Upload
implementingagreements
View
733
Download
1
Embed Size (px)
DESCRIPTION
Elia Transmission System Operator for Electricity
Citation preview
Brussels, 06/12/2011 – Hubert Lemmens, Chief Innovation Officer
Implementing Agreement Day
206/12/2011
Unique situation in the EUOwnership
Elia
• 100% of 380-150kV network
• 94% of high voltage network (70-30kV)
50Hertz
• 100% of 380-220kV network
- 34% of the German 380kV network
- 19% owner of the German 220kV network
Age of networksElia
• Less than 10 years for 50% of underground cables
• Less than 20 years for 50% of lines & substations
50Hertz
• Around 10 years for 90% of the network (refurbished
after German reunification in 1989)
306/12/2011
Elia with 50Hertz = TOP 5 TSO in Europe
Critical mass to play a leading role in future developments
110 to 380 kV lines & cables 13,431km
30 to 70 kV lines & cables 4,800km
Number of substations 872
Area covered (km 2) c.143,000
Direct customers c.130
Residents covered >29 million
Employees (FTE) c.1,800
Regulated Asset Base (RAB) €5,097m
406/12/2011
Drivers for Innovation
• Elia grid in the center of Western Europe• Strongly meshed between large power systems of France and
Germany• Subject to loopflows between French nuclear plants and German
wind• Management driven positioning in Europe
• Strong Elia involvement in TSO cooperation• Phase Shifting Transformers on Belgian borders• Lead in European Wind Integration Study
506/12/2011
TSOs have to boost R&D
2010 2020
Businessneeds due tointegration of renewables
EWIS, etc.
20302000
European Electricity Grid Initiative (EEGI)
606/12/2011
European Strategic Energy Technology Plan
EEGI
European Electricity
Grid InitiativeBIO
EWI
FCH
SOLAR
NUCLEAR
Smart Cities
ccs
6
706/12/2011
EEGI
• One of the pillars of the SET plan
• Leading role by Elia
• Includes T and D topics
• 2 b€ to be invested in R&D during 2010 - 2018
• T-topics embedded in Entso-e R&D plan
• Accepted by EC and member states during SET plan conference in June 2010
• Reference program for R&D in grid related matters.
806/12/2011
Some achievements and ongoing
actions: a few examples
906/12/2011
European Wind Integration Study (EWIS)• Duration June 2007- April 2010 (34 months)
• An EC SmartGrids project (FP6)
• Competent Market Model Partner SUPWISciconsortium
• Close cooperation with external stakeholders:
• Network operators (TSOs and DSOs)
• Wind power producers and turbine developers
• Market participants
• Relevant studies and working groups on Wind integration
- TradeWind, IEA-Task 25, Greenpeace study, EC Working group for Offshore/ onshore grid development, EWEA WG Grid Codes, PLEF, Wind on the grid …
• Consumers
• Regulatory representatives
• National Governments and authorities…
UK & IrelandUK & Ireland
NorthernNorthern
BALTICBALTIC
CENTRAL EASTCENTRAL EAST
SOUTH WESTSOUTH WEST
SOUTH EASTSOUTH EAST
CENTRAL WESTCENTRAL WEST
CENTRAL SOUTHCENTRAL SOUTH
UK & IrelandUK & Ireland
NorthernNorthern
BALTICBALTIC
CENTRAL EASTCENTRAL EAST
SOUTH WESTSOUTH WEST
SOUTH EASTSOUTH EAST
CENTRAL WESTCENTRAL WEST
CENTRAL SOUTHCENTRAL SOUTH
1006/12/2011
Flexibility
• 3 phase shifters in the Van Eyck & Zandvliet HV station
� Improved control of neighbouring energy flows on the Elia grid for an improved reliability
� Optimisation of transmission capacity with interconnected networks
� The next step is to coordinate the operation of power flow devices taking into new regulatory issues
1106/12/2011
Cross border Coordination
CORESO : Regional Coordination Service Center (RTE, ELIA, National Grid, 50 HzT, Terna)www.coreso.eu
• Re-optimizing power grid
(max SoS & transm cap)
• operational safety of the system,
• massive integration of renewable
(wind energy)
• development of the electricity market
in the Central-Western Europe (CWE)
1206/12/2011
Enhanced overhead lines using the same right of way
150kV line (approx 600 MVA) versus “insulated arms” 38 0kV line ( up to 5000 MVA)
1306/12/2011
TWENTIES - Flexgrid
GOAL: Better integration of renewables
More stable and flexible grid
KUL: Optimal
Power flow
Control devices
ULB: WAMS
StabilityMargins
Help establish Good
Operating Practices
Ampacimon
PMU
ULg: Dynamic
Line Rating
1406/12/2011
On-going R&D projects with EC support
• 7MW-WEC-by-11 Estinnes (WindVision, Enercon, Sarens, ELIA, ENECO, 3E, K.U. Leuven, TSO Cyprus, EAC
- Ancillary Services delivery (Voltage control and SecundaryControl)
• OPTIMATE (Elia, ENBW TNG, REE, RTE, 50 HzT)
- A simulation platform to analyze electricity market design options involving transmission constraints, results by end 2012
• Ecogrid (SINTEF, Energinet.dk, Ostkraft, DTU-CET, Elia, Eandis, Siemens, IBM Research, Labein, AIT, ECN, UoT, EnCT)
- A Smart Grid prototype for the Future
1506/12/2011
Conclusions
• Fight against climat change pose important challenges on Electricity System
• Transmission System Operators play a central role in the change
• Elia Group is willing to contribute
• Availability of human resources is crucial
• We welcome international cooperation.
1606/12/2011
Vielen Dank für Ihre Aufmerksamkeit.
Thank you !
Question time