CSP BIOMASS HYBRIDIZATION CSP BIOMASS HYBRIDIZATION

Csp today chile 2013 rev 01 CSP - Biomass Hybridization

  • Upload
    esmesm

  • View
    226

  • Download
    1

Embed Size (px)

DESCRIPTION

Hybridization CSP - Biomass LCOE : 120 - 130 $/MWe

Citation preview

Page 1: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

CSP – BIOMASS HYBRIDIZATIONCSP – BIOMASS HYBRIDIZATION

Page 2: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

INGETEAM AROUND THE WORLD

Page 3: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

INGETEAM IN AMERICA

Ingeteam S.A. de C.V.

Ave. Revolución, 643, Local 9Colonia Jardín Español Monterrey N LColonia Jardín Español - Monterrey, N.L.64820 - MÉXICOTel.: (+52) 81 83 11 48 58ª[email protected]

Ingeteam Ltda.

Estrada Duílio Beltramini, 6075Ingeteam SpA

Estrada Duílio Beltramini, 6075Chácara São BentoCEP 13278-078 – Valinhos – São PauloTel.: (+55) 19 30 37 37 [email protected]

Bandera 883, Piso 2118340743 Santiago CHILETel. (+56) 2 2 672 33 [email protected] [email protected]@ingeteam.com

Page 4: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

REFERENCES

Page 5: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

CSP MAIN REFERENCES

Scope of Supply Operation Construction Planification Electrical Power

• INGETEAM CSP EXPERIENCE

EPC Power BlockPower Plant EngineeringControl System Supply

100 MW

Owner Engineering 140 MW

Solar Field Control System 150 MW

ySupply

150 MW

Electrical System Supply 100 MW

Feasiblity StudiesConceptual Engineering

360 MW

R&D F ibilt St diR&D Feasibilty StudiesConceptual Engineering

19 MW

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 6: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

BIOMASS MAIN REFERENCES

Scope of Supply Operation Construction Planification Electrical Power

• INGETEAM BIOMASS EXPERIENCE

EPC Power Plant EngineeringControl System Supply

10 MW

Basic design &Owner Engineering

32 MW

Basic design 32 MW

Electrical & Control equipment

27 MWq p

Basic design and administrative project

58 MW

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 7: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

SOLAR RESOURCE

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 8: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

BIOMASS RESOURCE

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 9: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

HYBRID POWER PLANT BIOMASS – CSP CONCEPTION

RESOURCES USES

SOLARSOLAR

THERMAL

ENERGY

HYBRIDIZATION

• HTF

• STEAM

STORAGE • DSG

• STEAM CYCLE

BIOMASS

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 10: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

HYBRIDIZATION CONCEPT

BIOMASSBIOMASS

POWER BLOCKSOLAR

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 11: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

HYBRIDIZATION CONCEPT

CSPCSP

• ANNUAL POWER PLANT

FACTOR

BIOMASSBIOMASS

• ANNUAL POWER PLANT

FACTOR

HYBRIDIZATIONHYBRIDIZATION

• ANNUAL POWER PLANT

FACTOR

• 25-40 %

• CAPEX

• 3 5 €/W

• 89 %

• CAPEX

• 2 5 3 5 €/W

• 50 - 80 %

• CAPEX

• 3 5 €/W• 3 - 5 €/W • 2,5 – 3,5 €/W • 3 - 5 €/W

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Page 12: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

HYBRIDIZATION EXAMPLES DNI 2300 KWh/m2/year

SOLAR RESOURCE

± 2300 kWh/m2/yearSOLAR – BIOMASS BOILER: 70% - 30%

SOLAR - BIOMASS PERCENTAGE: 41% - 59%

• Annual Net Electrical Generation: 132,2 GweAnnual Net Electrical Generation: 132,2 Gwe

• Turbine gross power: 35 MWe

• Biomass consumption: 87,890 ton

• LCOE: 123 $/MWh

SOLAR – BIOMASS BOILER: 45% - 55%

SOLAR – BIOMASS PERCENTAGE: 20% - 80%

• Annual Net Electrical Generation: 146,6 Gwe

• Turbine gross power: 26 MWe

• Biomass consumption: 146,580 ton

SOLAR – BIOMASS BOILER: 45% - 55%

SOLAR BIOMASS PERCENTAGE 33% 67%

• LCOE: 110 $/MWh

SOLAR – BIOMASS PERCENTAGE: 33% - 67%

• Annual Net Electrical Generation: 175 Gwe

• Turbine gross power: 26 MWe

• Biomass consumption: 122 385 ton

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

• Biomass consumption: 122,385 ton

• LCOE: 123 $/MWh

Page 13: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

HYBRIDIZATION EXAMPLES DNI 1950 KWh/m2/year

SOLAR RESOURCE

± 1950 kWh/m2/yearSOLAR – BIOMASS BOILER: 70% - 30%

SOLAR – BIOMASS PERCENTAGE: 39% - 61%

• Annual Net Electrical Generation: 128,42 GweAnnual Net Electrical Generation: 128,42 Gwe

• Turbine gross power: 35 MWe

• Biomass consumption: 89,540 ton

• LCOE: 130 $/MWh

SOLAR – BIOMASS BOILER: 45% - 55%

SOLAR – BIOMASS PERCENTAGE: 17% - 83%

• Annual Net Electrical Generation: 166,7 Gwe

• Turbine gross power: 26 MWe

• Biomass consumption: 150,700 ton

• LCOE: 120 $/MWh

SOLAR – BIOMASS BOILER: 45% - 55%

SOLAR BIOMASS PERCENTAGE 30% 70%SOLAR – BIOMASS PERCENTAGE: 30% - 70%

• Annual Net Electrical Generation: 173,8 Gwe

• Turbine gross power: 26 MWe

• Biomass consumption: 128 670 ton

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

• Biomass consumption: 128,670 ton

• LCOE: 132 $/MWh

Page 14: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

LEC or LCOE, LEVELISED COST OF ENERGYPLANTS

Plant Type LCOE (USD/MWh)

Conventional Coal 110

Conventional Combined Cycle 110

Advanced Nuclear 120

Hydro 100

Biomass 110Biomass 110

Wind 115

Solar PV 120

Geothermal 130

CSP - Geothermal 130

Conventional CSP 140

Micro CSP 200

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

Source: EIA (Energy Information Administration), NREL

Page 15: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

HYBRIDIZATION LCOE REDUCTION

CSP + TESCSP

NUCLEAR

LCO

E

PV

COALGAS BIOMASSWIND

HYDRO

LOW POWER PLANT FACTOR HIGH POWER PLANT FACTOR

RIC

ITY

CO

ST

NUCLEAR

PV

CSP + TESWIND

CSPELECTRICITY COST LCOE TRANSMISSION COST

ELEC

TR

NUCLEAR

COALGAS BIOMASSHYDRO

INGETEAM POWER TECHNOLOGY, S.A. – POWER PLANTS

LOW POWER PLANT FACTOR HIGH POWER PLANT FACTOR

Page 16: Csp today chile 2013 rev 01 CSP - Biomass Hybridization

THANK YOU FOR YOUR ATTENTION

Page.. [email protected]

Ingeteam Power Plants - Productos y Soluciones Pag. 16Junio 2011