BrightWork is the first collaborative Project and Portfolio Management product that was built on Microsoft SharePoint. BrightWork enables any organization to instantly deploy an affordable amount of project and portfolio management, delivering immediate visibility and control. The unique best practices template approach pioneered by BrightWork allows organizations to start quickly and evolve gradually, adding more templates and dashboards as needed and as ready.

Citation preview

Page 1: Brightwork Project Management Introductory Guide - From Atidan

Introductory Guide

Project and Portfolio Management Success Made Easy

Page 2: Brightwork Project Management Introductory Guide - From Atidan

Contents

1 Get Started .............................................................................................................................................................. 3

1.1 Take the BrightWork Tour ............................................................................................................................................................................................. 3 1.2 System Requirements....................................................................................................................................................................................................... 4

2 Improve Project Management Success ........................................................................................................... 5

2.1 Understand BrightWork Project Management Templates........................................................................................................................... 5 2.2 Create a New Template ................................................................................................................................................................................................... 6 2.3 Configure a Template....................................................................................................................................................................................................... 8

3 Easily Manage Projects ........................................................................................................................................ 9

3.1 Manage Low Complexity Projects in an Excel-like Fashion ......................................................................................................................... 9 3.2 Create a Project Site ....................................................................................................................................................................................................... 11 3.3 Manage a Medium Complexity Project ............................................................................................................................................................... 12 3.4 Manage a High Complexity Project....................................................................................................................................................................... 13

4 Collaborate on Projects ..................................................................................................................................... 17

4.1 Find My Work .................................................................................................................................................................................................................... 17 4.2 Update My Work.............................................................................................................................................................................................................. 18

5 Effectively Manage Portfolios .......................................................................................................................... 19

5.1 Report across Many Projects ..................................................................................................................................................................................... 19 5.2 Configure Reporting – Create Personal Report .............................................................................................................................................. 20

6 Evolve Project Management ............................................................................................................................ 21

6.1 Configure Project Management .............................................................................................................................................................................. 21 6.2 Add Extra Project Management .............................................................................................................................................................................. 22 6.3 Sync Project Management Changes to Live Projects .................................................................................................................................. 23

7 Training .................................................................................................................................................................. 25

7.1 Role Based BrightWork Training ............................................................................................................................................................................. 25 7.2 Project Management Training .................................................................................................................................................................................. 26

8 Next Steps ............................................................................................................................................................. 27

8.1 Subscribe to BrightWork in the Cloud ................................................................................................................................................................. 27 8.2 Buy BrightWork On-Premise ..................................................................................................................................................................................... 28 8.3 Start in the Cloud and Migrate on Premise ...................................................................................................................................................... 28 8.4 Contact Us ........................................................................................................................................................................................................................... 28 8.5 Connect with BrightWork ............................................................................................................................................................................................ 28

Published: 26 March 2013

Page 3: Brightwork Project Management Introductory Guide - From Atidan

1 Get Started Welcome to your BrightWork Free Trial and Introductory Guide. Your free trial is hosted on a BrightWork cloud

offering called ‘Project Share Online’. This Guide contains step-by-step instructions giving you an introduction

on how to use SharePoint to manage projects.

The Guide also has ‘Project Management Notes’ in italics that are worth pausing for, understanding and reflecting

on. You may also wish to review these notes again after you complete the exercises.

1.1 Take the BrightWork Tour BrightWork is the first collaborative Project and Portfolio Management product that was built on Microsoft

SharePoint. BrightWork enables any organization to instantly deploy an affordable amount of project and

portfolio management, delivering immediate visibility and control. The unique best practices template

approach pioneered by BrightWork allows organizations to start quickly and evolve gradually, adding more

templates and dashboards as needed and as ready.

1. Login to your Project Share Online account and click Home on the top link bar.

2. Click quick tour and you can walk through some of the major areas of the product and get a high level

overview and understanding of how SharePoint can be used to manage project and portfolios with

BrightWork, before you begin the exercises in this guide.

BrightWork Introductory Guide: Get Started

Page 3 of 28

Page 4: Brightwork Project Management Introductory Guide - From Atidan

1.2 System Requirements To exercise this guide, we recommend that your client machine meets the following system requirements.

(Note: BrightWork can be deployed in the cloud or on premise. The on premise system requirements for

BrightWork are the same as Microsoft SharePoint system requirements.)

