Upload
william-chui
View
89
Download
0
Embed Size (px)
Citation preview
1
PERI Asia Pte LtdSpecial Edition | 2016 SG
25th company anniversary
Successful construction with PERI
ForewordPage 5
PERI | Innovation and leadership in formwork and scaffolding technologyPage 6
PERI Asia | Your local material and equipment supplier and engineering companyPage 12
PERI Asia | Reference Projects Page 16
Marina Bay Sands
Content
Foreword 5
PERI | Innovation and leadership 6in formwork and scaffolding technology
Milestones of constructiontechnology
Subsidiaries worldwide
Products and Systems
PERI Asia | Your local material and 12equipment supplier andengineering company
Milestones
Emerging Markets
More than just products
PERI Asia | Reference Projects 16
Civil Engineering
Commercial and Residential Buildings
Institutional Buildings
Industrial Buildings
PERI Cares 26
Openness and trust in dealing with each other, recognizing the value-add to our customers as the key for success, being bold and courageous in facing transformation and change – we at PERI live our guiding principles on a daily basis.
5
Dear valued partners andprospective customers,
It is a great pleasure for me to introduce our "25th company anniversary” edition to you.
PERI can look back on nearly 50 years of global experience.The great innovation strength and the early internationalisation are the pillars of the global success and steady growth. The high level of customer focus, of quality systems and of expertise create the confidence which has made the company a leading global brand.
After successfully venturing into the Singaporean market in 1982, PERI established its 12th subsidiary in Singapore on 14th May 1991. PERI Asia is today one of more than 60 subsidiaries worldwide.
This year we are celebrating our 25th company anniversary.
PERI Asia has been continuously growing – based on your confidence in our comprehensive services and our strong German foundation as a family owned company with a long-standing sense of values and a clear target: to provide the best performance and service to our customers. Thanks to your trust in our products and systems PERI Asia has been involved in numerous iconic projects across Singapore.
This special edition is dedicated to our long term partners in Singapore.
It showcases the history of PERI, the strong foundation of PERI Asia in Singapore and it displays a variety of your projects, utilising our products and systems, which have been shaping Singapores’ landscape.
On behalf of PERI, my predecessors and my team I would like to thank you for your support and partnership throughout these years.
Rest assured that we will continue working hard to achieve our goal: To be your most innovative and therefore preferred partner for construction and industry in Singapore.
I personally wish you great memories while reading.
We look forward to being of best service to you.
Marco RomahnManaging DirectorPERI Asia Pte Ltd
PERIMilestones of construction technology
1969 Founded by Arthur SchwoererPERI T70 - The first girder is produced.
1970 First major contractScharnebeck ship lift facility near Lüneburg, Germany. The world´s biggest twin vertical ship lift connects the Mittelland Canal and the River Elbe bridging a height difference of 38 m.
1974 The first subsidiaries, PERI expands in EuropeThe first subsidiaries are founded in Switzerland and France.
1984 Heading into a new eraPERI USA is the first subsidiary outside the European continent.
GT 24 wooden lattice girderAs a further development of the T-70 V with its 36 cm height, the new GT 24 wooden lattice girder provides more flexibility on the construction site through 12 cm less overall height but with the same dimensional stability.
1985 Atatürk Dam, TurkeyThe mobile SKS single-sided climbing formwork begins its international success story with the construction of the third largest dam in the world.
TRIO – Europe´s leading panel formwork is launchedThe universal wall formwork system is characterized by having few different
individual components resulting in faster forming operations. The patent for the TRIO panel formwork is used for 20 years; immediately after this, imitations start to appear on the market.
1989 A new milestone in self-climbing technologyPERI introduces the ACS self-climbing system. Climbing takes place with the hydraulic climbing mechanism without the use of a crane. Well-designed working platforms protect site personnel during all weathers.
1991 CAD software73 modern CAD work stations replace the drawing boards in Weissenhorn.
7
1995 Petronas Towers, Kuala Lumpur, MalaysiaFor construction of the 452 m high building, the use of the ACS self-climbing system ensures smooth and problem-free construction progress.
