Page 2: Ceara better for_everyone

AREA:� 148,825 km² with 184 municipalities� 573 km of coastline

INFORMATION ABOUT CEARÁ

CAPITAL CITY:� 5th largest city in Brazil� 7th largest city in consumption potential� 7th largest city in consumption potential

MAIN SECTORS

� Industry� Energy� Minning

� Commerce� Services� Agribusiness

POPULATION:� 8.4 million� Urban: 6.3 million� Rural: 2.1 million

Page 3: Ceara better for_everyone

STRATEGIC GEOGRAPHICAL LOCATION

� Shortest transit time (t/t) for routes to:� USA, Europe andAfrica. � Drafts appropriate to large ships.

Page 4: Ceara better for_everyone

EDUCATION

Alfabetização na Idade Certa Program- Objective: to improve teachingand learning.

EEEPParacuru

- 92% of children in school.

State School of Professional Education-EEPPObjective: to link basic education to vocational education giving an opportunityfor young people to complement their studies.� Total: 140 EEEP;

� + 25,000 students.� Total Investment: BRL 24 million.

� BRL 13 million from the State/ BRL 11 million from FNDE/MEC.

Page 5: Ceara better for_everyone

CORPORATE TECHNICAL TRAINING CENTER (CTTC)

� Objective: to qualify the local workforce to meet the Premium II Refinery and CSP (steel) and other demands of the CIPP;

� Total Investment: BRL 28,3 million fromMCT/GOV-CE;

CTTC Pecém

MCT/GOV-CE;

� Start of operation: first quarter of 2013;

� Public: 12,000 persons/year;

� Course: Civil Construction, Eletromechanicaland Petrochemicals;

� Located: between highways CE-085 with CE-422, Caucaia.

Page 6: Ceara better for_everyone

� MODEL OF INTEGRATED OPERATIONAL SAFETY - SAFE CEARÁOperational Integration of the Military and Civil P olice + Fireman + Community Councils and other actions for social sec urity and defense

� Ronda do Quarteirão program: peacemakers agents located throughout the region with a phone in the cars. They have equi pment connected directly

DEPARTMENT OF PUBLIC SAFETY AND SOCIAL PROTECTION

to the integrated center of operations of the polic e;

� CARS WITH EQUIPMENT;� HELICOPTERS;� BP TUR (Police with special car for tourists)� SPECIAL POLICE FOR TOURISTS� STRATEGICAL GROUP FOR MAJOR EVENTS� SOCIAL COMMUNITY COUNCILS OF DEFENSE - 860 units

Page 7: Ceara better for_everyone

HEALTH – INVESTMENTS AND OPPORTUNITIES

� Industrial and Technological Pole of Health: in ord er to strengthen the chemical and pharmacology sectors of the State;� Area of 55ha in municipality of Eusébio (Ceará);� FioCruz, Isofarma, CTI Renato Archer;� Status: Request for Environmental Permission - SEMACE� Start of Operation: 2014

� Central Regulation of Health: to act in health care services and pharmaceutical services, Strategic Pro grams for specific serious diseases (aids, tuberculosis) and biopharmaceuticals, state agencies and central labo ratory schools of public health;� 150 Basic Units of Family Health - USBFs� 20 Centers for Medical Specialties – EMFs� 16 Centers of Dental Specialties - CEOs� 1 Hospital in Sobral (Northern Region)� 1 Hospital in Juazeiro do Norte (Cariri Region)

Page 8: Ceara better for_everyone

GROWTH OF GDP IN CEARÁ (2011)

GDP: BRL 84 billion

Growth rate of GDP: 4,3%

GDP per capita: BRL 9.865,00

Inflation rate: 6,5% 2011 The economy of the state

EVOLUTION GDP - CEARÁ

(R$ billion):

2003: 28,6 2006: 40,5Inflation rate: 6,5% 2011

The economy of the state increased more than twice of

the national economy (IBC / BR)

2006: 40,52009: 60,8 2017: 90,0

(54% over 2009)

Growth rate of GDP (%) Brazil and Ceará – 2008 a 2011

LOCAL 2008 2009 2010 2011

Ceará 7,10 3,10 6,1 4,3

Brazil 5,10 -0,20 2,79 2,7

Page 9: Ceara better for_everyone

POLES OF IRRIGATED AGRICULTURE OF CEARÁ

� 200,000 ha of irrigated area

� 94,000 ha are irrigated:� 43,000 ha with fruits: acerola , banana, coconut, melon, watermelon, papaya, mango, soursop;• 10,000 ha of vegetables and flowers

� 200,000 ha of irrigated area

� 94,000 ha are irrigated:� 43,000 ha with fruits: acerola , banana, coconut, melon, watermelon, papaya, mango, soursop;• 10,000 ha of vegetables and flowers• 10,000 ha of vegetables and flowers• 41,000 ha of other products: grass, rice, beans, sugar cane etc.

