Engineered Log Jams in the North and South Fork Nooksack

Lone Tree Phases I, II, and IIA

Kalsbeek, Todd and Sygitowicz Creeks, and Van Zandt

Victor Insera, Watershed Restoration Coordinator

Page 2: Insera  elj's on the nooksack victor insera

Why Engineered Log Jams?

Page 3: Insera  elj's on the nooksack victor insera

Why Engineered Log Jams?1. The South Fork Chinook population is

considered to have the highest extinction risk of the 22 Puget Sound populations.

Page 4: Insera  elj's on the nooksack victor insera

Why Engineered Log Jams?1. The South Fork Chinook population is

considered to have the highest extinction risk of the 22 Puget Sound populations.

2. Both Chinook populations have cultural importance and are essential for recovery.

Page 5: Insera  elj's on the nooksack victor insera

Why Engineered Log Jams?

3. Degraded habitat through in-stream wood removal and other detrimental factors over past 100 years.

1. The South Fork Chinook population is considered to have the highest extinction risk of the 22 Puget Sound populations.

2. Both Chinook populations have cultural importance and are essential for recovery.

Page 6: Insera  elj's on the nooksack victor insera

Why Engineered Log Jams?

3. Degraded habitat through in-stream wood removal and other detrimental factors over past 100 years.

4. Reduced wood recruitment from removal of large riparian trees throughout the watershed.

1. The South Fork Chinook population is considered to have the highest extinction risk of the 22 Puget Sound populations

2. Both Chinook populations have cultural importance and are essential for recovery.

Page 7: Insera  elj's on the nooksack victor insera

Project Goals and Objectives

Page 8: Insera  elj's on the nooksack victor insera

Project Goals and Objectives

1. Address the limiting factors affecting spawning and incubation in the North Fork and adult holding in the South Fork.

Page 9: Insera  elj's on the nooksack victor insera

Project Goals and Objectives

1. Address the limiting factors affecting spawning and incubation in the North Fork and adult holding in the South Fork.

2. Protect existing channel islands (North Fork).

Page 10: Insera  elj's on the nooksack victor insera

Project Goals and Objectives

1. Address the limiting factors affecting spawning and incubation in the North Fork and adult holding in the South Fork.

2. Protect existing channel islands (North Fork).

3. Enhance side channel habitat (North Fork).

Page 11: Insera  elj's on the nooksack victor insera

Project Goals and Objectives

1. Address the limiting factors affecting spawning and incubation in the North Fork and adult holding in the South Fork.

2. Protect existing channel islands (North Fork).

3. Enhance side channel habitat (North Fork).

4. Create scour pools with cover for cold water refugia (South Fork).

Page 12: Insera  elj's on the nooksack victor insera
Page 13: Insera  elj's on the nooksack victor insera
Page 14: Insera  elj's on the nooksack victor insera

Layout of Log Jams and Side Channel

Page 15: Insera  elj's on the nooksack victor insera

Tim Abbe (Entrix) Overseeing Placement of Uprights for Four-Sided Structure

Page 16: Insera  elj's on the nooksack victor insera

Construction of One-Sided Structure

Page 17: Insera  elj's on the nooksack victor insera
Page 18: Insera  elj's on the nooksack victor insera
Page 19: Insera  elj's on the nooksack victor insera
Page 20: Insera  elj's on the nooksack victor insera

October 2008 - Enhanced Side Channel

Page 21: Insera  elj's on the nooksack victor insera

Phase I

Phase II

Phase IIA

Page 22: Insera  elj's on the nooksack victor insera
Page 23: Insera  elj's on the nooksack victor insera
Page 24: Insera  elj's on the nooksack victor insera
Page 25: Insera  elj's on the nooksack victor insera
Page 26: Insera  elj's on the nooksack victor insera
Page 27: Insera  elj's on the nooksack victor insera

Staging Area August 2008(Peak Flow of 500 CFS)

Page 28: Insera  elj's on the nooksack victor insera

Staging Area November 2008(Peak Flow of 4000 CFS)

Page 29: Insera  elj's on the nooksack victor insera

Staging Area February 2009(Peak Flow of 220 CFS)

Page 30: Insera  elj's on the nooksack victor insera

Staging Area August 2009 Peak Flow (430 CFS)

Page 31: Insera  elj's on the nooksack victor insera
Page 32: Insera  elj's on the nooksack victor insera
Page 33: Insera  elj's on the nooksack victor insera
Page 34: Insera  elj's on the nooksack victor insera
Page 35: Insera  elj's on the nooksack victor insera

South Fork Nooksack River Valley

Issues

• Pool frequency is low, and existing pools are generally rip-rap formed and lack complex woody cover.

