GFSE 2007, 22.11.2007, Vienna Barriers to Energy Efficiency under CDM 22 November 2007, Vienna Binu K Parthan and Udo Bachhiesl REEEP and IEE, TU Graz

Barriers to Energy Efficiency under CDM

  • Upload
    reeep

  • View
    2.314

  • Download
    0

Embed Size (px)

DESCRIPTION

Barriers to Energy Efficiency under CDM, 22 November 2007, Vienna, Binu K Parthan and Udo Bachhiesl, REEEP and IEE, TU Graz

Citation preview

Page 1: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Barriers to Energy Efficiency under CDM

22 November 2007, Vienna

Binu K Parthan and Udo BachhieslREEEP and IEE, TU Graz

Page 2: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

REEEP• Multi-stakeholder

partnership launched at WSSD by UK;

• 245 partners with 38+24 governments;

• 84 projects covering 50 countries with € 6.3 mio with over € 23 million leverage;

• In Vienna with eight regional secretariats

Page 3: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

IEE, TU Graz

• Institute for Electricity Economics and Energy Innovation, Established in 2000, Faculty of Electrical Engineering and Information Technology, TU Graz;

• Prof. Stigler, dean and head;

• numerous academic activities and research projects in RE, EE, energy innovation and economics

Page 4: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Climate Change and Energy Efficiency

• IPCC Fourth Assessment Report –“warming of climate system is unequivocal”

• McKinsey –Environmental issues including climate change – #1 issue;

• IPCC – Role of Energy Efficiency – supply, buildings, agriculture, transport.

Page 5: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

CDM Projects

• 844 projects registered over 91 mio CERs issued – over 1 billion CERs expected;

• Only 97 energy efficiency projects registered – 5% CERs till 2012.

Fuel

Switch

1%

Industrial

Gas

70%

Energy

Efficiency

8%

Methane

and

Cement

6%

Renewables

15%

(Source: UNFCCC, UNEP)

Page 6: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

CDM Market

• 2006 market volume -$5.25 billion;

• 2007 October CER prices:– Registered projects 13-15

€/tCO2e

– Unregistered projects 8-11.5€/tCO2e

– Secondary 17€/tCO2e

• Post 2012 credits – 2$ to 7$;

Asia

80%

Africa

3%

LAC

10%

Other &

Unspecifie

d

7%

(Source: World Bank)

Page 7: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Methodologies

• 115 methodologies approved by EB –Several withdrawn/ consolidated;

• 21 Energy Efficiency Methodologies available;

• 11 methodologies never used!

EE

24%

Ind gas

12%

Fuel

Switch

7%

CH4+Cem

29%

RE

16%

AR

12%

(Source: UNFCCC, UNEP)

Page 8: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Barriers to Energy Efficiency

• Households and Buildings – Behavioral issues, information and regulation;

• Industry and Agriculture – information, management priority, competition;

Page 9: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Barriers to EE under CDM• Demonstration of

additionality –Investment Barrier (86%) – payback-period and classical investment analysis –Constraints energy efficiency;

• CDM M&P –single site, large scale and co-terminus emission reductions – Energy Efficiency (other than Industry) Smaller scale, dispersed and longer/different time periods

Page 10: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Barriers• Methodological issues

– 10% of methodologies useful for EE

– 30% success rate for EE methodologies compared to 50% average;

– Monitoring methodologies for EE;

– Equipment lifetime issues for retrofit or replacement;

– Consideration of upstream emissions.

• Need for methodological framework vs project specific methodologies

Page 11: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Barrier Removal Initiatives

• CDM Executive Board– Measures to improve the share

of EE in CDM;

– PoA which will allow EE CPAs;

• Expert Group on EE and Carbon Finance – WB, IEA, GEF, UN –methodologies, technical guidance and capacity building;

• EEC – policy makers, industry and development agencies –advocacy, global assessments and best practice – Global Status Report on EE.

Page 12: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Barrier Removal Initiatives

• CDM Gold Standard, sponsored by REEEP – 5-25% premium prices-Financial attractiveness of EE;

• LOGOC – Beijing London Olympic Games CDM Project;

• Econoler International –Indian street lighting scale-up project – CGI;

• IMT-Efficiency Power Plant -DSM, Jiangsu 2 mio tCO2e/y

Page 13: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

Summary

• Energy Efficiency offers one of the most cost effective options to mitigate Climate Change;

• Energy Efficiency - several major barriers in general and specific to CDM;

• Initiatives by CDM-EB and Networks and initiatives address some of the key barriers for Energy efficiency under CDM;

• REEEP role is a facilitator – Industry, NGOs, FIs, Governments to use the partnership and its resources to support EE under CDM.

Page 14: Barriers to Energy Efficiency under CDM

GFSE 2007, 22.11.2007, Vienna

www.reeep.org - NewsREEEPwww.reegle.info

[email protected]

[email protected]

All pictures from REEEP supported projects