×
Log in
Upload File
Most Popular
Art & Photos
Automotive
Business
Career
Design
Education
Hi-Tech
+ Browse for More
The top documents tagged [nominal intensity]
Documents
Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group
220 views
Documents
Evian 2012 : Session 3 - Beam Based Systems and Control: 2012 performance and 2014 outlook Delphine Jacquet on behalf of the operation team What we want
214 views
Documents
LHC Technical Committee, 07/03/2007 LHC Commissioning Phases Commissioning injection and first turn presented by B.Goddard Summary of considerable efforts
217 views
Documents
CNGS Operation Results 2008 Edda Gschwendtner AB/ATB on behalf of the CNGS team
222 views
Documents
Performance and Operational Experience of the CNGS Facility Edda GSCHWENDTNER, Dario AUTIERO, Karel CORNELIS, Ilias EFTHYMIOPOULOS, Alfredo FERRARI, Alberto
223 views
Documents
Name Event Date Name Event Date 1 SLHC Machine Plans We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6
218 views
Documents
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech
217 views
Documents
Report to the Collaboration India-CMS Meeting BARC, Mumbai 29 July 2010 A.Gurtu, TIFR
220 views
Documents
Overview of Machine Protection for the LHC 1 J. Wenninger CERN AB Department / Operations Group Experiments-Machine WS / June 07 With input from many colleagues
216 views
Documents
RWA, EPAC06 The LHC Collimation System R. Assmann, CERN/AB for the LHC Collimation Team EPAC 2006 Edinburgh
220 views
Documents
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook
224 views
Documents
Planned RF Upgrades in IR4 for the 2014/15 Shutdown
40 views
Next >