1998 PERI UP scaffold systemWith the development of the PERI UP scaffold system, PERI begins its activities in the scaffolding market. The PERI UP T 72 facade scaffolding with T-frame and guardrail in advance is safe and cost-effective.
2000 PERI with a new logoThe horizontal arrow symbolizes the increasing market presence and the growing number of satisfied customers.
The vertical arrow stands for the improvement in quality of all PERI services.
Production20,000 linear metres of girders are produced per day.
2003 Viaduc de Millau, FranceThe 2.5 km long cable-stayed bridge is constructed using special steel formwork, which rose steadily upwards cycle-by-cycle with the help of the ACS self-climbing system.
2005 Investment in the futurePERI expands the production area by 80% and doubles the size of the logistics and delivery facilities. Altogether, PERI invests approx.
80 million euros for securing the Weissenhorn plant.
2007 SustainabilityThe biomass power plant at the central production site in Weissenhorn is a symbol of combined economic and ecological sustainability at PERI.
2011 Re-development of the Panama canalThe new construction of the giant lock facilities on the Atlantic and Pacific coasts respectively is the largest single order in the company's history
2013 Implementation of the Market Unit organisationsTo focus on requirements of overseas markets
PERI in Weissenhorn. Headquarters, development and production site since 1969.
8
PERISubsidiaries worldwide
With over 60 subsidiaries, we are present on all continents with locally-based experts. From these international activities with widely differing requirements of our customers regarding construction methods, materials and equipment utilization as well as labour costs, we generate our performance leadership.
This profound knowledge in all areas and all markets is bundled together in product development processes which then benefit local users again – everywhere. With the aim: rationalization, simplification, quality, safety. Turning local insights into global knowledge.
1969 - 1979 1997 - 19991980 - 1990 2000 - 20021991 - 1992 2003 - 20051993 2006 - 20071994 - 1995 2008 - 20111996 2012 - 2015
Germany, 1969PERI GmbH
USA, 1982PERI FormworkSystems Inc.
Malaysia, 1991PERI FormworkMalaysia Sdn. Bhd.
Sweden, 1993PERIform Sverige AB
Korea, 1994PERI Korea Ltd.
Brazil, 1996PERI Formas eExcoramentos Ltda.
Australia, 1997PERI Australia Pty. Ltd.
Ukraine, 2000PERI Ukraina
Mexico, 2003PERI Cimbras y Andamios S.A. de C.V.
Russia, 2006OOO PERI Russia
Panama, 2008PERI Panamá Inc.
Colombia, 2012PERI S.A.S.
France, 1974PERI S.A.S.
Italy, 1983PERI S.p.A.
Singapore, 1991PERI ASIA Pte. Ltd.
Norway, 1993PERI Norge AS
Portugal, 1994PERIcofragens, Lda.
Argentina, 1996PERI S.A.
United Arab Emirates 1997PERI (L.L.C.)
Bulgaria, 2000PERI Bulgaria EOOD
Latvia, 2003PERI SIA
India, 2007PERI (India) Pvt. Ltd.
Peru, 2008PERI Peruana S.A.C.
Algeria, 2012SARL PERI
Switzerland, 1974PERI AG
United Kingdom, 1989PERI Ltd.
Austria, 1992PERI Ges. mbH
Poland, 1993PERI Polska Sp. z o.o.
Canada, 1995PERI FormworkSystems Inc.
Chile, 1996PERI Chile Ltda.
Israel, 1999PERI Formwork andEngineering Ltd.
Estonia, 2002PERI AS
Serbia-Montenegro,2003PERI Oplate d.o.o.
Kazakhstan, 2007TOO PERI Kazakhstan
Albania, 2010PERI Formwork andScaffolding Sh. p. k.
Saudi Arabia, 2013PERI Saudi ArabiaCompany Ltd.
Spain, 1975PERI S.A.U.
