Mid-Term Review of the Africa RISING Project in the
Ethiopian Highlands
Barry Pound, Adugna Tolera and Harriet Matsaert
Africa RISING Project Mid-term Review Feedback
Workshop, Addis Ababa, 1 April 2015
Outline of presentation
Acknowledgements
Review process
Observations
Preliminary findings
Achievements/strengths of the project
Areas for strengthening
Areas for further considerations
Next steps
Review Process
Meetings with the project coordination team
Meetings and interviews with CG partners
Skypes with USAID and IFPRI Visits to Lemo and
Endamehoni Woredaso Meetings with Woreda-
level IPso Field visits to 4 kebeles
Observations – hitting a moving target
Change in project ‘framework’ – changes from hypotheses + outputs to components to themes…
… and from a farm focus to inclusion of wider scale issues…
… and from a wheat system to a more inclusive mandate.
Similarly, draft scaling plan still at draft stage, and not clear where the project role stops.
Project design
People like the flexibility of the design
There is a high level of ownership; some CG Centres (e.g. ICRAF, ICARDA) were involved in the design with ILRI at an early stage of the project
Note: communication needs to be very good for every one if you want to have a flexible design
Research and Management Approaches
Strengths of the research approach are:
Holistic
Multi-institutional/multidisciplinary
Participatory
project ethos of sharing and collaborating
Flexibility & adaptive management makes project responsive and able to meet opportunities and challenges + facilitate partnerships + integration of systems components (crops, livestock, natural resources) in a systems approach
Output 1 – Situation analysis and program-wide
synthesis
Large amount of qualitative and quantitative data collected on the project sites (including socioeconomic, natural resources, institutional).
Quick wins gave on the ground experience and create links to local partners.
Recognition of heterogeneity – technical & social studies
Output 2 – Integrated systems improvement
Project looks at commodities and landscape level and plans to work at the macro level through the sustainability indicators and monitoring.
Collaborative protocols development (CG and local partners).
Demand driven and wide range of relevant options being tested. Farmers enthusiastic about the options.
Sufficient budget
Protocol on soil and water management links household to landscape level interventions.
Participatory approach in a multi-disciplinary and multi-institutional setting
Output 2 (continued)
CIP, CIMMYT and ICARDA collaboration for trial management.
IPs play active role in coordinating and supporting the research.
Includes some original work – (e.g. analysis of landscape scale production against hh nutrition requirements)
Some work is relevant to influencing govt policy (e.g. fertiliserrates according to soil response in highly variable environments)
Inclusion of nutrition/post-harvest in response to recognition of these as gaps
Positive response to some of the technologies after the first season and some initial scaling (where there is community based seed production in particular).
Output 3 – Scaling and delivery of integrated innovation
IPs and FRGs have an important role to play in scaling.
Interest shown by regional, zonal, woreda and kebele level government officials.
Draft scaling plan has been created. Starting the process of thinking about Africa Rising’s role in scaling.
Value chain studies have provided information that will be useful in scaling process.
Involving development partners e.g GRAD is facilitating initial scaling.
Gender and Diversity
Project recognises the importance of, and has put resources into gender analysis.
PCA disaggregated results between youth, women and men and further research is ongoing to look at constraints to women’s participation.
Gender action plan, Gender training and creation of Gender champions at IP level.
Data Management
Good data sharing between partners
Plan for data repository which potentially enables meta analysis.
Human Resources
Wide range of skills and expertise in the partnership
Partnership with local research centers and university staff
Use of consultants and students to fill gaps (but not too many)
Building capacity of local partners by supporting MSc and PhD studies (and in future writing joint peer reviewed papers).
Monitoring and Evaluation
Baseline surveys (IFPRI, PCA, AKT5, etc)
IPs are monitoring their activities and have appointed M& E champions.
At project level, monthly meetings play role in monitoring and guiding adaptive management.
Communication
Well budgeted for and importance appreciated by the project.
Electronic communication much appreciated (especially yammer).
Extensive documentation of the process at program and project level.
Have already put thought into the use of communication for scaling (including partnerships with innovative communication mechanisms e.g Digital Green and Shamba shape up).
Partnerships
Very strong and positive partnerships within CGIAR & with local partners (Woreda Office of Agriculture and research centers, universities).
Beginning to develop partnerships for scaling, for example:
Support from zonal and regional agricultural office is beginning (Tigray).
Working together with government campaign on sustainable land management protocol.
Work with cooperative in Endamehoni and starting in Lemo.