• Summer water temperatures regularly approach lethal limits for chinook.

• Riparian corridor is predominantly private agricultural property.

Restoration Approach

• Create scour pools with complex cover for adult holding and juvenile rearing.

• Increase availability of temperature refuges by promoting pool formation in areas of cool water influence.

• Provide immediate benefit while habitat-forming processes recover.

Page 36: Insera  elj's on the nooksack victor insera
Page 37: Insera  elj's on the nooksack victor insera
Page 38: Insera  elj's on the nooksack victor insera

Gus Kays (Herrera) & Treva Coe (NNR) Staking Pile Locations

Page 39: Insera  elj's on the nooksack victor insera
Page 40: Insera  elj's on the nooksack victor insera
Page 41: Insera  elj's on the nooksack victor insera
Page 42: Insera  elj's on the nooksack victor insera
Page 43: Insera  elj's on the nooksack victor insera
Page 44: Insera  elj's on the nooksack victor insera
Page 45: Insera  elj's on the nooksack victor insera

Enhanced Natural Jam Along Right Bank

Page 46: Insera  elj's on the nooksack victor insera

July 21, 2008

Page 47: Insera  elj's on the nooksack victor insera

July 31, 2008

Page 48: Insera  elj's on the nooksack victor insera

Nov 12, 2008Peak Flow 8,500 CFS

Page 49: Insera  elj's on the nooksack victor insera

Temperature Measurements along surface and bottom of South Fork along backwater reach associated with ELJ’s, July 17, 2009

Page 50: Insera  elj's on the nooksack victor insera

Sygitowicz Creek Reach

•Constructed 7 structures to promote pool development and increase wood cover near the confluence of Sygitowicz Creek.

•Removed over 100 feet of rip-rap.

Page 51: Insera  elj's on the nooksack victor insera

Van Zandt Reach

Constructed 14 structures to promote pool development and add wood cover.

Page 52: Insera  elj's on the nooksack victor insera

Kalsbeek Reach• Constructed 11 Structures to promote pool

development and increase wood cover while improving side channel connectivity

• Placed 14 3-log structures in side channel to improve instream habitat

Page 53: Insera  elj's on the nooksack victor insera
Page 54: Insera  elj's on the nooksack victor insera

Funding Provided By:

Salmon Recovery Funding Board

Pacific Salmon Commission

U.S. Fish and Wildlife Service

Environmental Protection Agency

Page 55: Insera  elj's on the nooksack victor insera

Lessons Learned

Page 56: Insera  elj's on the nooksack victor insera

Lessons LearnedDesigns need to be constructible and within budget and equipment capabilities.

Page 57: Insera  elj's on the nooksack victor insera

Lessons LearnedDesigns need to be constructible and within budget and equipment capabilities.

Important to have on site support from engineers to field fit designs.

Page 58: Insera  elj's on the nooksack victor insera

Lessons Learned

Important to have on site support from engineers to field fit designs.

Designs need to be constructible and within budget and equipment capabilities.

Plan storage areas for salvaged vegetation.

Page 59: Insera  elj's on the nooksack victor insera

Lessons LearnedDesigns need to be constructible and within budget and equipment capabilities.

Important to have on site support from engineers to field fit designs.

Plan storage areas for salvaged vegetation.

Be prepared with additional materials essential in construction process – slash, cable, logs.

Page 60: Insera  elj's on the nooksack victor insera

Continuing Challenges

Zero rise constraint (FEMA flood).

Creating designs that satisfy the expectations of funding agencies.

Building structures that promote habitat benefits while not increasing risks to landowners.

Finding landowners willing to provide access and support for salmon habitat restoration projects.

Page 61: Insera  elj's on the nooksack victor insera

Superstar Operator Harlan Harvey

Page 62: Insera  elj's on the nooksack victor insera

Acknowledgements

Tim Abbe, Arthur Flemming, and the team from Entrix

Gus Kays, Michael Spillane, and the team from Herrera

Nooksack Tribal Works including Mike Watson, Roy Nicol, Mike Ivie, Leo Redfox, Harlan Harvey, Kraig Harvey, and Vincent Cisneros

Nooksack Natural Resources Department including Jim Bura, Sindick Bura, Tom Cline, Treva Coe, Ned Currence, Llyn Doremus, Tim Hyatt, Gary MacWilliams, Michael Maudlin, Jenni Pelc, Loren Roberts, Russ Roberts, and Roman Swanaset

Special Thanks to Erica Capuana

And many others…