Turkey, 1990PERI Kalip ve IskeleleriSanayi ve Ticaret Ltd.
Czech Republic, 1992PERI spol. s r.o.
Denmark, 1993PERI Danmark A/S
Romania, 1996PERI Romãnia SRL
Greece, 1999PERI Hellas SolelyOwned Ltd.
Lithuania, 2002PERI UAB
Croatia, 2004PERI Oplate i skele d.o.o.
Qatar, 2007PERI Qatar LLC
South Africa, 2011PERI (Pty) Ltd.
Kuwait, 2013PERI KuwaitCompany Ltd.
Philippines, 2014PERI Asia Philippines Inc.
Hong Kong, 2015PERI (Hong Kong) Ltd.
Belgium, 1979PERI S.A.
Netherlands, 1979PERI Holding B.V.
Hungary, 1990PERI Kft.
Japan, 2005PERI Japan K.K.
Belorussia, 2007IOOO PERI Belarus
Finland, 1993PERI Suomi Ltd. Oy
Slovakia, 1996PERI spol. s r.o.
5001.0001.5002.0002.5003.0003.5004.0004.500
5.5005.000
6.0006.5007.0007.5008.000
1.350 1.500 1.650 1.7001.900
2.1502.500
2.9503.345 3.500 3.600
3.8504.200
4.700
5.400 5.385 5.5005.800
‘93 ‘94 ‘95 ‘96 ‘97 ‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15
5.700
6.5006.700
7.000
7.700
100200300400500600700800900
1.1001.000
1.2001.3001.400
206246 252 252 276 299
353430
496 526 535615
760
920
1.110
873825
1.220
‘93 ‘94 ‘95 ‘96 ‘97 ‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15
9771.052
1.0991.141
1.300Turnover in million €
Personal Development(International)
9
1969 - 1979 1997 - 19991980 - 1990 2000 - 20021991 - 1992 2003 - 20051993 2006 - 20071994 - 1995 2008 - 20111996 2012 - 2015
Germany, 1969PERI GmbH
USA, 1982PERI FormworkSystems Inc.
Malaysia, 1991PERI FormworkMalaysia Sdn. Bhd.
Sweden, 1993PERIform Sverige AB
Korea, 1994PERI Korea Ltd.
Brazil, 1996PERI Formas eExcoramentos Ltda.
Australia, 1997PERI Australia Pty. Ltd.
Ukraine, 2000PERI Ukraina
Mexico, 2003PERI Cimbras y Andamios S.A. de C.V.
Russia, 2006OOO PERI Russia
Panama, 2008PERI Panamá Inc.
Colombia, 2012PERI S.A.S.
France, 1974PERI S.A.S.
Italy, 1983PERI S.p.A.
Singapore, 1991PERI ASIA Pte. Ltd.
Norway, 1993PERI Norge AS
Portugal, 1994PERIcofragens, Lda.
Argentina, 1996PERI S.A.
United Arab Emirates 1997PERI (L.L.C.)
Bulgaria, 2000PERI Bulgaria EOOD
Latvia, 2003PERI SIA
India, 2007PERI (India) Pvt. Ltd.
Peru, 2008PERI Peruana S.A.C.
Algeria, 2012SARL PERI
Switzerland, 1974PERI AG
United Kingdom, 1989PERI Ltd.
Austria, 1992PERI Ges. mbH
Poland, 1993PERI Polska Sp. z o.o.
Canada, 1995PERI FormworkSystems Inc.
Chile, 1996PERI Chile Ltda.
Israel, 1999PERI Formwork andEngineering Ltd.
Estonia, 2002PERI AS
Serbia-Montenegro,2003PERI Oplate d.o.o.
Kazakhstan, 2007TOO PERI Kazakhstan
Albania, 2010PERI Formwork andScaffolding Sh. p. k.
Saudi Arabia, 2013PERI Saudi ArabiaCompany Ltd.
Spain, 1975PERI S.A.U.
Turkey, 1990PERI Kalip ve IskeleleriSanayi ve Ticaret Ltd.
