Upload
fred-thomas
View
141
Download
1
Embed Size (px)
Citation preview
AG 2 0 0 0 C e n t e r P i v o t
I n s t a l l a t i o n
Step 1You’ll Need:
Installing an AG2000
On a Center Pivot
Measure the vertical riser on the pivot. Ensure there is sufficient straight pipe to meet the
requirements of the meter (see note).
Important Note!
AG2000-400 22" min. AG2000-800 30" min.
AG2000-600 38" min.
AG2000-1000 48" min.
Tape Measure
Step 2You’ll Need:
Installing an AG2000
On a Center Pivot
Cut out a section of straight pipe, insuring there are at least two pipe diameters of straight pipe on the inlet side of the meter, and one pipe diameter of straight pipe on the outlet side of the meter.
Tape Measure
Welding Tools
Step 2You’ll Need:
Installing an AG2000
On a Center Pivot
Cut out a section of straight pipe, ensuring there are at least two pipe diameters of straight pipe upstream of the meter, and one pipe diameter of straight pipe downstream of the meter.
Tape Measure
Welding Tools
Step 3You’ll Need:
Installing an AG2000
On a Center Pivot
Weld the appropriate ANSI flanges on each open end of pipe, ensuring the flanges are parallel, and the flange bolt holes are aligned.
Allow the welds to cool to ambient temperature.
Tape Measure
Welding Tools
Level
Step 3You’ll Need:
Installing an AG2000
On a Center Pivot
Weld the appropriate ANSI flanges on each open end of pipe, ensuring the flanges are parallel, and the flange bolt holes are aligned.
Allow the welds to cool to ambient temperature.
Important Note!
WARNING: DO NOT USE THE METER AS
A WELDING FORM.
THE HEAT AND/OR ELECTRICAL CURRENTS FROM THE WELDER
WILL DAMAGE THE METER AND VOID THE WARRANTY.
Tape Measure
Welding Tools
Level
Step 4You’ll Need:
Installing an AG2000
On a Center Pivot
Install the meter, with the direction arrow on the side of the meter pointed "up", and the Power/Output cable pointing "down".
Cable DownFlow Arrow
Up
Wrench
Step 4You’ll Need:
Installing an AG2000
On a Center Pivot
Install the equalization wires and tabs from the lug to the top and bottom pipe flanges for proper electrical grounding.
Wrench
Wire Cutters
Screw Driver
Tab on pipe flangeNot
meter flange
Tab on pipe flangeNot
meter flange
Step 5You’ll Need:
Installing an AG2000
On a Center Pivot
Use a cable tie to secure the Power/Output cable to the pivot, ensuring there is a small loop at the meter strain relief. This will help prevent water running down the cable, and into the meter.
Cable Ties
Wire Cutters
Step 6You’ll Need:
Installing an AG2000
On a Center Pivot
Install the Weather Guard protective cap over the meter head. This is a force-fit, so measurable pressure will be required for a correct fit.
Hands
Step 7You’ll Need:
Installing an AG2000
On a Center Pivot
Route the Power/Output cable to the appropriate pivot manufacturers panel.
Consult the Seametrics Instructions "Connections, AG2000" for specific electrical connections.
Important Note!
Connections, AG2000
is available on our website!Click the link
below to see it now (document may
open behind presentation).
Computer
Step 8You’ll Need:
Installing an AG2000
On a Center Pivot
Your meter is installed! Refer to the Seametrics AG2000 Instruction Manual
for additional information and instructions.
Important Note!
Congratulations!
Your properly installed AG2000will provide years
of low maintenanceoperation.
A Cold One
For Additional Support Call: 800-975-8153