Controle de Tráfego Aéreo Brasileiro | Brazilian Air Traffic Control
Citation preview
BrazilianBrazilianAir Traffic Control Air Traffic Control
SummarySummary
• Inside DECEA
• Projectsj
DECEADECEA
• Air Force Agency
• Air Navigation Regulator• Air Navigation Regulator
DECEADECEA
MissionMissionTo plan, manage, andTo plan, manage, and
control activities related to airnavigation safety, airspacecontrol, and aeronauticaltelecommunicationstelecommunications.
DECEA• Services
- ATM, AIS, COM, MET, SAR
- Cartography, Flight InspectionCartography, Flight Inspection
5 ACC 47 APP 58 TWR• 5 ACC, 47 APP, 58 TWR
AREA OF RESPONSIBILITY – 22,000,000 km2
CRUZEIRO do SUL (SBCZ) to RECIFE (SBRE) =CRUZEIRO do SUL (SBCZ) to RECIFE (SBRE) = 4,200 Km4,200 KmOIAPOQUE (SBOI) to BAGÉ (SBBG) =OIAPOQUE (SBOI) to BAGÉ (SBBG) = 3,900 Km3,900 Km
CASABLANCA to MOSCOW =CASABLANCA to MOSCOW = 4,150 Km4,150 KmDUBLIN to BEIRUT =DUBLIN to BEIRUT = 3,900 Km3,900 Km
TERMINAL AREA
21 RADAR
19 NON-RADAR
RADAR COVERAGE – FL 290
E i tEquipment
VOR 85 Visual Aid 185
DME 96
ILS 43
Meteorological Aid 188
M t l i l R d 17ILS 43
NDB 238
Meteorological Radar 17
Primary Radar 67NDB 238
V/UHF 4,660
Primary Radar 67
Secondary Radar 78y
O P l A il 2011Ops Personnel – April 2011
MILITARYCIVIL
TOTALDECEA INFRAER
OO
ATCO 3,265 247 606 4,118
COM 668 *** *** 668
OEA *** *** 360 360
MET 780 *** 395 1,175
AIS 447 37 220 704AIS 447 37 220 704
TOTAL 4,724 338 1,484 6,546
Slide 13
p1 MILITARES
Graduados no Sistema: 2750Graduados fora do Sistema: 126Graduados da Marinha e Exército: 127 (Marinha: 101; Exército: 26)
OFICIAIS CTA
QOE ESP: 100QOEA CTA: 162
TOTAL MILITARES: 3265
DECEA
Civis DACTA: 131Contratados para órgãos: 93Contratados Fundação: 6Contratados Tarefa: 17
TOTAL CIVIS DECEA: 247
INFRAERO
Profissionais de Tráfego Aéreo: 606
TOTAL: 4118pietroforterpc; 4/4/2011
ATCO Training ICEAATCO Training - ICEA
QUALIFICATIONAdvanced ATC SIMULATOR
(all scenarios)
2010QUALIFICATION - 230
REFRESHER - 752
ATCO Training EEARATCO Training - EEAR
TRAININGB i ATCBasic ATC
20102010273 ATCO
15
M tMovements
YEARFLIGHT RULE
TOTALIFR VFRIFR VFR
2007 1,780,651 936,812 2,717,463
2008 1,939,144 831,062 2,770,206
2009 1,995,580 896,059 2,891,639
2010 2 347 325 1 356 424 3 703 7492010 2,347,325 1,356,424 3,703,749
Brazilian Model
I t t d S tIntegrated System
Civil + MilitaryCivil + Military
Synthesis
BrazilianSoftware
ATC
Air DefenseBrazilian Software
Air Traffic ControlBrazilian Application
ATCComm Military
Comm
O C it tOur Commitment• Safety – SMS Implementation
Quality – ICAO SARPs
Performance – KPI ImplementationPerformance KPI Implementation
S f t O i htSafety OversightAIR FORCE AGENCY
Continuous Monitoring Approach
PROJECTSPROJECTS
StepsSteps
VFR Flights - (AIC N 05/10) Resectorization (JUN 2010)Resectorization - (JUN 2010)PBNSAGITARIO (AMAN) (2011)SAGITARIO (AMAN) - (2011)GRU CAT IIIHuman Resources
DOUBLE the São Paulo TMA capacity until 2012
PBNPBNEn route - SAM RNAV-5 Implementation - September 2011En route SAM RNAV 5 Implementation September 2011
Brazilian Plan to ICAO - December 2009
- RNAV SID and APV Baro - VNAV at main Brazilian Airports (100 procedures)
- 32 APV Baro-VNAV procedures implemented
- APV Baro-VNAV 20% of Runway Ends by December 2010
- RNP AR Santos Dumont
Brasília and Recife TMA: 08 APR 2010 - AIC 26/09
São Paulo and Rio TMA: 2013
N SAM ATS R t N t kNew SAM ATS Route Network
1st Version – 10 MAR 111 Version – 10 MAR 11
RNAV-5 - SEP 11 (AIC 06/11)
2nd Version – 2013
Harmonization + Optimization
ATFM CGNAATFM - CGNA
26
CGNACGNA
Stakeholders ForumImprove coordinationUp-to-date informationDecision levelDecision level
CDM
Flexible
Use of AirspaceUse of Airspace
CRUZEXCRUZEX
29
Fl ibl U f AiFlexible Use of AirspaceG l A i tiAirline Flight General Aviation
Military Aircraft
Military Aircraft
Military Aircraft
Military Aviation on Combat Training
N i tiNavigation
•Reference receivers• Reference receivers
•Reference receivers
?
• Reference receivers•
Y? VDBY VDB
GBAS (SLS 4000) Rio de JaneiroGBAS (SLS 4000) - Rio de Janeiro
F t A t T t (FAT) fi li dFactory Acceptance Test (FAT) finalized Installation - December 2010Site Acceptance Test (SAT) - April 2011Certification - Depends on the Ionosphere Analysis
Surveillance Su e a ce
ATLANTICO FIR - ADS-C/CPDLCATLANTICO FIR ADS C/CPDLC
RNP 10: Since October 2001RVSM: Since January 2002ADS C October 23 2008ADS-C: October 23, 2008ADS-C/CPDLC: May 09, 2009
ADS B C ti t lADS-B - Continental
Operational Concept (JAN 2011)
Benchmarking with Campos Basin ADS-B Implementation
Phased approach implementation
AIM BRAIM-BR
AIM BRAIM-BR
New Automatic AIP System – 2012New Automatic AIP System 2012
Database
Instrument Flight Procedures tool
Human Resources training