Czech Republic, 1992PERI spol. s r.o.
Denmark, 1993PERI Danmark A/S
Romania, 1996PERI Romãnia SRL
Greece, 1999PERI Hellas SolelyOwned Ltd.
Lithuania, 2002PERI UAB
Croatia, 2004PERI Oplate i skele d.o.o.
Qatar, 2007PERI Qatar LLC
South Africa, 2011PERI (Pty) Ltd.
Kuwait, 2013PERI KuwaitCompany Ltd.
Philippines, 2014PERI Asia Philippines Inc.
Hong Kong, 2015PERI (Hong Kong) Ltd.
Belgium, 1979PERI S.A.
Netherlands, 1979PERI Holding B.V.
Hungary, 1990PERI Kft.
Japan, 2005PERI Japan K.K.
Belorussia, 2007IOOO PERI Belarus
Finland, 1993PERI Suomi Ltd. Oy
Slovakia, 1996PERI spol. s r.o.
NEW | DUO Wall, Column and Slab Formwork
11
T 70VWooden Lattice Girder
KG 240Climbing Scaffold
STERAPanel Formwork
GRV Articulated Walerfor Circular Structures
KGF 240 Climbing and Travelling Formwork
PD 8Shoring Tower
STERA PLUSPanel Formwork
VARIO GT 24Wall Formwork
AKF Tie-LessClimbing Formwork
MODUL Aluminium Slab Formwork
RAPID Aluminium Column Formwork
GT 24Wooden Lattice Girder
SKS Single-Sided Climbing Formwork
TRIOPanel Formwork
RUNDFLEXGirder Circular Formwork
CBClimbing Scaffold
ACSSelf-Climbing System
SKYDECK Aluminium Slab Formwork
MULTIPROPSystem
ELPOSPlanning Software
HD 200Heavy-Duty Props
DK / SKTie Technology
DOMINOPanel Formwork
TRIOHousing
VTTable Module
FB 180Folding Platform
PEPTubular Steel Slab Prop
TRIOShaft Element
VARIO QUATTROColumn Formwork
TRIOPlatform
SKYTABLESlab Table
PERI CADPlanning Software
PERI UP Frame and Modular Scaffolding
UNO Monolithic Housing Formwork
MAXIMO MXPPlatform
VARIODECKSlab Table
VARIOKITParapet Track
VARIOKIT Heavy-Duty Shoring Tower
PEP ErgoTubular Steel Slab Props
MAXIMO MXSEShaft Element
MPB 24Aluminium Beam
RUNDFLEXPlus
RCSClimbing System
MAXIMOPanel Formwork
VARIOKIT Engineering Construction Kit
GRIDFLEXSlab Formwork
PERI UP Rosett FlexIndustrial Scaffolding
DUOUniversal Formwork
MAXIMO MXHHeated Formwork
PERI UP Easy Facade Scaffolding
SKYMAXSlab Formwork
ACS Core 400Self-Climbing Formwork
ALPHAKIT EngineeringConstruction Kit
PEP Alpha andAlpha Tubular Steel Prop
MAXIMOBracket
MAXIMOMX 18 Tie Technology
SKYDECKHandrail Unit
PEP Ergo Slab PropFor use up to Load Class E
LPSScreen
SCS Single-SidedClimbing System
VARIOKIT Balance Cantilever Equipment
VARIOKITHeavy-Duty Truss Girder
Brackets for LGSWeather Protection Roof
ULS FlexLattice Girder
1969 - 1979 1995 - 20041980 - 1994 2013 - 20142005 - 2012 2015 - 2016
Our engineers take into consideration the total cost of materials and working hours in every product development - we call this the “performance price”. Result: the greatest possible reduction in effort and working time.
PERI products are characterized throughtheir innovative design, intelligent mechanical features and practical details – manufactured with high quality standards and thus ideally suited for dealing with the tough everyday use on the construction site. Easy handling, maximum flexibility and, at the same time, safe application prove convincingin the long-term.
