14
Click to edit Master title style Planning and Designing a Lean Manufacturing Facility

Joe piazza fma: burns & mc donnell engineering

Embed Size (px)

Citation preview

Page 1: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title style

Planning and Designing a Lean Manufacturing Facility

Page 2: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title style

HISTORY• Founded in 1898• 100% employee owned

STRENGTH• $2.0B sales• EPC capability

STABILITY• Growth during recession • < 4% employee turnover

SERVICE• 85%+ repeat client base• Relationship driven business model

Our Mission: Make Our Clients Successful

Company Profile

Page 3: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title style Locations

Page 4: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title style

• From start-to-finish, we provide:– Project Development & FEP:

• Site development• Environmental assessment &

permitting• Utility interconnection• Conceptual designs • Master planning• Technology selection• Estimating• LEAN | Six Sigma Design

– Plant & Site Support• Small capital projects• Troubleshooting• Project support• Field engineering

Full-Service Execution

– Engineer, Procure, & Construct• Detailed design• Project procurement &

expediting• Schedule & cost controls• Subcontractor sourcing &

prequalification• Safety & health training• Start-up & commissioning

Page 5: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleLean Six Sigma

• Lean Six Sigma (LSS) has historically been seen as a quality and efficiency tool used on the manufacturing floor

• Many manufacturing companies have begun to incorporate LSS methodologies into the design/ renovation of their facilities – Reduce Square Footage– Reduce Capital Construction Cost – Increase Efficiency– Optimize People & Product Flow– Leverage New Technologies

Page 6: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleTypical Process

• How many square feet do we need?• How big will the building be?• What is our budget to do this project?• What utilities are required?• Who is going to manage this project?• How quick can we get a layout done?

Are These the Right Questions??

Page 7: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleDesign for the Process

The Value Stream• People Flow• Material Flow• Material Management• Production of Goods• Management of Finished Goods• Information Management• Waste/Dunnage Management

Page 8: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleThe Design Process

• Design the Building or Space Around the Process• Collect Facility & Process Requirements• Select a Site

– Cause & Effect Matrix• Generate Conceptual Layouts Based on Data• Select a Layout and Simulate• Phased Design to Meet rate Increases• Estimate Cost• Build Schedule/Phase Construction

Page 9: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleThe Design Process – Data Collection

• Data Collection– Cycle Times– Work Schedules– Rate Demand– Takt Time

• Create Process Maps– VSM– Swim Lane– Spaghetti

• Collect Customer Requirements– Financial Requirements– Facility Goals– Quality and Efficiency Targets– Compliance & Permitting

0Subgroup 100 200

0.374

0.379

0.384

0.389

Ind

ivid

ual

Val

ue

1

111

1

11

11111111111111

11111111111

1

111111

1

1

11

1

1Mean=0.3761UCL=0.3769LCL=0.3754

L/H-61 L/H--62 L/H 06 L/H 63

0.000

0.005

0.010

Mov

ing

Ran

ge

111

111

1

11

1

1

11 1 11R=2.82E-04UCL=9.20E-04LCL=0

L/H-61 L/H--62 L/H 06 L/H 63

V-22 L/H Pylon Support

Page 10: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleAerospace Coating Facility

Process• Teamed with Industrial & Manufacturing Engineers• Mapped the Process• Improved the Process Flow• Generated the Process Layout• Integrated new technologies• Developed the Building Layout & Initial Design• Simulated the Process in the BuildingResults• Reduced Facility Footprint by 20% from Original Concept• Developed a Phased Build Plan for Production• Reduced Anticipated Capital Spend by 25%• Simulation Identified Areas for Improvement

Page 11: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleProjectile Manufacturer

Process• Created Manufacturing Cells• Developed Single Piece Flow• Generated the Cell Process Layout• Integrated Automated Material Handling• Developed the Building Layout & Design• Simulated the ProcessResults• Reduced Facility Footprint by 10% from Original Concept• Determined a Phased Build Plan to Support Increased Production• Reduced Cycle Time from 9 Days to 1 Day

Page 12: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title styleOil & Gas Supplier

• Process Design • Reduced Square footage by 15%• Manufacturing Process Design

• Automated Material Handling• Robotic Assembly & Machining• Robotic Machine Tending

• Automated material handling integrated into the manufacturing process

Page 13: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title style

Page 14: Joe piazza fma: burns & mc donnell engineering

Click to edit Master title style

Chris Williams, MBB, PMPProject ManagerBurns & [email protected]