� 20,000 ha ready for irrigation in the irrigated areas (Baixo Acaraú and Russas);

� Opportunities for: citrus, fruits of temperate climates, milk, shrimp, tilápia , and others.

• 10,000 ha of vegetables and flowers• 41,000 ha of other products: grass, rice, beans, sugar cane etc.

� 20,000 ha ready for irrigation in the irrigated areas (Baixo Acaraú and Russas);

� Opportunities for: citrus, fruits of temperate climates, milk, shrimp, tilápia , and others.

Page 10: Ceara better for_everyone

� Audiovisual� Cashew Culture� Shrimp� Carnaúba� Trade and Services� Eletrometal� Events� Wind Power Energy 19

19 SECTOR BOARDS

� The Sector Boards are advisory bodies composed of representatives of private entities involved, non-governmental organizations, public and private agencies related to the segments.� Wind Power Energy

� Floriculture� Fruitculture� Milk� Logistic� Honey� Mineral� Recycling� Health� Information of Technology� Tilápia Fish

19 segments.

� The members of the Boards work together in order to identify problems and propose suggestions that contribute to the development of productive activities in Ceará.

Page 11: Ceara better for_everyone

Itataia Plant has the largest deposit of uranium in Brazil.

� Location: Santa Quitéria (municipality)

� Size:

ITATAIA – PHOSPHATE AND URANIUM

� Size: � 80 meters long� 160 meters depth

� Features:� Mineable reserves of ore: 79 million tons� Mineable reserves of phosphate: 8.8 million tons� Mineable reserves of uranium: 79.3 thousand tons

� Investment: US$ 375 million for the extraction of phosp hat and uranium

Page 12: Ceara better for_everyone

DIGITAL LOGISTICS – “DIGITAL BELT OF CEARÁ”

Submarine cabling of optical fiber (Europe-USA-South America)

Cinturão Digital do Ceará (“Digital Belt of Ceará”)

� There are 92,000 km cover fiber optic - 92 cities

Page 13: Ceara better for_everyone

OPERATION OF DIGITAL COVERAGE BELT OF CEARÁ - CDC

� Initial coverage installed in 53 municipalities

oror

� 88% of urban population withlarge band

� Investment of BRL 60 million

Page 14: Ceara better for_everyone

SUBWAY OF FORTALEZA

SOUTH LINE� Length: 24 km� Stations: 20� Trains: 10 (900 passengers/train)� Potential: 350,000 passengers/day

WEST LINE� Length: 19 km� Stations: 10� Trains: 6 (1,000 passengers/train)� Potential: 255,000 passengers/day

LRV PARANGABA / MUCURIPE� Length: 13 km� Stations: 9� Trains: 6 (800 passengers/train)� Potential: 90,000 passengers/day

EAST LINE� Length: 13 km� Stations: 13� Trains: 20 (1,300 passengers/train)� Potential: 400,000 passengers/day

Page 15: Ceara better for_everyone

OTHER SUBWAYS IN CEARÁ

Cariri

Sobral

Page 16: Ceara better for_everyone

ROAD

7,000 km of state paved roads

2,500 km of federal paved roads

Page 17: Ceara better for_everyone

ARCO METROPOLITANO

� It connects BR 116 to CIPP

� Total Investment: BRL 275,000,000.00

� Status: Executive Project

Extension (double-lane):88.7 km

� Status: Executive Project� Start: 2012� Conclusion: 2014

Page 18: Ceara better for_everyone

PORT OF FORTALEZA

Parking area: 30,798 m²

� Passenger terminal� Constructed area: 9,619 m²� Parking area: 30,798 m²� Yard area (load): 40,600 m²� Draft: 10 to 14 m

Area of containers

Page 19: Ceara better for_everyone

PORT OF PECÉM

� Located 56 km from Fortaleza� Draft: 14 to 18m� 2 piers� 4 loading berths (17 by 2016)

Page 20: Ceara better for_everyone

PORT OF PECÉM

�Conveyor belts for ore and coal with 8,4 km long� Unloader for ore� 2 loaders for steel plates (6 by 2016)� Construction of a berth for steel plates (3 berths by 2014)� 2 piers for tankers

