Thank you for purchasing our aluminum mobile scaffold. Please find the User Manual Powerpoint Presentation here for your reference.
Citation preview
ALUMINIUM MOBILE SCAFFOLD TOWER USER MANUAL
Always inspect component before erecting the tower
Always inspect the tower before use
Ensure that the tower is upright
Ensure castors are locked
Ensure the ballast is correctly in place
Ensure that tower is leveled by adjusting the adjustable leg
Ensure all the castor are firmly sited on the ground, of not in the hanging position
Ensure stabilizers are fitted as specified in the assemble procedure
Ensure platforms are correctly located
Ensure all handrails are in place
Ensure toe boards are correctly fitted as described in the assembly procedure
ChecklistRefer to checklist before use each time
Ensure that the instruction guide has been read and understood by anyone using the equipment. If in doubt contact your supplier.
All components should be checked for damage. Do not use damaged or incompatible equipment. Make sure that you have the correct amount of components.
Ensure that the ground surface you are working on is firm and clear of obstructions
Be careful not to infringe on any local bylaws when erecting mobile towers in public places and that warning signs are in place where necessary by law.
Do not erect any tower where there is a risk of contact with unprotected cables, unguarded machinery, or harmful substances.
Safety Note Before Erection
Safety Note Erecting the tower
Always take into account ground conditions. On soft ground a suitable base must be provided.
Ensure that the tower is level and vertical
Ensure stabilizers and ballast are fitted correctly when needed
Ensure the tower is not overloaded and that working loads are adhered to
Ensure the stabilizer are tightened securely
Ensure all castor wheels are firmly sited on the ground by tightening the adjustable legs after the stabilizers are fitted
Do not jump onto platforms
Towers used outdoors shall, whenever possible, be secured to a building or other structure
Tower shall only be moved manually and only on firm level ground which is free from obstacles. Normal walking speed shall not be exceeded during relocation.
For linking tower or special application, always consult your supplier.
It is not permissible to attach and use hoisting arrangement on towers unless specification provided by design.
Safety Note
Safety Note Before Moving the Tower
Do not attempt to move the tower with any leg extended more than 100mm
Never attempt to move the tower with men or materials on it. Lift up the stabilizer from the ground surface in order to push the tower. Do not remove stabilizer while pushing the tower.
Always be aware of any overhead hazards and make sure that the route to be taken is level and there are no holes or other obstructions.
Make sure all castor wheels’ brakes are in release position
Push manually and at the base only
Safety Note After Moving the Tower
Re-lock Castor wheels and ensure that the tower is both vertically and horizontal aligned
Reposition stabilizers and ensure they have safe footing
Where necessary, re-tie the towers to a rigid structure
Do not suspend mobile access towers without referring to your supplier
A tower must be kept in good working order. Any parts found to be faulty or missing should be immediately replaced.
Safety Note Dismantling the Tower
Keep to the instructions in this guide
Never throw down any equipments from the tower
Always lower equipment down to ground level by rope or hand
Always report damaged equipments. Equipments should be maintained in a serviceable condition.
Assembly Procedure(Step 1-11)
Step 1 Insert Adjustable Leg and Castor assembly into the bottom end of Normal and Ladder Side Frame
Step 2 •Clip the Horizontal Brace onto Normal Side Frame. Horizontal Brace are fitted upright from inside of the frame and not to the rung.
•Connect other end of brace onto Ladder Side Frame ensuring
ladder is on correct side to align with platform hatch.
Step 3 •Clip the Diagonal Brace to the rung and fitted opposite direction from each Diagonal Brace.
•Install one Platform on the third rung of frame as a Working Platform. Slide the second section of frames onto protruding spigots if needed to reach desired height.
•Ensure that the ladders run directly above each other making a continuous ladder run.
Step 4 •Fix Stabilizer and Ballast before height limit is exceeded
Step 5
•Connect/Slot the frame onto protruding spigots to reach another height, ensure that the ladder run directly above each other to make a continuous ladder run
•Install one more Hatch Platform on the fourth rung of the frame
Step 6 •Clip the Diagonal Braces on frame as shown
•Ensure that separate frames are always braced together. Also always ensure stabilizers are fixed before height limit is exceeded.
•Shift the Fixed Platform at the same level as the Hatch Platform
•Clip the Horizontal Braces as shown, as a handrail for access platform.
Step 7 •Shift the Hatch Platform to the fourth rung of the top frame
•Ensure that the platform is positioning over the ladder and the hatch are open to the ladder side
Step 8 •Slide Top Side Frames onto the spigots at the top of the previously fixed section and repeat on opposite side
Step 9 •Pass another Fixed Platform and install beside the Hatch Platform
Step 10 •Clip the Diagonal Braces in opposing direction to lock top frame to the frame below
•Clip Horizontal Braces on the top frame as a handrail
•Ensure the Platform is positioning over the ladder
Step 11 •Fit the Toe Boards
•Ensure that the Toe Boards are fitted properly
Tower Components
Double Width Ladder Side 4 Rung
Double Width Normal Side 4 Rung
Double Width Ladder Side 3 Rung
Double Width Normal Side 3 Rung
Double Width Ladder Side 2 Rung
Double Width Normal Side 2 Rung
Double Width Top Side
Single Width Ladder Side 4 Rung
Single Width Ladder Side 3 Rung
Single Width Ladder Side 2 Rung
Single Width Normal Side 4 Rung
Single Width Normal Side 3 Rung
Single Width Normal Side 2 Rung
Single Width Top Side
Horizontal & Diagonal Braces
Stabilizers
2.50m
4.25m
Stabilizers
6.0m
Ballast 20 KG (Comes with Handle)
Hatch Platform *Full Aluminum*
Fixed Platform *Full Aluminum*
Double Width Aluminum Toe Board
Single Width Aluminum Toe Board
Parallel Coupler
Swivel Coupler
Adjustable Castor Wheel
Fixed Base Plate Swivel Base Plate
Easy Access Ladder Easy Access Handrail
For Scaffolding Supplies and Services, please visit our website at