1.2.1 Browser

Microsoft SharePoint 2010 requires Internet Explorer 7 or later. You can download the latest version of IE at

http://www.microsoft.com/windows/internet-explorer/worldwide-sites.aspx

(Note that while SharePoint does support other browsers (e.g. Chrome, Firefox, Safari) not all of the SharePoint

functionality is supported (e.g. SharePoint datasheets are only supported in IE 7 or later).

IE 10 users should add their new Project Share Online site being used in this Introductory Training to their

Compatibility View list – click the link to the below blog post for more information.

http://www.manageprojectsonsharepoint.com/blog/2012/11/14/internet-explorer-10-sharepoint-and-other-

issues

1.2.2 Microsoft Office

Use of the native SharePoint Datasheet view generally requires you to have the 32-bit Microsoft Office 2007+

client installed. However, there are workarounds for those with the wrong or even no version.

• Office 2003 or No Office client:

Install Microsoft Office Access 2007 Runtime client

Download from http://www.microsoft.com/download/en/details.aspx?displaylang=en&id=4438

See https://www.nothingbutsharepoint.com/sites/eusp/Pages/problems-with-edit-in-datasheet-with-

wss.aspx for more information.

• Office 64-Bit

Install the 2007 Office System Driver: Data Connectivity Component to use the Datasheet.

Download from http://www.microsoft.com/download/en/details.aspx?displaylang=en&id=23734

See http://office.microsoft.com/en-us/sharepoint-server-help/use-datasheet-view-in-64-bit-office-

2010-HA101882420.aspx for more information.

BrightWork Introductory Guide: Get Started Page 4 of 28

Page 5: Brightwork Project Management Introductory Guide - From Atidan

2 Improve Project Management Success BrightWork enables Project Management Champions to increase the overall project management success-

rate and reduce uncertainty. This is achieved by gradually deploying and evolving successful best practices for

Project and Portfolio Management (PPM) across the organization.

What will I do? In this section, you will play the role of a Project Management Champion. You will create and configure a project management template that can be used by others to manage projects. In doing so, you are deploying best practices in an evolutionary manner.

2.1 Understand BrightWork Project Management Templates Project Management Note: BrightWork includes a range of Project, Portfolio and Everyday Work Management

templates of varying complexity. A BrightWork template is a SharePoint site that you use when creating a project

site or another template. Each template contains Project Management best practices in the form of lists to

manage processes (e.g. Project Statement, Risks, Issues, Tasks, Metrics, etc.) and ready to use reports (e.g. Open

Work, Work Gantt, My Work, Project Status, etc.).

1. Click Templates Area on the top link bar.

2. Click the image in the Templates Spectrum web part.

Project Management Note: This will launch a pop-up that shows the spectrum of project management

templates that come with BrightWork. The templates we will be exercising in this Guide are Projects

Tracker, Project Office, Project Lite and Project Structured.

BrightWork Introductory Guide: Improve Project Management Success

Page 5 of 28

Page 6: Brightwork Project Management Introductory Guide - From Atidan

2.2 Create a New Template Project Management Note: When using BrightWork, you will want to create your own templates to deploy and

evolve your local project and portfolio management practices. You will be able to use the BrightWork supplied

templates as a quick starting point.

1. Click Site Actions | Create Project Template to open up the New Project Template form.

2. Give the Template a Title and a URL name.

Tip: We suggest mix of your name and the template name, e.g. MikeSmith-Project Lite.

Next, you will select the template that you are going to use.

3. Select Copy existing template and click the Browse button to open the Select Site dialog.

4. Enter Training in the Find field and click Enter on your keyboard.

Note: IE 10 users that experience any errors, please see the System Requirements on page 4.

BrightWork Introductory Guide: Improve Project Management Success Page 6 of 28

Page 7: Brightwork Project Management Introductory Guide - From Atidan

5. Select the Training – Project Lite template and click OK.

6. Click Create.

Note: The Training - Project Lite template is a copy of the out of the box BrightWork ‘Project Lite’ template,

with some sample data added.

Project Management Note: In the exercise above, you created a new template in the BrightWork Templates Area that can now be used by your project teams to manage projects. With BrightWork, you can quickly create new project and portfolio management templates from:

• BrightWork supplied templates • Local Templates already created and configured by your group • Live Projects with good practices that you wish to replicate

BrightWork Introductory Guide: Improve Project Management Success Page 7 of 28

Page 8: Brightwork Project Management Introductory Guide - From Atidan

2.3 Configure a Template Project Management Note: At this stage in the process, you might make multiple changes to the template you just

created, to mimic your local project management practices. In this Guide, we will get you to make one simple

change: you will update headings used in the Quick Launch. BrightWork is designed so that the desired template

changes tend to only require configuration (which can be carried out people without IT skills) and do not require

customization (which generally require some IT skills).