Page 21: Ceara better for_everyone

LAYOUT – PORT OF PECÉM IN 2016

Investment: US$ 2.8 billion by 2016

Page 22: Ceara better for_everyone

SECTOR 01� Thermal power plants� Steelworks (CSP)

SECTOR 02� Refinery� Petrochemical Pole / Derivatives Distributor

MASTER PLAN OF CIPP

� Petrochemical Pole / Derivatives Distributor

SECTOR 03� Petrochemical Pole� Electro Metal Mechanical

SECTOR 04� Institutional area� EPZ� Thermal power plants

TIC� Intermodal terminal of loads

Page 23: Ceara better for_everyone

AIRPORTS (2 INTERNATIONAL AND 13 AIRFIELDS)

Expansion of PassengerTerminal (Fortaleza)

Investment: BRL 279,500.00

Page 24: Ceara better for_everyone

TRANSNORDESTINA RAILWAY

Missão Velha – Pecém: 527 km

Total investment: BRL 1,871.6 million

Page 25: Ceara better for_everyone

WATER MANAGEMENT Castanhão Dam� Volum: 6,7 bilion m³� Irrigation: 43,000 hectares

“ Labours Channel ”:105km

� Integration and shared management of river basins� 18 billion m³ of water

11 Riverbasins

“ Labours Channel ”:105kmIrrigation: 7,000ha

Integration axis: 255 kmIrrigation: 25 mil ha

Page 26: Ceara better for_everyone

ENERGY

The State of Ceará will be self-sufficient in energy in the next three years. To do so, the Government of the State is creating a fa vorable ambience to the development of this sector.

GAS IN CEARÁ� Gasification plant produces 7 million cubic meters

SOURCES OF SUPPLY OF NATURAL GASSource ExtensionParacuru 96 kmGuamaré 331 kmPecém (GNL) 51 km

� Gasification plant produces 7 million cubic meters of natural gas per day (CIPP)� 87.6 million cubic meters of natural gas/year distributed

Page 27: Ceara better for_everyone

THERMAL POWER PLANTS

MPX PECÉM II (MPX)

� Deployed: 857 MW in 20 plants (natural gas, fuel oi l)� Under construction: 1,080 MW in 2 plants (coal)� Future (3 years): about 1,000 MW in 5 power plants (ga s, diesel)

MPX PECÉM II (MPX) � Installed capacity: 360 MW� Expectation for operation: 2012� Investment: US$ 1.3 billion

ENERGIA PECÉM (EDP/MPX) � Installed capacity: 720 MW� Expectation for operation: 2012� Investment: US$ 2.8 billion

Page 28: Ceara better for_everyone

WIND POWER

� Wind potential – Ceará: 25,000 MW (on shore) and 10, 000 MW (off shore)� National leadership (37% of installed capacity in B razil)� Deployed: 519 MW in 17 plants (Investment: R$ 2 bil lion)� Hired: 1299 MW in 52 plants (Investment: R$ 5 billi on)

� 543 MW in 21 plants (operation in 2012)� 150 MW in 5 plants (operation in 2013)� 150 MW in 5 plants (operation in 2013)� 278 MW in 11 plants (operation in 2014)� 328 MW in 15 plants (operation in 2016)

Page 29: Ceara better for_everyone

OTHER RENEWABLE ENERGY

Solar Park (MPX)� The unique solar plant in commercial operation in B razil� Municipality: Tauá/CE � Power: 1MW (Investment: R$ 10 million)� 2nd MW already hired in partnership with GE (Operat ion – 2012)

Tidal� Pioneer in Latin America� Place: Multi-Purpose Terminal at Port of Pecém� Power: 50 kW� Power: Seinfra/Ceará

Small Hydroelectric� Place: Araras Dam� Owner: Chesf� Power: 4 MW

Prospecting: + 50 companies interested in investing in the sector.Insolation potential in Ceará: 7 to 8 hours/day

Page 30: Ceara better for_everyone

TRANSMISSION OF ENERGY

CHESF

� Company from the group Eletrobrás(the largest company in electricity in Latin America)America)

� 14 substations in Ceará (69, 230 and 500 KV)

� Investment: R$ 643 million in transmission lines and substations by 2014

Base de dados: Mar/2011Fonte: Diário do Nordeste

Page 31: Ceara better for_everyone

ENERGY DISTRIBUTION

COELCE

� The best energy distributor company of Brazil (ABRADEE – 2009/2010/2011)

� 122,000 km of low and medium voltage network

� 3 million customers

� 100 substations

Base de dados: Nov/2005Fonte: EPE

Page 32: Ceara better for_everyone

TAX INCENTIVES FROM THE GOVERNMENT OF CEARÁ

INDUSTRIAL DEVELOPMENT FUND – FDI

� Law nº 10.367, from December 7th, 1979 and changes� It has the objective to stimulate the industrial policy o f the State

Up to 75% deferral and return 1 - 25% of GST, incentive and that the Up to 75% deferral and return 1 - 25% of GST, incentive and that the percentage rate of return and enjoyment of the bene fits are measured through the variables:� Employment generation,�Transaction costs (operation),� Geographical location of the project,� Social responsibility projects,� Program research and development.

