Building facts

•Prime location NH8

•Green Building

•Fresh air throughout the building thru the ventilation units attached to the AC’s , cross air ventilated building

•Power backup

•Four side open building

• Terrace anti aircraft light

•CCTV Cameras at prime locations

•The flooring carpets are anti static carpets

• Plantation

• Glass Mosaic tiles

• Safety glass all through the building

Page 3: Building

Ground Floor

Page 4: Building

GROUND floor

• 3 Cabins

• 2 Training Rooms

• 1 CCTV Room

• 1 Production Hall

• 3 Washrooms

• 1 Cafeteria

Page 5: Building

Ground floor Total AC Unit Capacity : 70 tons

Reception:5.5 Tons : Voltas

Cafeteria :27 Tons : Carrier and LG

Training Center :9.5 Tons : Carrier

Production Area and Storage Area : 22 Tons : Blue

Star

Individual Units : 6 Tons : Carrier and Samsung

PANELS

• 2 Fire Hydrant stations

1 Notifier Fire control panel

1 Ground Floor Panel 400 Amperes

Page 6: Building

First floor

• 13 Cabin

• 26 Cubical

• 188 Workstation

• 5 Meeting Room

• 2 Server Room

• 3 Washrooms

Page 7: Building

First floor

AC Units

•Total AC packaged unit : 68 Tonnes : Voltas

• Individual AC units : 12 Tonnes :Diakin

Panels :

• 2 Fire hydrant station

• 1 First floor panel 200 amperes

Page 8: Building

Second floor

• 22 Cabins

• 35 Cubicals

• 144 Workstation

• 3 Meeting Room

• 1 Server Room

• 3 Washrooms

Page 9: Building

Second Floor

AC Units ;

•Total Package Unit : 66 Tons : Voltas

• Individual Units : 24.5 Tons: Carrier /Diakin

Panels

• 2 fire hydrant station

•MDB UPS panel 125 ampere

•Server room control UPS panel 125 ampere

• Research and development panel 100 ampere

Page 10: Building

THIRD FLOOR

•21 Cabins

• 31 Cubicles

• 60 Workstations

• 1 Meeting Room

• 1 Board Room

• 1 Auditorium

• 1 Server Room

•1 Pantry Directors Area

• 3 Washrooms

• 2 Director Washroom

Page 11: Building

Third Floor

AC Units :

•Total Package Unit : 68 tons : Voltas

• Individual Units : 23.5 Tons : Diakin /Carrier/Toshiba

Panels :

• 2 Fire hydrant station

•Third floor UPS panel :125 ampere

•Electrical panel : 200 amperes

•Lighting Panel : 125 Amperes

Page 12: Building

Terrace

Panels :

• 2 Cooling Towers : 165 TR : Case /Asian

• 1 Cooling Tower Pump Room

• 1 Lift room

• 2 Fresh Air Unit

• 2 Exhaust fan unit

Page 13: Building

Outer AREa ( GF )

Panels :

•HT Meter Room

•HT Panel Rooms

•STP Plant : 50 KLD

•Isolator Panel: 2000 AMPERE

•POLE LIGHTS 39

•RAMP SHUTTERS -2

•PUMP ROOM

•DG SETS

•DIESEL TANK YARD :40000 KLD

Page 14: Building

Basement •LT PANEL -1 (2000 KVA)

• VENTILATION PANEL -1(250 AMPERE)

• NEW UPS PANEL -1 (100 AMPERE)

• UPS BYPASS CHANGEOVER PANEL -5 (100 AMPERE EACH )

• AC PANE L-1(630 AMPERE)

• ADDITIONAL AC PANEL – 1(250 AMPERE )

• UNIVERSAL TRANSFORMER CONTROL PANEL(RTCC )

• CAPACITOR PANEL -1 (400 AMPERES )

• BLOWER-2(18.5 KW AND 7.5KW)

• FIRE HYDRANT STATION -2

• APC UPS -4 (30 KVA ) WITH 32 BATTERIES EACH OF 65 AH

• APC UPS -3 (40 KVA ) WITH 64 BATTERIES EACH OF 26 AH