Upload
mvrpc
View
1.276
Download
0
Embed Size (px)
DESCRIPTION
Regional and Local Bike Plan presentation for public meeting.
Citation preview
1
Miami ValleyComprehensive Local-Regional
Bikeways Plan
Public Meetings: October 22, 2008
2
Your Vision is Our Mission:“The Miami Valley Regional Planning CommissionThe Miami Valley Regional Planning Commission’’s s
Comprehensive LocalComprehensive Local--Regional Bikeway Plan is intended to Regional Bikeway Plan is intended to enhance regionenhance region--wide bikeway networks including both wide bikeway networks including both
regional and local bike paths and their connections regional and local bike paths and their connections throughout the MVRPC planning area.throughout the MVRPC planning area.””
3
Ohio’s Bikeway Heritage
Xenia was named the "5th best place in the nation to live" by the American Hiking Society and inducted into the Trail Town USA Hall of Fame.
4
The Existing System
5
6
Opportunities
• Bike on Bus/Vans• Existing Partners• Cultural / Heritage
Tourism• Environmental
Education• Safe Routes to
Schools• New Green Movement• SAFETEA
7
Challenges
• Rights-of-Way• On- and Off-Street Bikeways • Trail/Roadway X-ings• Funding Priorities• Declining Bike to Work Data
Physical Inactivity Epidemic• Land Use/Sprawl• Aging in Place• Rural Roads / Complete
Streets
8
Rural Roads
Bikeway Types
“In-Corridor” Bikeways
Shared Use Paths / Trails
9
Task 1: Project Management
Task 1 ProductsFinal project schedule Project Contact listMonthly Conference CallsStatus report to accompany invoices
10
Task 2: Public Involvement
• YOU!• Steering Committee• Public Workshops• Project Website:
www. altaplanning.com/mvrpc/
Task 2 ProductsPublic Involvement Plan ( Technical Memo #1)(3) Steering Committee Meetings (9) Public Meetings, (3 per county)(1) Additional on-site meeting, if needed Contact listsProject WebsitePowerpoint Presentations Meeting Agendas, Media Releases, Meeting Summaries
11
Task 3: Inventory and Mapping
12
Task 4: Safe Routes to School Toolkit and Project Description Sheets
13
Task 5: ProjectRecommendations
Draft & Final Bikeways Plan
Key Changes
• Modified “complete streets’ language• Coordinated database with LRP• Updated Maps per Committee comments• Emphasized voluntary cooperation of
local communities• SR2S Toolbox for each district• General edits and final formatting
14
15
16
17
18
19
MVRPC TIP and Long-Range Plan
20
The Long Range Plan Connection
21
Priority Projects• ~20 Project Description Sheets• Planning-Level Cost Opinions• Pre-Funding Applications• Corridors, Area–wide projects• “Early Wins”
22
The Other E’s
23
Task 6:Local Bikeway Action Plans
24
BFC Best Practices• Education• Enforcement• Encouragement• Engineering• Evaluation
25
Innovation
26
Solutions
27
“ Determine that the thing can and shall be done, and then we shall find the way.” Abraham Lincoln
Thank You!
Alta Planning + Design
www.altaplanning.com/mvrpc/
Burgess & Niple
www.burgessniple.com
MVRPC: Kjirsten [email protected]