PERIProducts and Systems
A clear indicator of this is that we havealways been able to set standards in theindustry with numerous innovations, and that the vast majority of PERI systems have firmly established themselves in the market.
12
PERI Asia Milestones
First Formwork system introduced and usedin Singapore ever
IBMTowers(renamedFujiXeroxTowers)
HawaiiTower
Downtown Line917 at SAV & KAP Station,918 TKK andCut and Cover Tunnel
Singapore ChineseCultural Centre (SCCC)
Sedona Hotel(Myanmar)
JTC ChemicalsHub at Tuas View
Ho Chi MinhMetro Line 1(Vietnam)
DUO MixedDevelopment
Sims UrbanOasis
School of the Arts (SOTA)
Kranji Tunnel Midview Cityat Bright Hill Drive
Asia SquareTower 1
HyfluxInnovationCentre
Anderson 18Condominium
AltezCondominium
Jacky Cheung½ CenturyConcertScaffolding
d’leedonCondominium
Parc EmilyCondominium
KallangPaya LebarExpresswayC423
1982
20152010
Expansionto Vietnam
Expansionto Hong Kong,Philippines
Expansionto Myanmar
2007
Renamingto PERI AsiaPte Ltd
IntroductionPERI Formwork
2013
Opening PERICustomer Centre
2016
25 YearsSuccessfulConstruction
HonoluluTower
Far EastPlaza
Golden LandmarkHotel renamed Village Hotel Bugis
The Azura(Vietnam)
Keppel Seghers TuasWaste to Energy Plant
Rolls-RoyceSeletar Campus& EngineTest Facility
Tampines TownHub at TampinesAve 4 & 5
JunctionCity (Myanmar)
EonShenton Way
Skysuitesat Anson
ResortWorldSentosa
InternationalCruise Terminal
Crystal Pavilionsat Marina Bay Sands
Marina OneMixed Development
Festive Mall(Philippines)
SingaporeSports Hub
FusionopolisPhase 2A Tower C
Various CircleLine MRT Stations
Marina BaySands
HotelCapella
GermanEuropeanSchoolSingapore
Springleaf MRTStation TEL T208
RobinsonTower
Opening RDCin Indonesia
1991
FormationPERI in Singapore
13
Continous growth. Considerable projects.
First Formwork system introduced and usedin Singapore ever
IBMTowers(renamedFujiXeroxTowers)
HawaiiTower
Downtown Line917 at SAV & KAP Station,918 TKK andCut and Cover Tunnel
Singapore ChineseCultural Centre (SCCC)
Sedona Hotel(Myanmar)
JTC ChemicalsHub at Tuas View
Ho Chi MinhMetro Line 1(Vietnam)
DUO MixedDevelopment
Sims UrbanOasis
School of the Arts (SOTA)
Kranji Tunnel Midview Cityat Bright Hill Drive
Asia SquareTower 1
HyfluxInnovationCentre
Anderson 18Condominium
AltezCondominium
Jacky Cheung½ CenturyConcertScaffolding
d’leedonCondominium
Parc EmilyCondominium
KallangPaya LebarExpresswayC423
1982
20152010
Expansionto Vietnam
Expansionto Hong Kong,Philippines
Expansionto Myanmar
2007
Renamingto PERI AsiaPte Ltd
IntroductionPERI Formwork
2013
Opening PERICustomer Centre
2016
25 YearsSuccessfulConstruction
HonoluluTower
Far EastPlaza
Golden LandmarkHotel renamed Village Hotel Bugis
The Azura(Vietnam)
Keppel Seghers TuasWaste to Energy Plant
Rolls-RoyceSeletar Campus& EngineTest Facility
Tampines TownHub at TampinesAve 4 & 5
JunctionCity (Myanmar)
EonShenton Way
Skysuitesat Anson
ResortWorldSentosa
InternationalCruise Terminal
Crystal Pavilionsat Marina Bay Sands
Marina OneMixed Development
Festive Mall(Philippines)
SingaporeSports Hub
FusionopolisPhase 2A Tower C
Various CircleLine MRT Stations
Marina BaySands
HotelCapella
GermanEuropeanSchoolSingapore
Springleaf MRTStation TEL T208
RobinsonTower
Opening RDCin Indonesia
1991
FormationPERI in Singapore
14
PERI AsiaEmerging Markets
PERI Hong Kong | Harbour Area Treatment Scheme The project, which is expected to serve about five million people, is primarily aimed at improving the water quality of Victoria Harbour in Hong Kong for marine life.