1. Click Site Actions | Site Settings.

2. Click Quick launch.

3. Click the Edit icon beside Initiate & Plan.

4. Change the description to Initiate and click OK.

5. Change the Execute & Control heading to Control by following the same steps as in 3 and 4.

6. Click Project Home and you will note the changes in your template. BrightWork Introductory Guide: Improve Project Management Success Page 8 of 28

Page 9: Brightwork Project Management Introductory Guide - From Atidan

3 Easily Manage Projects BrightWork enables Project Managers to consistently initiate, plan, track and control all their projects using a

set of flexible best practice templates managed in SharePoint.

What will I do? In this section, you will play the role of Project Manager on three different types of project. You will update project status, create a new project, assign tasks, track project status and easily create new status reports. Through these exercises, you will use a range of templates of increasing structure and understand how BrightWork can deliver the right amount of project management for each project.

3.1 Manage Low Complexity Projects in an Excel-like Fashion Project Management Note: The Projects Tracker template is a great place to start for organizations that are trying

to introduce project management discipline to the organization. It allows you to track the high-level details

regarding numerous projects in one location with a minimum of extra overhead.

1. Click Sample Area on the Top Link bar.

2. Click Small Systems Projects (PT) on the Project Hierarchy web part to visit an example of a Projects

Tracker template.

Project Management Note: The site hierarchy displayed in this web part is a typical example of how

project, portfolio and work management sites can easily be structured in BrightWork.

BrightWork Introductory Guide: Easily Manage Projects Page 9 of 28

Page 10: Brightwork Project Management Introductory Guide - From Atidan

3. Click Update Projects on the Projects Tracker Quick Launch.

This will open the Projects Tracker datasheet.

Project Management Note: The datasheet is a spreadsheet-like interface that allows you to make updates

to multiple items in a single location. If you currently submit project status reports using an Excel file, this

will be an easy transition to make.

4. Use the datasheet to make some changes to the projects, for example, make yourself (and any other

colleagues that have been added) a project manager of a few projects.

Tip – you can drag cells just like in a spreadsheet.

Note: If you experience any issues with using the Datasheet, please see the System Requirements on page 4.

5. Click Projects Home on the Quick Launch and click through the various report tabs that Senior

Executives use to get their project status reports (e.g. By Manager).

Project Management Note: The BrightWork Projects Tracker template allows the Project Manager to quickly

update project status as easily as updating an Excel file. Once the Project Manager makes the updates, multiple

reports and dashboards are also automatically updated. This enables Senior Executives to get visibility into project

statuses. The Projects Tracker template has a very quick deployment and adoption cycle that allows the

organization to get comfortable with SharePoint as a platform for collaborative Project and Portfolio

Management. In SharePoint terms this template can be deployed as a SharePoint list in an existing SharePoint

site or housed in a single SharePoint site dedicated to the purpose of easily and effectively tracking projects. As

with all BrightWork templates, you may add, remove, hide, and edit columns, to make it suit your own local

process. BrightWork Introductory Guide: Easily Manage Projects Page 10 of 28

Page 11: Brightwork Project Management Introductory Guide - From Atidan

3.2 Create a Project Site Project Management Note: Next, you will create a new project site using the template created and configured

earlier. As a result, this project contains the best practices required by the organization.

1. Click Sample Area on the top link bar.

2. Click IT (PO) on the Project Hierarchy web part to land on a Project Office.

Project Management Note: A Project Office is a BrightWork site template that reports on multiple projects

to one central set of dashboards.

3. Click Site Actions | Create Project.

4. Give the Project a Title and a URL name.

Project Management Note: This template includes sample tasks for a software deployment project. You

could add the typical tasks required for a business project in your organization.

5. Enter your name in the Project Manager field and click Enter on your keyboard.

Tip: Enter your name as it is displayed in the top right of the screen.

6. Click the Browse button.

7. Click Enter and select the template you created earlier in Section 2.2 (it is likely called something like

‘Your-Name Project Lite’).

