds
12,000 associations 15,000 potential hosts
Enabling research via (small) digital infrastructures
Circa 5,000 spp. Mammals & birds
12,000 associations 15,000 potential hosts
http://darwin.zoology.gla.ac.uk/~rpage/LouseBase/2/
LouseBASE
Specimens Images
(SID)
http://darwin.zoology.gla.ac.uk/~SID/
Literature
PHPBib
http://myphpbib.sourceforge.net/
Lab Notebook
http://www2.flmnh.ufl.edu/pdb/
Host-Parasite Checklists
http://www2.flmnh.ufl.edu/adb/
EC funding opportunities, a question of scale
• Became involved with (and frustrated by) EC projects
• Fixing these issues required getting involved
• Invited as a FP6 proposal reviewer
• Started writing FP6/7 proposals
FP6/7 eInfrastructure Projects
European Distributed Institute of Taxonomy (EDIT)27 EU taxonomic institutions, 5-yrs, FP6 funded NoE 2006-11, €11.5 mTowards a European Museum of Natural History by functionally federating existing facilities
Synthesis of Systematic Resources (SYNTHESYS) [1,2 & 3]18+2 partners, 4-years,FP7 funded eInfrastructure 2013-17, €8.9 mImproving physical and digital access to European natural history collections collections
Virtual Biodiversity Research and Access Network for Taxonomy (ViBRANT)17 partners, 3-years, FP7 funded eInfrastructure 2010-13, €4.75 mSupported the development of virtual research communities involved in biodiversity science
Experiences developing, running & sustaining projects
• Project planning and design
• Management
• Sustainability
• Reviews & outputs
Mostly common sense?(Caveat: my judgment derived from experience rather than study)
Project Planning & Design Issues
• Set "Goldilocks goals" (suitably ambitious but realistic)
• Embed your users in every aspect (and ideally be a user)
• Build in agility (reassess and redefine milestones)
• Identify realistic partners (with a track record)
• Avoid silos (for both partners & activities)
• Submit it to the right call!
Open source & modular
Open source & modular
Infrastructure maintenanceInfrastructure maintenance
Technical maintenance
Technical maintenance User supportUser support
Crowd-sourcing support
activities
Crowd-sourcing support
activities
Maximising support
efficiency
Maximising support
efficiency
Management Issues
• Teamwork (a day-to-day project manager is critical)
• Devolve as much responsibility as possible
• Communication is key
• Use the Web as much as possible
• Keep a healthy travel budget (and use it)
• Measure and monitor progress (KPI dashboard)
• Advisory boards (mixed views)
SYNTHESYS Project Management & Access
Websites
Sustainability Issues
• The sustainability plan starts now!
• Embed sustainability activities at every level
– For infrastructure (align with institutional strategy)
– For content (an active user community)
– For training and development (e.g. “ambassadors”)
– For marketing
– For strategy
• Think programme, not project!
23 ambassadors 23 ambassadors in 19 countries; in 19 countries;
600 communities, 600 communities, 7,100 active users 7,100 active users
23 ambassadors 23 ambassadors in 19 countries; in 19 countries;
600 communities, 600 communities, 7,100 active users 7,100 active users
Project Reviews & Outputs
• Link to external community events where possible
• Ideally, use reviews as an opportunity to do something useful
– e.g. Public launch activities, workshops or training events
– Strategy development
• Have tangible outputs (not just reports for reviewers)
• Or have a plan to build upon (use) project reports
• Invest in marketing and outreach