14
PRESENTATION ON Passive down drought evaporative cool tower Members : BHARAT YADAV 1016140007 KAUSHAL SONAKAR 1016140020 SHIVENDRA PRATAP SINGH 1016140049 MANUJ SINGH 1016140025 GUIDE NAME : Dr. A.B DATY (DIRECTOR KEC)

PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

Embed Size (px)

DESCRIPTION

APPLICATION OF PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER IN DESERT COOLER

Citation preview

Page 1: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

P R E S E N TAT I O N

ON

Passive down drought evaporative cool tower

Members :BHARAT YADAV 1016140007KAUSHAL SONAKAR 1016140020SHIVENDRA PRATAP SINGH 1016140049MANUJ SINGH 1016140025

GUIDE NAME :

Dr. A.B DATYE(DIRECTOR KEC)

Page 2: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

• OBJECTIVE.• WHY THIS PROJECT.• IDEA OF WORK.• PLAN OF ACTION.• COST OF PROJECT.• IMAGES.

CONTENTS..

Page 3: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

OBJECTIVE :

• TO ATTAIN COMFORT ZONE BY MODIFICATION IN PRESENT EXISTING SYSTEM.

• TO DEVELOP A NEW MODULE OF ENERGY CONSERVER.

Page 4: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

WHY THIS PROJECT….

As Air conditioner consumes more power( approx. 15-20KW) Emits harmful gases such as CFC and much costly.

By using application of passive down drought evaporative

cooling tower in desert cooler , and could be better substitute of A.C.

Thus this project solves this problems and is efficient as well as economical and tends to provide comfort zone.

Page 5: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

IN ORDER TO GET COMFORT ZONE IN TERMS OF

TEMPRATURE DIFFERENCE BY USING PRINCIPLE OF

EVAPORATION .

IDEA OF WORK ( scope )

Page 6: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

Step 1: calculation of current attributes of room such as humidity and temperature .

Step 2: modification on current system .

Step 3: comparing of readings after the accomplishment of experiment.

project completion date ( 3rd week of APRIL)

Plan of action…

Page 7: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

Showering system 130*4 ≈ ₹520Elbow and tee joint ₹500Pipe 20 ft. ≈ ₹300Pump 4*400 ≈ ₹1600other…. ₹500

Total cost Approx ≈ 5000 *(cost excluding the cost of existing model)

COST OF THE PROJECT….

Page 8: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER
Page 9: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER
Page 10: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER
Page 11: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER
Page 12: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER
Page 13: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

ANY QUERIES? ? ? ?

Page 14: PASSIVE DOWN DROUGHT EVAPORATIVE COOLING TOWER

THANK YOU