8. Click Create.

9. Review the Project Management items listed on the Quick Launch (e.g. tasks, documents, issues, etc.) to

see the amount of Project Management included.

Project Management Note: The Project Lite template offers a small amount to medium of Project

Management.

BrightWork Introductory Guide: Easily Manage Projects Page 11 of 28

Page 12: Brightwork Project Management Introductory Guide - From Atidan

3.3 Manage a Medium Complexity Project

Note: For easier evaluation, sample data has been included in the project site you created.

1. Click Tasks Update on the Quick Launch.

2. Click Active Tasks (Datasheet) on the Project Tasks view menu.

3. Assign some tasks to yourself and to any of your colleagues that have been added to the system.

4. Click Work Reports on the Quick Launch – you should see the names you assigned work to in the

report.

5. Click on the report to expose the Reporter Tools ribbon.

6. Click the Email button on the Reporter Tools ribbon and email the report to yourself.

Project Management Note: The ability to email reports on demand (as in this exercise) or to email reports on a

pre-determined schedule, is a major aid in collaborating and communicating with Team Members, Stake Holders

and Senior Executives.

Note that reports in BrightWork can be put on a schedule to automatically email. Typical reports that are setup

on a weekly schedule by BrightWork customers include:

• ‘My Work’ to Team Members

• ‘Overdue Work’ to Project Managers

• Project Status Reports to Senior Executives

BrightWork Introductory Guide: Easily Manage Projects Page 12 of 28

Page 13: Brightwork Project Management Introductory Guide - From Atidan

3.4 Manage a High Complexity Project Project Management Note: You will now exercise the BrightWork Project Structured template.

3.4.1 Manage Project

1. Click IT (PO) on the Navigate Up menu.

2. Click Hardware Upgrade Global (PStr) on the Project Hierarchy web part.

3. Review the Project Management items included on the Quick Launch (e.g. goals, risks, etc.).

Project Management Note: The Project Structured template offers a lot more Project Management than

the Project Lite template site created above. For example, it delivers an enhanced Microsoft Project

Professional 2010 to SharePoint two-way synchronization of tasks.

4. Click on the Documents Library and you will see a Microsoft Project file.

Project Management Note: If you elect to use Microsoft Project for scheduling, then only one person is

required to be licensed with Microsoft Project to perform this sync. The Team Members continue to use

BrightWork Introductory Guide: Easily Manage Projects Page 13 of 28

Page 14: Brightwork Project Management Introductory Guide - From Atidan

SharePoint to find and update project information. BrightWork provides free training guides for our

customers on the sync between SharePoint and Project.

5. Click Project Home and then click the Project Schedule tab.

Project Management Note: The tasks in the work breakdown structure shown in the Gantt report were

synced from Microsoft Project to SharePoint by the Project Manager and can now be viewed in a browser

by all Team Members.

6. Click the X in the top-right of the Gantt report to close it.

7. Click Project Status to see a detailed set of dashboard reports.

3.4.2 Track and Report Status

1. Click Metrics on the Quick Launch.

Project Management Note: The BrightWork Metrics list stores the current value and the historic values of

key project data items that you nominate (e.g. cost, start dates, finish dates, effort, number of risks, etc.).

The data stored in the Metrics list can be manually entered or automatically captured. The Metrics list also

enables you to define Target, Warning and Danger ranges for the metric and to associate traffic light

indicators with these ranges.

BrightWork Introductory Guide: Easily Manage Projects Page 14 of 28

Page 15: Brightwork Project Management Introductory Guide - From Atidan

2. Scroll down and click on the Issues metric.

Project Management Note: This metric returns a count of the number of Issues with a red status indicator

flag (indicating they are not being dealt with on time). If the number of red or late issues equals or exceeds

a certain threshold, (in this case 2), the metric will flag it with a red indicator. The Metrics lists also

supplies information to automatically update the health icons on the project home page, in the Project

Status dashboards and in the Status Reports that you will create shortly.

3. Click View Metric Chart.

Project Management Note: The Metric chart displays a visual representation of the metric as it evolved

over time.

4. Click Project Home on the Quick Launch.

Project Management Note: The red issues icon comes from the metric you just looked at.

5. Click Status Reporting on the Quick Launch.

BrightWork Introductory Guide: Easily Manage Projects Page 15 of 28

Page 16: Brightwork Project Management Introductory Guide - From Atidan

6. Click Add new item.

7. Select a Phase and add some detail to the text fields.

Project Management Note: The information you add is the commentary that a Senior Executive would be

expecting.

