A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Scotts Run Tributary at Windy Hill Road Stream Stabilization Project May 2016

Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

Embed Size (px)

Citation preview

Page 1: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

A Fairfax County, VA, publication

Department of Public Works and Environmental Services

Working for You!

Scotts Run Tributary at Windy Hill Road

Stream Stabilization Project

May 2016

Page 2: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

2Stormwater Planning Division

Agenda

Project ScopeBackgroundGoals and ObjectivesExisting ConditionsProject ConceptNext StepsContact Information

Page 3: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

3Stormwater Planning Division

Stormwater Program Regulatory Drivers

• National Pollutant Discharge Elimination System (NPDES)

• Virginia Stormwater Management Program (VSMP)– Municipal Separate Storm Sewer Permit (MS4)– Discharge from approximately 7,000 storm drain outfalls– Includes watershed planning and project implementation

• Total Maximum Daily Loads (TMDLs)– Chesapeake Bay– Local Streams– Establishes pollutant loading budget for a given impaired water

body to meet water quality standards

Page 4: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

4

Scotts Run Watershed• 3,860 acres in Fairfax County• 30% impervious of mostly low

density residential land use• Drains significant commercial

and medium-density resident areas located near Tysons Corner

• Scotts Run discharges into the Potomac River

• Watershed Management Plan identifies frequent flooding at Scotts Run Road

http://www.fairfaxcounty.gov/dpwes/watersheds/middlepotomac.htm

Stormwater Planning Division

Page 5: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

5Stormwater Planning Division

Project Objectives

Restore up to 650 linear feet of stream from Windy Hill Road to Box Elder Court:

Stabilize streambed and banks Reduce sediment and nutrient inputs into stream system

Improve habitat Maintain close coordination with stakeholders

Page 6: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

6Stormwater Planning Division

Social Goals1. Maintain open dialog and share information.2. Coordinate with all the stakeholders and the community.3. Design Team:

o Rinker Design Associates, P.C.o Utilities Design and Construction Divisiono Stormwater Management

o Stormwater Planning Divisiono Maintenance and Stormwater Management Division

o Urban Forestry

Page 7: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

7Stormwater Planning Division

Environmental Benefits

Improve watershed conditions and reduce downstream impacts through….

Controlling quantityMitigate flooding where possible

Controlling velocityReduce erosionProtect infrastructure

Page 8: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

8Stormwater Planning Division

Project Location

Windy Hill Road

Box Elder Court

Scotts Run RoadProject Limits

Lewinsville Road

495

Page 9: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

9Stormwater Planning Division

Drainage Area

Page 10: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

10Stormwater Planning Division

Existing Conditions

Page 11: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

11Stormwater Planning Division

Existing Conditions

Page 12: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

12Stormwater Planning Division

Existing Conditions

Page 13: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

13Stormwater Planning Division

Existing Conditions

Page 14: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

14Stormwater Planning Division

Existing Conditions

Page 15: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

15Stormwater Planning Division

Existing Conditions

Page 16: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

16Stormwater Planning Division

Existing Conditions

Page 17: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

17Stormwater Planning Division

Existing Conditions

Page 18: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

18Stormwater Planning Division

Existing Conditions

Page 19: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

19Stormwater Planning Division

Typical Structures Used – Plunge Pool

Page 20: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

20Stormwater Planning Division

Typical Structures Used – Cross Vanes

Page 21: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

21Stormwater Planning Division

Typical Structures Used – Rock Weirs

Page 22: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

22Stormwater Planning Division

Typical Structures Used – Boulder Toe

Page 23: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

23

Vegetation

• Coordinate tree preservation and removal with Urban Forestry

• Native trees, shrubs, and plugs will be planted

• Native seed mix

Stormwater Planning Division

Page 24: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

24Stormwater Planning Division

Tentative Construction Access

Windy Hill RoadScotts Run Road

Page 25: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

25Stormwater Planning Division

Before and After Stream Restoration

Page 26: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

26Stormwater Planning Division

Construction Access

• Timber matting along the length of the access route

• Safety fencing around the site

Page 27: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

27Stormwater Planning Division

Construction Example

Page 28: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

28Stormwater Planning Division

Construction Example

Page 29: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

29Stormwater Planning Division

Construction Example

Page 30: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

30Stormwater Planning Division

Growing Season Following Construction Completion

Page 31: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

31Stormwater Planning Division

One Year After Construction Completion

Page 32: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

32Stormwater Planning Division

Three Years After Construction Completion

Page 33: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

33Stormwater Planning Division

Before and After Examples

Flatlick Confluence

January 2011 September 2015

Page 34: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

34Stormwater Planning Division

Before and After Examples

Big Rocky Run II

April 2011 September 2015

Page 35: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

35Stormwater Planning Division

2011

2013 2015

Before

Before and After Examples

Bridle Path

Page 36: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

36Stormwater Planning Division

Next Steps – Schedule

• Complete Preliminary Design- July 2016

• Complete 95% Design- September 2016

• Community Meeting- September 2016

• Complete Final Design- Late Fall 2016

• Construction:

• Start- Spring 2017

• Length- 3 to 4 months (constructed in phases)

• Planting may take place in the fall

Page 37: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

37Stormwater Planning Division

Online ResourcesStormwater Planning Division Websitehttp://www.fairfaxcounty.gov/dpwes/stormwater/

Fairfax County Watershed Planninghttp://www.fairfaxcounty.gov/nvswcd/newsletter/planning.htm

Scotts Run Watershed Planhttp://www.fairfaxcounty.gov/dpwes/watersheds/middlepotomac.htm

EPA Water Quality Laws & Regulationshttp://www.epa.gov/water/laws.html

Please sign in and provide your contact information to be included in project progress updates

Page 38: Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project

38Stormwater Planning Division

Contact InformationContact Information

DesignCatie Torgersen– Project Manager

[email protected]

Fairfax County Stormwater Planning Division703-324-5500 TTY 711