PERI Philippines | Amaia Esperanza Pasig This project will define an elevated expectation for safety standards coupled with formwork production and sets the standards for construction expectations in Manila.
PERI Myanmar | Sedona Hotel YangonThe phase 2 development of this 5 Star hotel, a 29 storey tall tower, accommodates 420 rooms. It is one of the tallest structures in Yangon.
PERI Vietnam | Ho Chi Minh Metro Line 1: Ben Thanh – Suoi Tien The line starts at the famous Ben Thanh Market in the central District 1 and ends at Suoi Tien Cultural Park with a length of 19.7km and 14 stations. The introduction of this metro line will see the central districts of HCMC linked directly with the eastern parts of the city.
Myanmar
Vietnam
Hong Kong
Philippines
Headed by the Market Unit Asia Pacific (MU APAC) and centrally located in Singapore, PERI evaluates opportunities abroad and provides the necessary support via PERI Asia to successfully enter into emerging markets.
To guarantee the best performance and services to our customers, skilled and well equipped PERI staff is relocated
We at PERI believe in the future of Asian markets
to designated locations in the region to directly cater to our customers needs.
In recent years subsidiaries have been established in Hong Kong and the Philippines.
PERI Asia currently carries out projects in Myanmar and Vietnam to expand our presence in the region.
15
PERI AsiaMore than just products
Due to our engineers’ in-depth understanding of the needs of our customers, they are able to develop the best project-related solutions for them. These services include, if requi-red, static calculations as well as assembly plans for special formwork. Although 90 % of the formwork project require-ments can be covered using standard equipment from the broad PERI product range, a special construction is, how-ever, sometimes more cost-effective and it is exactly here that the engineers apply their expertise with great effect.
Technical solutions
The broad range of PERI equipment and systems offer the perfect solution for every requirement. However, the PERI range of services goes far beyond production and system equipment sales and rental.
PERI has the world’s largest rental equipment pool that supplies its customers reliably, fast and with a high level of flexibility. “Just in time” deliveries and return deliveries – according to the particular construction schedule.
For very large material requirements, the local team works closely with other logistics locations thus ensuring an optimal delivery service to the construction sites.
Logistics
PERI formwork instructors provide an extensive profes-sional on-site briefing. This means that any improper handling can be avoided and the risk of accidents are greatly reduced. Using the systems even more efficiently accelerates the construction progress.
On-site support
Our training programme includes both seminars with specified content and individualised courses. In doing so, we support our customers by enabling them to find out about the latest formwork and scaffolding technologies for more efficiency, and to be able to pass on this knowledge.
