Regional sectorial planning. Goals set for the following sectors: water and sanitation,
waste management, energy efficiency
Modernization of Local Public Services in the Republic of
Moldova
Page 208/04/2023
Modernization of Local Public Services in the Republic of Moldova
• Project proposal based on results of bilateral Government negotiations
• Moldova-Germany 11/2009
• Duration of 6 years: 1/2010 – 12/2015
• Institutional Counterpart Ministry of Regional Development and Construction
• Initial Contribution of BMZ: 3 Mio. €
• Co-Financing by Romanian Government of 0.7 Mio. €
• Co-Financing by Swedish Government of 3.3 Mio €
• Additional funds commissioned by BMZ in 12/2012:
• 2 Mio € for project activities
• 10.9 Mio. € for investments
Moldova
Page 308/04/2023
Overall Project Objective
Improved Local Public Serviсes in selected villages and towns
in the Republic of Moldova
through
I Intervention Area
Investments in innovative technologies
Increased capacities and modernized management of service providers
Enhanced inter-municipal cooperation and local participation
II Intervention Area
Enhanced coordination between institutions on local, regional and central level by integrated
planning and programming of investments
Page 4
Scope of work Regional Planning and Programming
08/04/2023
Scenario A:
• Development of the Sectoral Development plans for water and sanitation (WSS), solid waste management (SWM), energy efficiency (EE) in public buildings, integration into the regional policy documents;
• Project pipeline of investment fiches in the above sectors (worth up to EUR 170 million);
• Capacity development of local and regional regional development (RD) actors.
Scenario B (when mandated):
• Regional operational plans also for local and regional roads;
• Developing the “viable project” concepts into “ready to finance project” concepts (incl. feasibility studies, environmental impact assessments, technical design docs, etc.);
• Pipeline of investment projects (in 4 sectors).
the Intervention Area (IA) 2 consultants introduced the idea of the Regional Sector Program (RSP) as a tool to support the development of a pipeline of
viable sector investment projects.
Page 5
Regional Planning and Programming
08/04/2023
The Regional Sector Program (RSP) is an operational tool which will be used to support the development of better investment projects in Moldova. The RSP:
• RSP Incorporates sector development needs, and complies with existing sectoral policies, practices and the relevant strategic framework;
• Extends the planning horizon set out by Regional Operation Plans (ROP) with a larger view on the sector development challenges;
• Defines the necessity of financial investments;
• Contributes to funded decision making about the need for financial resources for further projects development;
• Contributes to investment attract in the sectors (SWM, WSS, EE, Regional and Local Roads);
• Identifies possible project concepts (PPCs) that are to be considered for further development.
Page 608/04/2023
Sida
EU
Fiche (ToR)
Possible Project Concept (PPC)
Viable Project Concept (VPC)
“Ready -to -Go” Project (RGP) (final project) proposed for funding
Stages of Progression in Project Development
EU
Stages and donours
Page 708/04/2023
• PPC– project idea that is relevant and consistent with the regional plan;
• VPC– project idea which has been sufficiently developed that many of the features became very clear; stable understanding of the results/positive change the project can bring;
• RGP–final project proposal, not necessarily or only full feasibility study, but which has all the required documentation, tender docs, commitments, etc.
• Project Pipeline - a mechanism whereby a series of projects, and their promoters are assisted to progress their projects from conception towards readiness. Projects in the pipeline can have different degrees of readiness, qualities, speeds, but it is necessary to ensure that poor quality projects do not progress in the pipeline.
Key stages in project concepts identification and development, according to the RSP approach
Page 808/04/2023
Introduction: sector regional planning and programming, RSP as instrument, participatory approach to RSP development
Current sector status, legal, institutional frame, development of the RD’ vision on improved services,
The elaboration and discussion of scenarios, development of the sector architecture, facilitating Project concepts development
Regional Sector Programs drafting, consultation and approval, Project concepts development
Jan-March2013
April-June2013
July-Sept2013
Nov- Dec2012
SWM I
SWM II
EE I WSS I
SWM III
SWM IV EE II
WSS II
WSS III
• Regional Sector Working Groups (RSWG), of about 15 representatives of LPAs, public service providers, line ministries, specialized dis-concentrated institutions formed by the RDAs under the auspices of the MRDC in each sector, each region.
• RSPs developed by RSWGs through a series of WSs with the purpose to engage participants, draw on their experience and expertise, enable them to think and plan strategically, support them in analysis and practical solutions identification.
Regional Planning Working Groups- workshops
Page 9
15 PPC 10 projects 7 projects20 PPC
VPC
RGP
08/04/2023
• As a result of planning activities in 3 development regions, 4 sectors - SWM, EE of Public Buildings, WSS, regional local roads = a list of Viable Projects Concepts, based on project idea which has been sufficiently developed that many of the features became very clear; stable understanding of the results/positive change the project can bring;
• RGP– final project proposal, not necessarily or only full feasibility study, but which has all the required documentation, tender docs, commitments, etc.
About 60 projects worth up to EUR 170 million
Project Pipeline
Page 1008/04/2023
German Development Cooperation through GIZ
Chișinău, 31a Bulgară str.,
T + 373 22 22-83-19
F + 373 22 00-02-38
Internet: www.giz.de, www.serviciilocale.md
Welcome to invest.