Upload
christopher-harold
View
346
Download
2
Embed Size (px)
Citation preview
Install Process andFinished Install
Photos
Removing Tack-strips and cleaning floor
Removing Baseboard or Quarter-round
Checking flatness of existing floor with Floor Float Tool
FFloor Floated – Low areas filled with Self Leveling, Fast Curing concrete Floor Float mix. Floors then scraped and vacuumed
Floor Floated – Low areas filled with Self Leveling, Fast Curing concrete Floor Float mix. Floors then scraped and vacuumed
Vapor Barrier and Sound Deadening Pad installed and floating floor being installed
Floor cutting tool
Transition
Installed Laminate
Photos
Example of a Bad LaminateJob from a Competitor.Notice “Peaking” edges and gaps
Installed Luxury
Vinyl Plank (LVP)
Photos
Installed Luxury
Vinyl Tile (LVT)
Photos
Installed
Ceramic/Porcelain
Tile Photos
Bad Tile JobNotice un-square tile and un-level floor
Installed Engineered Hardwood
Photos
Installed Carpet
Photos