×
Log in
Upload File
Most Popular
Art & Photos
Automotive
Business
Career
Design
Education
Hi-Tech
+ Browse for More
The top documents tagged [beam line optics]
Documents
The Implementation of Top Up Operation at the Australian Synchrotron Light Source Don McGilvery
220 views
Documents
SPEAR 3 Beam Stability and Stabilization R. Hettel NSLS-II Stability Workshop April 18-20, 2007
226 views
Documents
The Backward Silicon Tracker 144 strip detectors (number of readout channels = 92.160) 48 pad detectors (number of trigger channels = 1536) Strip detector
220 views
Documents
The Implementation of Top Up Operation at the Australian Synchrotron Light Source
45 views
Documents
ALFA Results 2011 & Plans 2012 K.Hiller on behalf of the ALFA group
48 views