8. Click Save.

Project Management Note: This triggers a workflow that pulls the latest status information from the

project site (e.g. start and finish dates, etc.) and adds this information to the commentary you just entered.

Status reports enable you to keep a history of how the project progressed.

9. Wait a few seconds (as the workflow executes) and then click F5 on your keyboard. The workflow

should have populated the rest of the detail in the item with the data from the project site.

Project Management Note: In the first exercise in this last section, you saw an Excel like SharePoint template for

Project and Portfolio Management that delivers immediate visibility and control. You then saw how easy it is to

create a new project site from a template with a given amount of Project Management best practices. In the last

two exercises in this section, you saw more Project Management being applied with templates containing more

Project Management process.

At BrightWork, we know that no one size of Project Management meets the needs of all projects. We START with

you by meeting you where you are at. We focus on your immediate needs, so we can get you started quickly and

easily. When you are ready to take on more Project Management, with BrightWork you will have the tools and the

training you need to EVOLVE.

BrightWork Introductory Guide: Easily Manage Projects Page 16 of 28

Page 17: Brightwork Project Management Introductory Guide - From Atidan

4 Collaborate on Projects With BrightWork, Team Members come in and out of the collaborative work and project environment as

needed, where they connect to their work assignments and extended teams. BrightWork means Team

Members no longer have to prepare reports for various stakeholders as the system does it for them – “enter

once; report done".

What will I do? In this section, you will play the role of a Team Member, and find and manage your assigned work.

4.1 Find My Work 1. Click IT (PO) on the Navigate Up menu.

2. Click the link on the Quick Launch (or on the Project Hierarchy web part) and navigate to the site you

created using the Project Lite template.

3. Click My Work Reports – you should see the work items you assigned yourself earlier. This report and

the other reports will always show the work items assigned to the logged in user.

4. Explore some of these reports; also note that you can select another user from the drop-down menu to

see their work and assess how it is progressing. Try this if you assigned a colleague some work in one of

the earlier exercises.

5. Click F5 (which refreshes the page) to force the report back to showing your work.

Project Management Note: Team Members can easily find the work they must do on the ‘My Work’

dashboards exercised above, and this same information is also typically auto-emailed to Team Members on a

weekly schedule.

BrightWork Introductory Guide: Collaborate on Projects Page 17 of 28

Page 18: Brightwork Project Management Introductory Guide - From Atidan

4.2 Update My Work Project Management Note: Team Members need an easy way to collaborate on a project. For example, they need

to effortlessly flag issues, quickly update task status, safely edit documents, easily check the work outstanding for

themselves, and transparently see the overall goals and progress of the project.

1. Click the title link on one of the items in your My Work report.

2. Click Edit Item.

3. Select the Issue Indicator checkbox and enter some text in the Issue Description field.

4. Click Save.

This item will now show up in Issue reports (as we will see it in a later exercise).

Project Management Note: All the project templates in BrightWork contain an Issues list but they also

have an easier way of identifying an issue with a particular work item.

5. Open another item in the My Work report for editing, select Completed from the Task Status drop

down and click Save.

6. Click F5 to refresh the report – the items you marked as complete will disappear off the report.

7. Click Documents on the Quick Launch.

8. Click Edit in Microsoft Word on the menu of the document in the library.

The document should open in Microsoft Word. Make some edits and save it.

9. Use the Navigate Up menu to return to the IT (PO), that reports across many projects.

10. Click My Work on the Quick Launch – you should see the work you assigned yourself earlier grouped

by its project title. (This report will display all your work across all projects.)

BrightWork Introductory Guide: Collaborate on Projects Page 18 of 28

Page 19: Brightwork Project Management Introductory Guide - From Atidan

5 Effectively Manage Portfolios With BrightWork, Senior Executives effectively and efficiently manage a large portfolio of projects. This enables

them to make real time decisions and improve the organization’s bottom line.

What will I do? In this section, you will play the role of a Senior Executive. You will use BrightWork to report across a range of projects and configure that reporting to suit your specific needs.

5.1 Report across Many Projects 1. Navigate up to the Sample Area home page (i.e. click Sample Area on the top link bar).

2. Explore the various cross-project reports in the Sample Area, using the Quick Launch and the tabs.

3. Click Issues on the Quick Launch – you will see all the issue items from all the projects in the

organization.