Customer Training
16
PERI Asia | Reference Projects
17
18 Civil Engineering
20 Commercial and Residential Buildings
22 Institutional Buildings
24 Industrial Buildings
18
PERI AsiaCivil Engineering
2002 Kranji Tunnel
2003 Fort Canning Cut & Cover Tunnel
2004 Kallang Paya Lebar Expressway C423
2004 MacPherson, Tai Seng MRT Stations and Tunnel – CCL C822 Stage 2
2004 Sungei Pandan Pipejack Cable Tunnel
2005 Bartley MRT Station – CCL C851A Stage 3
2005 Open Outlet Drain at Tuas View Extension
2005 Ulu Pandan NEWater Factory
2008 Common Service Tunnel
2008 Dakota MRT Station – CCL C823
2008 Mountbattan MRT Station – CCL C823
2008 Bugis MRT Station – DTL C903 Stage 1
2008 Paya Lebar MRT Station – CCL C823
2009 Bukit Panjang MRT Station – DTL 912
2009 Slip Road Widening from SLE to BKE
2010 International Cruise Terminal, Singapore
2010 Sixth Avenue MRT Station – DTL 917
2013 MacPherson MRT Station – DTL C931 Stage 3
2015 Springleaf MRT Station TEL T208
2002 Kranji Tunnel
2009 Bukit Panjang MRT Station – DTL 912
2008 Bugis MRT Station – DTL C903 Stage 1
2009 Slip Road Widening from SLE to BKE
2004 Kallang Paya Lebar Expressway C423
2010 International Cruise Terminal, Singapore
19
2010 Sixth Avenue MRT Station – DTL 917 2013 MacPherson MRT Station - DTL C931 Stage 3
2004 Sungei Pandan Pipejack Cable Tunnel 2005 Open Outlet Drain at Tuas View Extension 2005 Bartley MRT Station – CCL C851A Stage 3
20
PERI AsiaCommercial and Residential Buildings
2007 Marina Bay Sands
2014 DUO Mixed Development
2010 Altez Condominium2010 Resort World Sentosa
2013 CapitaGreen Office Building 2013 Oasia Downtown
2007 Sky at Eleven Condominium
2010 Asia Square Tower 2
21
1982 Far East Plaza
1984 Honolulu Tower
1985 IBM Towers (renamed Fuji Xerox Tower)
1986 Golden Landmark Hotel (renamed Village Hotel Bugis)
2006 Crowne Plaza at Terminal 3
2006 Hotel Capella
2007 Marina Bay Financial Centre Tower 1
2007 Marina Bay Sands
2007 Sky at Eleven Condomonium
2009 Asia Square Tower 1
2009 Marina Bay Financial Centre Tower 2
2009 Ocean Financial Centre
2010 Altez Condominium
2010 Asia Square Tower 2
2010 Marina Bay Suites
2010 Resort World Sentosa
2011 d'Leedon Condominium
2011 Holiday Inn Express Hotel
2011 Le Nouvel Ardmore and Nouvel 18
2011 Parkroyal Hotel at Upper Pickering Street
2011 Skysuites at Anson
2013 CapitaGreen Office Building
2013 Oasia Downtown
2014 SBF Tower
2014 DUO Mixed Development
2014 Marina One Mixed Development
2009 Asia Square Tower 1
2014 Marina One Mixed Development
2011 Le Nouvel Ardmore2011 d'Leedon Condominium
2009 Marina Bay Financial Centre Tower 2
22
PERI AsiaInstitutional Buildings
2007 Duke-NUS Graduate Medical School
2007 Upgrading of Dunman High School
2008 Anglo Chinese School (Junior) Sports Hall
2008 Cedar’s Girls Secondary School Upgrading
2008 Marina Bay Sands Theatres
2008 School of the Arts (SOTA)
2008 Tampines Primary & Secondary School
2009 Assumption Pathway School Upgrading
2009 Crystal Pavilions at Marina Bay Sands
2009 NUS CREATE Campus
2009 United World College of South East Asia
2010 School of Science and Technology
2012 Singapore Sports Hub
2013 Changi Prison
2013 Stamford American International School
2014 JTC Aviation 2
2014 Tampines Town Hub at Tampines Ave 4 & 5
2014 Temasek Club House at Rifle Range Road
2015 Catholic Church at Punggol
2015 JTC Chemicals Hub at Tuas View
2015 Singapore Chinese Cultural Centre (SCCC)
2009 Crystal Pavilions at Marina Bay Sands
2008 Marina Bay Sands Theatres
2012 Singapore Sports Hub
2008 Tampines Primary & Secondary School
2009 United World College of South East Asia
23
2008 Cedar’s Girls Secondary School Upgrading
2009 Assumption Pathway School Upgrading 2010 School of Science and Technology 2010 NUS Staff House
2015 Singapore Chinese Cultural Centre (SCCC)
2008 Marina Bay Sands Theatres
