Hunter Mill Road and Sunset Hills Road Study Community Meeting #4 Progress Update June 29, 2016 Kristin Calkins Fairfax County Department of Transportation

Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Embed Size (px)

Citation preview

Page 1: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Hunter Mill Road and Sunset Hills Road Study

Community Meeting #4Progress Update

June 29, 2016

Kristin CalkinsFairfax County Department of Transportation

Page 2: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

2

Presentation Agenda• Project Objectives• Summary of Community Comments• Review of Developed Alternatives• Traffic Analysis Results • Next Steps• Colvin Run Bridge• Questions and Answers

Page 3: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

3

Project Objectives• Address existing congestion• Plan for future traffic• Address queuing along Hunter Mill Road and

Sunset Hills Road• Improve access to the Dulles Toll Road by

minimizing congestion• Maintain Hunter Mill Road’s character by

applying context sensitive solutions

Page 4: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

4

Project Study AreaIntersection ID Intersection

CurrentIntersection Control Type

1Hunter Mill Road at Sunrise Valley Drive

Signalized

2Hunter Mill Road at

DTR EB RampsSignalized

3Hunter Mill Road at

DTR WB RampsSignalized

4Hunter Mill Road at

Sunset Hills RoadSignalized

5Hunter Mill Road at

Crowell RoadUnsignalized

(All-Way Stop)

6Hunter Mill Road at Hunting Crest Lane

Unsignalized(Two-Way Stop)

7Hunter Mill Road at

Lake Fairfax ParkUnsignalized

(Two-Way Stop)

7

6

5

4 32

1

Page 5: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

5

Project Background• Board of Supervisors authorized study as a follow-on

study to the Reston Phase I Plan Amendment• Three meetings held thus far:

• December 8, 2014: Kick-Off • February 24, 2015: Existing & No-Build conditions and

community input on alternatives• May 20, 2015: Analysis Findings

• July 2015: Project put on hold at request of community to allow for new capacity analysis methodologies for roundabouts to be adopted by the Transportation Research Board

Page 6: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Project ProcessKi

ck O

ff M

eetin

gEx

isting

Co

nditi

ons

Futu

re

Cond

ition

s

Com

mun

ity

Mee

ting #

2

Deve

lopm

ent o

f Al

tern

ative

s

Com

mun

ity

Mee

ting #

3

Proj

ect p

ut

on H

old

Com

mun

ity

Mee

ting

#4

Anal

ysis

of

Alte

rnati

ves

Com

mun

ity

Mee

ting #

5

Sele

ction

of

Pref

erre

d Al

tern

ative

Final

Repo

rt

Com

mun

ity

Mee

ting #

6

Inco

rpor

ation

into

Com

p Pl

an

24 MONTHS

6

We are Here

Page 7: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Summary of Community Comments• Concern that traffic from Wiehle Avenue may be

diverted to Hunter Mill Road• Concern that the signal at Crowell Road may

increase delays in the off-peak• Maintain the character of Hunter Mill Road• Main goal of study is to improve Level of Service

(LOS) on Hunter Mill Road

7

Page 8: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Summary of Community Comments (Cont.)• Roundabouts preferred at Dulles Toll Road ramps• Widen Hunter Mill Road from eastbound Dulles

Toll Road to Sunrise Valley Drive• Concern that improvements may attract more

development• Community wants an in-depth review of

roundabouts• There should be a mix and match of alternatives

8

Page 9: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

9

Alternatives Developed Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

No-BuildCrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 1ACrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 1B

Roundabout

Signal Proffered

Page 10: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

10

Alternatives Developed (Cont.)Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

No-BuildCrowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 2Crowell Road

Sunset Hills Road

Sunrise Valley Drive

Hunt

er M

ill R

oad

WB DTR

EB DTR

Alt. 3

Signal Proffered

Page 11: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

11

May 2015: 2030 ComparisonIntersection

Roundabouts SignalsNo Build Alt. 1A Alt. 1B Alt. 2 Alt. 3

OVERALL LOS AM (PM)Hunter Mill Rd. @Sunrise Valley Dr. D (D) B (E) B (E) D (D) D (D)

Hunter Mill Rd. @DRT EB Ramps C (C) B (A) B (A) B (B) B (B)

Hunter Mill Rd. @DTR WB Ramps C (E) - B (E) B (D) B (C)

Hunter Mill Rd. @DTR WB Ramps & Sunset Hills Rd. - F (F) - - -

Hunter Mill Rd. @Sunset Hills Rd.* D (D) - - D (C) -

Hunter Mill Rd. @Crowell Rd.** C (C) C (A) - C (C) -

Hunter Mill Rd. @Crowell Rd. / Sunset Hills Rd. - - E (B) - D (C)

LOS Standard = LOS D* Alt 2 in new location ** No Build includes the proffered signal at Crowell Road

Page 12: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

New Roundabout Methodology• New research resulted in:

• Re-assessment of Roundabout Capacity Models for the Highway Capacity Manual

• New methodology (adopted January 2016) resulted in an approximate 10-12% increase in roundabout capacity

• New model prioritizes movements with higher volumes• Resulting in improved LOS for heavier movements and overall

LOS

• This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts

12

Page 13: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Sunrise Valley Drive Intersection

13

Year 2030 HCM 2010 2015 ModelSouthbound A (A) A (A)

Eastbound B (F - 177 sec) B (F - 135 sec)

Westbound B (A) E (B)

Overall B (E) C (D)Results for AM(PM)

This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts

Page 14: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Dulles Toll Road Eastbound Ramps

14

Year 2030 HCM 2010 2015 ModelNorthbound B (B) C (B)

Southbound A (A) A (B)

Eastbound B (B) B (C)

Overall B (A) B (B)Results for AM(PM)

This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts

Page 15: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Dulles Toll Road Westbound Ramps

15

Year 2030 HCM 2010 2015 ModelNorthbound A (A) A (A)

Southbound B (F - 178 sec) B (F - 109 sec)

Westbound B (B) C (C)

Overall B (E) B (D)Results for AM(PM)

This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts

Page 16: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Dulles Toll Road Westbound Ramps / Sunset Hills Road

16

Year 2030 HCM 2010 2015 Model

Northbound B (B) B (A)

Southbound F - 535 sec (F - 220 sec)

F - 98 sec (C)

SE-bound B (F - 107 sec) B (E)

Westbound C (C) D (F - 100 sec)

Overall F – 175 sec (F – 80 sec) D (D)

Results for AM(PM)

Data for the new methodology is based off of 4-leg roundabouts.

This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts

Page 17: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

Crowell Road / Sunset Hills Road

17

Year 2030 HCM 2010 2015 ModelNorthbound B (A) B (B)

Southbound F - 339 sec (B) F - 177 sec (A)

Eastbound A (B) B (B)

Westbound B (B) C (B)

Overall E (B) D (B)Results for AM(PM)

This study is an operational assessment, not an engineering design. Roundabouts generally have greater ROW impacts

Page 18: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

18

June 2016: 2030 ComparisonIntersection

Roundabouts SignalsNo Build Alt. 1A Alt. 1B Alt. 2 Alt. 3

OVERALL LOS AM (PM)Hunter Mill Rd. @Sunrise Valley Dr. D (D) C (D) C (D) D (D) D (D)

Hunter Mill Rd. @DRT EB Ramps C (C) B (B) B (B) B (B) B (B)

Hunter Mill Rd. @DTR WB Ramps C (E) - B (D) B (D) B (C)

Hunter Mill Rd. @DTR WB Ramps & Sunset Hills Rd. - D (D) - - -

Hunter Mill Rd. @Sunset Hills Rd.* D (D) - - D (C) -

Hunter Mill Rd. @Crowell Rd.** C (C) C (A) - C (C) -

Hunter Mill Rd. @Crowell Rd. / Sunset Hills Rd. - - D (B) - D (C)

LOS Standard = LOS D* Alt 2 in new location ** No Build includes the proffered signal at Crowell Road

Page 19: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

19

Next Steps • Perform a Roundabout Geometric Study

• Focusing right-of-way, constructability, & refined geometry• Evaluate New “Mix and Match” Alternative(s)• Further evaluate the feasibility of Sunset Hills Road

Realignment• Focusing on alignment & right-of-way

• Additional analysis based on Reston Network Analysis volumes for 2050

• Public meeting to update community on work in the fall

Page 20: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

20

Next Steps (cont.)• Select a preferred alternative

• Based on analysis and community feedback• Comprehensive Plan Amendment

• Public Hearings

• Potential Interchange Modification Report/study• If a roundabout alternative is selected as the

preferred alternative• Identify funding for the project

Page 21: Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4

21

Colvin Run Bridge• Bridge is structurally deficient and functionally

obsolete• Hunter Mill Road carries 7,900 vehicles daily

• Warrants a 2 lane bridge (VDOT considers one lane bridges acceptable for 400 vehicles per day)

• Construction will take place based on funding availability

• Community outreach will commence once VDOT has acquired funding for the design of the bridge