Introduction

• Located in New Delhi• Opened in July 2010• The busiest airport In South Asia • Current capacity - 34 Million Passengers• Planned expansion by 2030 – 100 Million Passengers• T3 has India's First Automated Parking

Management system• IGIA was built at a cost of INR128.5bn ($2.7bn)• 5.4 million square feet Area • Connected by Delhi Metro railway

Page 4: Indira Gandhi International Airport

Cont...

• The airport was operated by the Indian Air Force• Its management was transferred to the airports authority of

India. • In May 2006, the management of the airport was passed over

to Delhi International Airport Limited (DIAL), a public-private consortium led by GMR group.

• DIAL - a joint venture of Indian govt. and GMR group (PPP)

Page 5: Indira Gandhi International Airport
Page 6: Indira Gandhi International Airport
Page 7: Indira Gandhi International Airport

50%

10%10%

4%

26%

STAKEHOLDERS GMR GROUP FRAPORT AGMALAYSIA AIRPORT INDIA DEVELOPMENT FUNDAAI

Page 8: Indira Gandhi International Airport
Page 9: Indira Gandhi International Airport

Costing & Expenditure

• The original project cost approved by DIAL and communicated to AAI on 18 January 2008 was INR 8975 crores

• The actual project cost went up to INR 12857 crores

• The final project cost adopted by  Airports Economic Regulatory Authority (AERA) for arriving at the Regulatory Asset Base (RAB) was 12502.86 crores

Page 10: Indira Gandhi International Airport

Total cost estimates during Financial closure - 2008

(Rs.Crores)

Cost as per estimates in Final cost in March 2010 CostJanuary 2008 adopted by AERA Escalation

Funding (2) (3) ( Percentage)

(1) 3(b) -2(b)Amount % of total Amount % of total

(a)Cost

(a)cost

(b) (b)

Equity 1202 13.39 2300 18.40 5.01

Loans 4986 55.55 5266 42.11 (-) 13.44

Security deposits 2738 30.51 1471.51 11.77 (-) 18.74

Internal accruals 49 0.55 50 0.40 (-) 0.15

DF - - 3415.35 27.32 27.32

Total 8975 100 12502.86 100

Page 11: Indira Gandhi International Airport

IGIA Technical Specifications & Comparison

INDIRA GANDHI INTERNATIONAL AIRPORT SPECIFICATIONS

FACTSHEET

Airport location 16km/10miles from city centres

Total Terminals Terminal 1 – Domestic ( T1D Dep, T1C Arrival) Terminal 3

Security 3000 CCTV cameras

Area T-3 5.4 Million sq.ft

Baggage handling system Capacity to handle 12800 bags per hour

6 Common check-in area 168 check-in counters

95 Immigration counters 49 Outbound and 46 Inbound Immigration counters

78 Passenger Boarding Bridges 3 Passenger Boarding Bridges for A380 or similar sized aircraft

100 room Transit Hotel Domestic and International passengers

Multi Level Car Park Accomodating 4300 cars

Page 12: Indira Gandhi International Airport

Comparison – Capacity & Construction Time

AIRPORT CAPACITY(Passengers)

TIME

Changi Airport – Singapore (T3) 22 Million 76 months

Heathrow T5 – London, UK 25 Million 60 months

Beijing Airport New terminal for Olympics – T3, China

45 Million 60 months

IGI Airport – T3, New Delhi, India 34 Million 37 months

Page 13: Indira Gandhi International Airport

Statistical Comparison of Construction - Time & Capacity of Terminal 3

Changi Airport

Singapore

Heathrow- London

Beijing airport

IGI T3 India0

10

20

30

40

50

60

70

80

Time(in months)Capacity(in million)

Page 14: Indira Gandhi International Airport

Resources

About 16,000 workmen and 1200 design and construction staff were employed.

Construction Area Materials used

Building 600000 of concrete & 200000 tonnes of reinforced steel

Roof 18000 tonnes of reinforced steel

Floor 110000 square meters of granite

Windows 95000 square meters of glass

Runway 650000 tonnes of asphalt, concrete treated base and special layer of glass grid

Page 15: Indira Gandhi International Airport

Suppliers SERVICES SUPPLIERS

Baggage Handling System Siemens

IT Infrastructure Wipro

Air Conditioners Carrier India

Electrical Products & Services ABB Group

Telephones & Mobile services Bharti Airtel

Carpet Material Brintons, UK developed in Pune

Engineering and development Consultancy

Mott Macdonald

Conveyor Belt Siemens; Crisplant and ARINC

Page 16: Indira Gandhi International Airport

Cont…

• Security Cameras and CCTV’s

• Airport Systems

• Travelators, Elevators &Escalators

• Information boards and Monitors

• Electrical Substations

Page 17: Indira Gandhi International Airport

Socio - Economic Issues

• Farm house weddings pose threat to flights landing at IGI airport

- Incidents of vision distraction due to laser beams

-The Air Traffic Control Report & Delhi Police Actions

• 4 international airports hub of 94% drug smuggling cases

-Narcotics Control Bureau (NCB) &airport security force CISF

-One held with six gold biscuits at IGIA Recently

Page 18: Indira Gandhi International Airport

Cont…

• Government must make Airport infrastructure more investor-friendly

-Prime Minister Narendra Modi-led NDA government

-Reforms in regulation and policy

- Make In India vs Real changes in this sector

Page 19: Indira Gandhi International Airport

CSR Initiatives of DIAL

• Children’s Creativity Centre (IBM)• Bridge Course Program for Girls• A full-fledged dispensary & Health camps• Residential vocational training facilities

Page 20: Indira Gandhi International Airport

Challenges

• L&T implemented the Aconex online collaboration system• Total external finance requirement for the project (Rs. 500

crore for T3)• IDFC’s ‘one firm’ solution IDFC – Capital, Project Finance

and Legal)• IT Challenges : Support of Wipro• Political Opposition :Such an expensive terminal building at

Delhi is absolutely not justified

Page 21: Indira Gandhi International Airport

List of Facilities

Medical Facilities

Left Luggage FacilityEntertainment Options

Sleeping PodsInternet Facilities

Page 22: Indira Gandhi International Airport

Conclusion

• Eco – Friendly

• Revenue Generator

• Prestigious National Asset

• Successful Project

Page 23: Indira Gandhi International Airport
Page 24: Indira Gandhi International Airport

Thank You