2013 Stamford American International School
24
PERI AsiaIndustrial Buildings
2012 8 Storey Factory at Sunview Way
2010 Hyflux Innovation Centre
2014 PRIMAX at 22 New Industrial Road
2009 Sheng Siong Supermarket Warehouse & Office
2013 Ecotech at Sunview2012 Fusionopolis Phase 2A Tower C
2008 SingTel Data Centre
2012 NTUC Distribution Centre
25
2006 Hitachi Warehouse
2006 Samsung Siltronic Water Hub at Tampines
2008 SingTel Data Centre
2009 Midview City at Bright Hill Drive
2009 Sheng Siong Supermarket Warehouse and Office
2010 Hyflux Innovation Centre
2010 Rolls-Royce Engine Test Facility
2010 Rolls-Royce Seletar Campus
2011 Woodlands 11 Factory 2011 Yang Kee Logistics Warehouse
2012 6 Storey Warehouse at Banyan Avenue –Jurong Island
2012 8 Storey Factory at Sunview Way
2012 Fusionopolis Phase 2A Tower C
2012 Hafary Centre at Eunos Ave 3
2012 NTUC Distribution Centre
2012 Warehouse for LTH Logistics at Banyan Drive
2013 Bartley Biz Centre
2013 Ecotech at Sunview
2013 Factory at 970 and 998 Toa Payoh North
2014 Design & Build Factory at 42 Penjuru Road
2014 PRIMAX at 22 New Industrial Road
2014 Warehouse at Greenwich Drive
2014 Warehouse Greenwich Drive
2010 Rolls-Royce Engine Test Facility
2011 Woodlands 11 Factory
2010 Rolls-Royce Seletar Campus
2011 Warehouse for Yang Kee Logistics
26
PERI CaresSocial commitments
RDA
Children's Cancer Foundation
SCAL
The Singapore Contractors Association (SCAL) held its Annual Charity Golf Tournament on 30 July 2014 with the Minister for Manpower, Mr. Tan Chuan-Jin as this year’s sporting Guest-of-Honour.
This year the charity event supported the NKF (National Kidney Foundation), a public funded charitable organisation, which is the largest dialysis provider supporting more than 3,200 patients.
Every day, an average of four people will lose the use of their kidneys in
Singapore. On average an NKF patient must cope with an annual bill of $20k for their treament. NKF requires more than 70 million this year to subsidise their patients to pay either $50 SGD or less a month, or nothing at all.
PERI Asia took part in the RDA Charity Golf Day for the Riding for the Disabled Association (RDA) of Singapore. The event raised more than S$176,000. A total of 15 teams (golf flights) took part in the golf event and another 18 companies joined in for the dinner to wrap up the eventful day.
The Riding for the Disabled Association of Singapore (RDA Singapore) provides free horse riding therapy to children and adults with disabilities from all over Singapore.
Founded in 1992, Children’s Cancer Foundation (CCF) is a non-profit organisation with a mission to improve the quality of life for children with cancer and their families through enhancing their emotional, social and medical well-being. Over the years, CCF has helped more than 2700 children and their families at different stages of the illness.
CCF is solely funded by public and corporate donations. For every shirt sold, PERI donated 100% of the gross proceeds to CCF. The donations raised will facilitate the continued provision and improvement of various programmes and services for CCF's beneficiaries and their families.
Helping hands for Tacloban
On 7th November typhoon Haiyan hit the Philippines, killing at least 6069 people. Nearly all structures in the town of Tacloban suffered at least partial damage. Many people were left homeless. Almost 90 percent of the city was destroyed. Upon hearing about the typhoon our colleagues were very eager to help and donated clothes and dry food as well as the coordination of the donation to the Philippines.
assionngagementeliabilitynnovation
PERI Asia Pte LtdFormwork Scaffolding EngineeringNo.1 Sims Lane # 04-11Singapore 387355Phone +65 67 44 29 89Fax +65 67 44 36 [email protected]
www.linkedin.com/company/peri