4. Expand some of the sections in the report and see if you can find the task you marked as an issue

earlier.

5. Try out in-report filtering and sorting by clicking in the column headers.

Project Management Note: Senior Executives need lots of out of the out of box reports (that BrightWork

provides) and also need the ability to dynamically change these reports on the fly (as seen above).

BrightWork Introductory Guide: Effectively Manage Portfolios Page 19 of 28

Page 20: Brightwork Project Management Introductory Guide - From Atidan

5.2 Configure Reporting – Create Personal Report 1. Click in the report header to expose the Reporter Tools ribbon.

2. Unselect the Show Grouping checkbox.

3. Reselect the Show Grouping checkbox.

Next, you will change the default view to be issues due today or earlier.

4. Click the Filters button (which is in the ‘Personalise this Report’ area of the Reporter ribbon).

5. Select Date Due from the Column Name field

6. Select is less than or equal to from the Comparison type field.

7. Enter [Today] in the Comparison Value field.

8. Click OK.

Project Management Note: You have just created a Personal report that is now saved and will load first for

you when you revisit this page. You can view the Shared report that everyone else sees by clicking the

Shared button on the top left hand side of the Reporter ribbon.

Project Management Note: In this section, we have seen that a Senior Executive has the ability to view and

report across multiple projects, take action and configure any report and have it served up to their liking,

without requiring assistance from IT. BrightWork Introductory Guide: Effectively Manage Portfolios Page 20 of 28

Page 21: Brightwork Project Management Introductory Guide - From Atidan

6 Evolve Project Management With BrightWork, the IT Manager / SharePoint Owner simplifies IT operations and lowers application

operating and maintenance costs by deploying the new Project Management solution on Microsoft SharePoint

in the cloud or on premise. This use of the SharePoint platform allows non-IT staff like Project Management

Champions to make the local configurations without depending on busy IT resources.

What will I do? In this section, you will again play the role of the Project Management Champion. You will understand how the BrightWork configuration options tightly integrate with SharePoint. You will add more project management to the template you created earlier and deploy that extra project management to the live project you created from the template.

6.1 Configure Project Management Project Management Note: BrightWork is highly configurable and customizable. All the standard SharePoint

configuration and customization options are available. BrightWork also gives extra configuration options and

these extra capabilities integrate seamlessly into the native SharePoint user interface. If your Project Managers

and SharePoint admins are familiar with SharePoint, they will easily be able to configure BrightWork with no

programming required.

1. Click Browse on the ribbon.

2. Click Templates Area on the top link bar.

3. Click the link to the template you created earlier.

Tip: It should have your initials in it and will be the one at the bottom of the Quick Launch as it is most

likely the most recently created site in the Templates Area.

BrightWork Introductory Guide: Evolve Project Management Page 21 of 28

Page 22: Brightwork Project Management Introductory Guide - From Atidan

4. Click Issues Update on the Quick Launch (of the Project Template).

5. Click List on the ribbon and then List Settings.

Project Management Note: This settings page is where you make configuration changes to lists, such as

adding new columns and enabling versioning.

6. Click Column visibility settings (BrightWork).

Project Management Note: The BrightWork page that appears is where you would hide columns on the

Issues list form.

6.2 Add Extra Project Management Next, we will get you to add more project management to your template in the form of a Risk list.

1. Click Site Actions | More Options.

2. Click List | Blank & Custom and select the Training Project Risks list.

BrightWork Introductory Guide: Evolve Project Management Page 22 of 28

Page 23: Brightwork Project Management Introductory Guide - From Atidan

3. Give the list a name and click Create.

6.3 Sync Project Management Changes to Live Projects Project Management Note: In Section 2 of this Guide, you created and configured a new template. In Section 3,

you used this template to create and manage a project. In the previous exercise, you modified this template to add

Risk Management. In the next exercise, you will deploy these project management modifications to a live project

using the Template Design Sync. This sync can be done by the Project Manager or by the Project Management

Champion (again, without needing IT help).

1. Click Site Actions | Site Settings.

2. Click Determine Template Usage.

Project Management Note: Again, note how the BrightWork settings are neatly tucked in beside the

SharePoint settings.