The deadline for the benefit is up to 10 years, renewable for an equal period.

In the projects:� Implantation� Extension� Diversification

Page 33: Ceara better for_everyone

EXPORT PROCESSING ZONE OF CEARÁ

� Area: 4.271 ha� Without taxes;� Export 80% of production;� Anchor Company:CSP� Manager company: Emazp� Local: CIPP� 12% increasing of GDP of Ceará

Start of operation : 2015 (CSP)

LAYOUT - INITIAL PHASE

� Start of operation : 2015 (CSP)

Page 34: Ceara better for_everyone

CITY OF WHOLESALE OF CAUCAIA - CEARÁ

� Largest business complex in Latin America:389,000 m² complete with sheds and storage;

� Investment of $ 260 million (Varicred);� Access: BR 020 and BR 222;� Direct Jobs: 3,700� Conclusion: 2012

Page 35: Ceara better for_everyone

� It aims to strengthen the logistics infrastructure of the state;

� Location: Intersection of highway CE-178 with the Northern Line of

INTERMODAL PLATFORM AND DRY PORT FOR SOBRAL

CE-178 with the Northern Line of Transnordestina railway;

� Growth of the competitivity of theproducts of the region in internal andexternal markets;

� Products in the North: granite, mining, cement industry, cashew nuts, irrigated agriculture (flowers and fruits), shoes and furniture, metal-mechanic pole.

Page 36: Ceara better for_everyone

MAJOR PROJECTS

PREMIUM II REFINERY� Investment: US$ 11,1 billion� Generation of jobs: 90,000 direct and indirect� Processing capacity: 300,000 barrels/day of oil� Increase of 45% in GDP of Ceará� Main products : diesel oil , kerosene for aviation (jet fuel ), Naphtha , � Main products : diesel oil , kerosene for aviation (jet fuel ), Naphtha , liquefied petroleum gas (LPG) and bunker oil (for ships).

STEEL (CSP)� Partnership: Dongkuk Steel / Vale S.A. / Posco� Investment: US$ 4 billion� Generation of jobs

� Construction: 15,000 direct and 8,000 indirect� Operation: 4,000 direct and 10,000 indirect

� Production: 6 million tons/year of steel plates� Expectation for construction: 4 years� Increase of R$ 9.3 billion in GDP of Ceará

Page 37: Ceara better for_everyone

AÑON STEEL – STEEL MILL

� Investment: US$ 1 billion

� State Participation: 10%

� Generation of jobs: 800 direct and 3,200 indirect

� Main products: steel blades for industry white goods, automotive and shipbuilding

� Production: 600,000 tons / year

� Planned to start: end of 2013

Page 38: Ceara better for_everyone

RIDE OF TOURISM, BUSINESS AND RELIGIOUS

� 573 km of coastline� 7,000 formal companies in tourism� 1,114 hotels with 27,702 hotel units� 7th in the ranking of events (ICCA)� World Cup 2014

� Centro de Eventos do Ceará� Investment: R$ 327,7 million� Conclusion: July, 2012� 2nd largest in Latin America� Capacity: 30,000 people

� Acquário� Investment: R$ 250 million� Visitors expected: 1,2 million/year� 21.5 thousand square meters

Page 39: Ceara better for_everyone

MAJOR EVENTS

WORLD CUP 2014 - ARENA CASTELÃO

� Capacity for 67,037 spectators (FIFA requires 60,00 0)� Area of 70,000 m², 1,900 parking spaces, the headqu arters of state

� Confederations Cup - June 15, 2013

� Area of 70,000 m², 1,900 parking spaces, the headqu arters of state agencies and eight years of administration of the S tadium

� Consortium Galvão and Andrade Mendonça� Investment: BRL 518,6 million� Opening: Late 2012, 56.02% of work completed� There are 1,200 workers, among graduates of the pri son

system and people with disabilities� Training, qualification, literacy within the work i tself.� Visit the website of Secopa for more information: