Newington Road Pedestrian Bridge Replacement ProjectMount Vernon District

Department of Public Works and Environmental Services

Working for You!

A Fairfax County, VA, publicationJune 2014

Page 2: Newington Road Pedestrian Bridge Replacement Project June 2014

Maintenance and Stormwater Management Division

Newington Rd. Pedestrian Bridge Replacement Project

Page 3: Newington Road Pedestrian Bridge Replacement Project June 2014

Maintenance and Stormwater Management Division

Project Location Newington Rd. Lorton, Va. Tax Map No: 094.1 ((01)) 0001

Page 4: Newington Road Pedestrian Bridge Replacement Project June 2014

Project DetailsDescription:Removal of structurally damaged pedestrian bridge and replacement with a new bridge matching the existing abutments and anchor bolt pattern. This bridge replacement project was paired with another nearby bridge replacement by matching the size and specifications of each replacement bridge for a cost effective bid response from various competing bridge fabricators.

Project Overview: Newington Rd. closure and detour in coordination with FCPS busing schedule and notification to

police and fire and rescue services. Notification to motorists with advance warning message boards. De-energizing electrical power to 180 residences and 1 business with advance notice. Lifting of existing four ton pedestrian bridge over power and communications lines to awaiting

trailer and lifting new bridge into place. Road closure, local power outage, and lifting operations were completed in approximately 1-1/2

hours.

DPWES Project Team: Design Engineer: Bill Schell (MSMD) Project Manager: Richard Markey (MSMD) Construction Supervisor: Sean Geyer (MSMD)

Newington Rd. Pedestrian Bridge Replacement Project

Page 5: Newington Road Pedestrian Bridge Replacement Project June 2014

Newington Rd. Pedestrian Bridge Replacement Project

Pre-Construction Condition

Flooded water height

Maintenance and Stormwater Management Division

Both the top cord and lower chord of the structural truss was damaged when a large tree fell on the bridge, which compromised the long term integrity of the bridge.

Page 6: Newington Road Pedestrian Bridge Replacement Project June 2014

Construction Photos

Maintenance and Stormwater Management Division

Newington Rd. Pedestrian Bridge Replacement Project

Page 7: Newington Road Pedestrian Bridge Replacement Project June 2014

Construction Photos

Maintenance and Stormwater Management Division

Newington Rd. Pedestrian Bridge Replacement Project

Page 8: Newington Road Pedestrian Bridge Replacement Project June 2014

Maintenance and Stormwater Management Division

Newington Road Pedestrian Bridge Replacement Project

Before After

Page 9: Newington Road Pedestrian Bridge Replacement Project June 2014

Newington Rd. Pedestrian Bridge Replacement Project

Maintenance and Stormwater Management Division

For additional information, contact

Irene Haske, Public Information Officer