Lack of a clear framework for the project and its partners to follow has led to some challenges:-
Lack of clarity on roles and goals.
Reduced efficiency.
Some duplication and lack of integration in survey design.
21
1. Project Design and Management Structure
Areas for Strengthening 2
Output 1
Lateness of some key products which should guide Output 2. Data should be made available asap.
Programme level work on sustainable indicators is needed urgently.
Overloading of farmers?
More understanding of trends to supplement ‘snapshot’ of current systems.
22
Areas for Strengthening 3
Output 2Broaden analysis to look at sustainable intensification at the whole farm level (linking the different components at household level).
Include landscape/watershed level features of the system e.gwater budgets to guide thinking and action on sustainable intensification.
Participation of women in FRGs and IPs still lower than targeted (participation of young people, households in less accessible areas?)
Some research gaps identified by farmers and researchers.
Make trial plots size meaningful (forage trials).23
Areas for Strengthening 4
Output 3
Due to delay of key milestones, significant scaling unlikely to be achieved in phase 1.
Project needs to start identifying and engaging partners with skills, resources and networks to enable scaling.
Project should keep track of formal and informal dissemination (example seed potatoes) to understand the mechanisms and destination of scaling.
24
Areas for Strengthening 5
Gender and DiversityBroaden focus of gender work to include attention to range of household types, individuals and excluded groups.
Use typologies derived from output 1 activity to ensure inclusion of all typologies and monitor participation and adoption.
25
Areas for Strengthening 6
Data management issues
Different formats, programmes and approaches etc. may mean data sets are not compatible (could present a problem for meta analysis).
26
Areas for Strengthening 7
Human resource management
Site coordinator overloaded by multiple protocols and attitude of some partners, small financial float and time taken to do and replenish accounts. Accountancy support and better planning could help.
Local expertise is essential for trial management.
M&E staff needed who are answerable to project management and who attend planning and partnership meetings
Additional expertise and networking to support scaling required (discussed under Output 3).
27
Areas for Strengthening 8
Monitoring and Evaluation
Late collection of baseline data
No evidence of monitoring plan
No collection of data by IFPRI for over-arching project level monitoring (Outcomes) to guide project management.
No evidence of IFPRI staff apart from the baselineNo country M&E person appointed as was envisaged
Funding for M&E as separate contract – is not integrated
28
Areas for Strengthening 10
Communication
Suggest hard copy updates e.g. quarterly newsletters for sharing with Local partners and stakeholders.
Financial Management
Slow disbursement from ILRI financial office has been a problem for some protocols - evidence from ICRISAT, CIAT and both site coordinators interviewed.
29
Areas for further consideration - 1
How to keep the benefits of flexible design, while addressing its shortcomings
How to move towards whole farm integration
Getting the balance right between broad & iterative research and farmer support, and not overloading or “changing” farmers
Think about appropriate scaling research methods and partners, including mapping and quantification of scaling, and investigating scaling processes
30
Areas for further consideration - 2
Consider diversity in planning, monitoring & scaling of technologies – need to develop different technologies for different social groups within the community
Data collection – M&E info – what, what for, when, who to collect, how to share and use
How do VCs fit into the TOC, and into research and scaling activities and partnerships?
31
Areas for further consideration - 3
Does the AR Programme “add value” commensurate with costs, c.f. interaction with CPRs and other SI initiatives
What is the future of the IPs? What is AR’s role?
32
Next steps
Development of preliminary recommendations (Thursday am)
Feedback to Project team (Thursday pm)
Draft report to project partners for comment (by end April 2015)
Final report, May 2015
33
DISCUSSION QUESTIONS FOR MIXED GROUPS
1. How do Value Chains fit into research and scaling activities and partnerships?
2. Think about mapping and quantification of scaling, and investigating scaling processes
3. How to move towards research into whole farm integration
35
Local partners Ethiopia
Academic institutions: Wachemo, Mekelle, Madawolabu, Debre Berhan and Hawassa universities; Maichew Agricultural College
Regional research organizations: Amhara Regional Agricultrural Research Institute, Southern Agricultural Research Institute, Tigray Agricultural
Research Institute, Oromia Agricultural Research Institute
Federal research organizations: Ethiopian Institute for Agricultural Research, Ethiopian Health and Nutrition Research Institute
Offices of Agriculture: Endamekoni (Tigray), Basona Worena (Amhara), Lemo (SNNRP) and Sinana (Oromia)
Agricultural Transformation Agency