3. Click Locate.

BrightWork Introductory Guide: Evolve Project Management Page 23 of 28

Page 24: Brightwork Project Management Introductory Guide - From Atidan

4. Click the link to the site to navigate to it.

5. Click Site Actions | Site Settings.

6. Click Synchronize with Template.

7. Click the Quick Launch box.

8. Scroll down and click Sync.

9. Click OK to confirm.

The report that displays will let you know if any errors have occurred. Click OK again.

You should see the Risk list you added to the template is now added to the project site.

Note: Should you need to push changes to many sites in one go, BrightWork has a script that can achieve this.

Project Management Note: As you have just seen, BrightWork includes a unique design sync capability that allows

you to make changes to a template and pull those changes into the live project sites created from that template.

BrightWork also gives you the capability to locate the project sites created from the template. This allows you to

evolve the project management process across the organization in real time. This cycle of practical continuous

improvement is essential to the project management success of any organization.

BrightWork Introductory Guide: Evolve Project Management Page 24 of 28

Page 25: Brightwork Project Management Introductory Guide - From Atidan

7 Training At BrightWork, we understand that our customers need access to high quality on demand role based training.

7.1 Role Based BrightWork Training Click Training Area on the top link bar to view the page below. When you subscribe to Project Share Online,

these role-based training tiles depicted here will become active.

BrightWork customers get free access to extensive role-based training (as depicted above). BrightWork

customers can also get free access to the source copy of these materials in the event they wish to modify the

training materials for local usage.

BrightWork Introductory Guide: Training Page 25 of 28

Page 26: Brightwork Project Management Introductory Guide - From Atidan

7.2 Project Management Training Some customers have Project Managers who have never had any Project Management training, formal or

informal.

BrightWork have partnered with IIL (International Institute for Learning) to deliver a set of Project Management

templates that include context sensitive links to multimedia Project Management training based on the PMI

PMBOK® Guide.

These templates were designed to support the techniques in the IIL PMBOK® training. This makes it possible

to learn and execute project management in one SharePoint environment.

To view one of these templates, click Sample Area on the top link bar and click SharePoint Upgrade Server

Farm (PMB+Str) on the Project Hierarchy web part.

Note: These extra PMBOK® based templates are free to all BrightWork customers; however, access to the IIL

PMBOK® training, linked to from the templates, incurs a modest fee of $195 per user per year.

BrightWork Introductory Guide: Training Page 26 of 28

Page 27: Brightwork Project Management Introductory Guide - From Atidan

8 Next Steps Congratulations on completing the BrightWork Introductory Guide. We hope you now have an awareness of

how BrightWork can assist you improve the project management success rate in your organization.

Suggested Next Steps:

• Subscribe to BrightWork in the Cloud

• Buy BrightWork on Premise

• Start in the Cloud and Migrate on Premise

• Contact Us

• Connect with BrightWork

8.1 Subscribe to BrightWork in the Cloud Subscribe to Project Share Online for $35 per user per month and start managing projects today.

Project Share Online is the hosted application you are using with this Introductory Guide. It is available as a

month-to-month service that you may cancel at any time. The initial subscription also asks you to purchase a

getting started package of deployment services, training and consulting at a cost of $900. As a BrightWork

customer using Project Share Online, you will also get access to the complete suite of role-based BrightWork

training courses described above.

To subscribe to Project Share Online now, click Admin, then Subscribe Now and follow the on screen

instructions to convert your trial environment to a fully subscribed managed service.

For an introduction to Project Share Online, watch the two movies available from the home page.

BrightWork Introductory Guide: Next Steps Page 27 of 28

Page 28: Brightwork Project Management Introductory Guide - From Atidan

8.2 Buy BrightWork On-Premise Your organization can easily deploy BrightWork on SharePoint servers inside your organization. Many

BrightWork customers start with our Project Office JumpStart.

The JumpStart uses best practices and a proven deployment approach to rapidly implement a fully working

Project Office using Microsoft SharePoint and BrightWork.

The JumpStart bundle includes: (i) software; (ii) mentoring / training; and (iii) support for one year.

More information on JumpStart and BrightWork On-Premise pricing is available on our pricing page.

8.3 Start in the Cloud and Migrate on Premise Some customers elect to use BrightWork hosted in the cloud and later migrate in-house to their own

SharePoint servers.

8.4 Contact Us Phone BrightWork in the US on 1-617-357-9000 ext. 701 or in Europe on +353-91-514-492.

Email BrightWork at [email protected].

8.5 Connect with BrightWork

BrightWork Introductory Guide: Next Steps Page 28 of 28