×
Log in
Upload File
Most Popular
Art & Photos
Automotive
Business
Career
Design
Education
Hi-Tech
+ Browse for More
The top documents tagged [beamline equipment]
Documents
OUTLINE Introduction LHC Injector complex Conclusion R. Garoby
215 views
Documents
R. Ostojic, WAMSDO, 19 May 2008 LHC Insertion Region Upgrade Phase I 1.Upgrade goals and milestones 2.Review of IR systems: main findings 3.The emerging
215 views
Documents
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What
212 views
Documents
PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel
215 views
Documents
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet
216 views
Documents
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion
217 views
Documents
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration
45 views
Documents
LHC IR Upgrade - Phase I
34 views
Documents
LHC Insertion Region Upgrade Phase I
26 views